HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #4601  
Old Posted Jan 19, 2026, 7:32 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,064
Quote:
Originally Posted by Dengler Avenue View Post
In Ontario, 950 m is the minimum radius for a design speed of 130 kph. In that case, M.T.I. may be designing Perimeter Highway for 120 kph (with posted speed limits of 100 kph).

I was mistaken in my earlier post about the CCW project. The Perimeter has a design speed of 130 km/h in that section. Found the document where that's referenced:

http://conf.tac-atc.ca/english/annualconference/tac2013/session2/mcritchie.pdf

Page 18 of the pdf has the specs I'm referring to.

So I can imagine the 101 and 100 Design Studies call for the whole highway to be rebuilt to a design speed of 130 km/h, like in Ontario.

I do wonder if they could have flattened the curve of the highway by just expropriating the Petro Can/Humptys and shifting the Perimeter slightly and maintaining the current PTH 3 alignment - rather than what seems like a more land-hungry project that is coming up quite expensive. I'm sure that was considered during the design study though.
Reply With Quote
     
     
  #4602  
Old Posted Jan 19, 2026, 7:35 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Ah there you go. Nice.
Reply With Quote
     
     
  #4603  
Old Posted Jan 28, 2026, 3:09 AM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 432
There is officially activity at the mcgilivray/100 interchange! Reduced speed signs and the entire field is cleared of snow. Maybe hydro relocation? Progress nonetheless!
Reply With Quote
     
     
  #4604  
Old Posted Jan 28, 2026, 3:13 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Quote:
Originally Posted by Wpgstvsouth94 View Post
There is officially activity at the mcgilivray/100 interchange! Reduced speed signs and the entire field is cleared of snow. Maybe hydro relocation? Progress nonetheless!
I bet that Humpty's location is pissed off. I guess they will be relocating.
Reply With Quote
     
     
  #4605  
Old Posted Jan 28, 2026, 3:43 AM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 432
Quote:
Originally Posted by harls View Post
I bet that Humpty's location is pissed off. I guess they will be relocating.
It’s hard to say that area where the current perimeter highway is prime land for restaurants, stores, apartments, condos, etc. it might actually benefit them. They’ll be right along the offramp exit.
Reply With Quote
     
     
  #4606  
Old Posted Jan 28, 2026, 7:02 PM
bryan_ca bryan_ca is offline
Registered User
 
Join Date: Sep 2022
Posts: 28
Quote:
Originally Posted by Wpgstvsouth94 View Post
It’s hard to say that area where the current perimeter highway is prime land for restaurants, stores, apartments, condos, etc. it might actually benefit them. They’ll be right along the offramp exit.
They just need to put up a U.S.-Midwest-style high-mast sign that you can see for miles. 😂😂
Reply With Quote
     
     
  #4607  
Old Posted Jan 30, 2026, 5:06 AM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 432
Quote:
Originally Posted by bryan_ca View Post
They just need to put up a U.S.-Midwest-style high-mast sign that you can see for miles. 😂😂
Yes we need more of these haha! Same with the blue attractions signs showing restaurants at each exit. Ontario has them!
Reply With Quote
     
     
  #4608  
Old Posted Jan 30, 2026, 3:15 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
When you don't have to pre-exit on the highway, there's not much use for those blue signs! You can just hang a hard right at the traffic signals! lol
Reply With Quote
     
     
  #4609  
Old Posted Jan 31, 2026, 8:20 PM
Kinguni's Avatar
Kinguni Kinguni is offline
Registered User
 
Join Date: Mar 2008
Location: Manitoba
Posts: 1,570
Quote:
Originally Posted by cllew View Post
I have read online during the flood of the century that the south and west Perimeter Hwy were part of the primary flood protection system.

