  #4581  
Old Posted Jan 17, 2026, 9:05 PM
plrh plrh is online now
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 946
Quote:
Originally Posted by The Jabroni View Post
Just for comparisons sake, how much was the full interchange redesign and construction for 101/59 from almost a decade ago, which of course involved 6 bridge spans and other things and at the time, also had a high price tag?
$204m according to google
Reply With Quote
     
     
  #4582  
Old Posted Jan 18, 2026, 12:56 AM
bryan_ca bryan_ca is offline
Registered User
 
Join Date: Sep 2022
Posts: 31
Maybe they should have gone "Regina bypass" on it and just done everything for "one low price" (haha), and maybe throw in the St. Norbert bypass. That project had 12 overpasses. Perimeter needs about that many (I didn't count).
Reply With Quote
     
     
  #4583  
Old Posted Jan 18, 2026, 2:39 AM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,068
Quote:
Originally Posted by Biff View Post
The big thing about these projects and their overall cost is they seem to include massive amounts of road realignment/reconstruction. Most other cities would simply build a diamond overpass over the existing highway - $30-$50m and you