Does anybody know if that is true, as making changes to highway locations and elevations to that portion may impact the cost of the project?
South Perimeter was a last line of defence for Winnipeg if the Morris River had back flowed into the La Salle River. Brunkild Dike was temporarily beefed up with anything they could find, including scrapped vehicles. The Z dike has since been permanently built up.
Reply With Quote
     
     
  #4610  
Old Posted Mar 25, 2026, 4:53 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,397
Anything in the Provincial budget for the Perimeter ?
Reply With Quote
     
     
  #4611  
Old Posted Mar 25, 2026, 5:21 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,756
Quote:
Originally Posted by craner View Post
Anything in the Provincial budget for the Perimeter ?
Just a 24/7 snow clearing pilot otherwise nothing and this mention: Construction of a new interchange at Perimeter Highway and PTH 3 (McGillivray Boulevard)
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Last edited by Wpg_Guy; Mar 25, 2026 at 7:59 AM.
Reply With Quote
     
     
  #4612  
Old Posted Apr 8, 2026, 9:32 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Any progress at McGillivray interchange site or are they still thinking about it?
Reply With Quote
     
     
  #4613  
Old Posted Apr 8, 2026, 9:59 PM
rivercity rivercity is offline
Registered User
 
Join Date: Mar 2018
Location: Winnipeg
Posts: 274
Tree clearing had started last week or the week before i believe
Reply With Quote
     
     
  #4614  
Old Posted Apr 9, 2026, 2:04 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 432
Glp I believe they are called has been surveying and tree clearing for the past going on a month I would say. This morning on my commute into work they have full on heavy machinery there now and piles of sand and mud going in.
Reply With Quote
     
     
  #4615  
Old Posted Apr 9, 2026, 3:23 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Nice, good news. GIP used to be Nelson River from my understanding.
Reply With Quote
     
     
  #4616  
Old Posted Apr 9, 2026, 5:21 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,811
Quote:
Originally Posted by bomberjet View Post
Nice, good news. GIP used to be Nelson River from my understanding.
Name changed in Aug 2025 when Nelson river was bought out by Green Infrastructure Partners.
Reply With Quote
     
     
  #4617  
Old Posted Apr 9, 2026, 7:06 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,887
GIP includes Green Infrastructure Partners Inc. (formed pursuant to the amalgamation with GFL Infrastructure Inc. and Ground Force Environmental Corp.); GIP Paving Inc. (formerly Coco Paving Inc.); GIP Aggregates Inc., (formerly Coco Aggregates Inc.); Russell Redi-Mix Concrete; Langenburg Redi-Mix Ltd.; GIP Pipe Products Inc. (formerly Co-Pipe Inc.), Lorvin Steel Ltd and GIP Construction Engineering Corp. (formerly Aecon Materials Engineering Corp.), West Carleton Sand & Gravel Inc., GIP Construction and Materials Limited (formerly Aecon Construction and Materials Limited) and GIP Construction Ontario East Ltd. (formerly Aecon Construction Ontario East Ltd.)
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4618  
Old Posted Apr 9, 2026, 7:40 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
These guys changed to GIP in Aylmer in 2022, from the street view pics of their office.

https://maps.app.goo.gl/4Y9egL1AkqL7nKod6

https://maps.app.goo.gl/2zcjsfY3Nov43Qpu7
Reply With Quote
     
     
  #4619  
Old Posted Apr 9, 2026, 11:12 PM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 944
The project was bid by the Russell Redi-mix people before Nelson River was bought. The Nelson River people will do much of the construction. But they are all GIP now.

MD Steele is doing the bridge deck and Dillon is doing the engineering. There's a few other subs for smaller tasks, but I don't know who they are.
Reply With Quote
     
     
  #4620  
Old Posted Apr 30, 2026, 4:08 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 854
No pics, but I drove through McGillivray and the Perimeter intersection yesterday and there is definitely site prep work underway. As someone else mentioned earlier there has been a lot of brush/tree removal on the southeast side and there is also drainage work going on in the field east of the gas station. Construction signs are up as well.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.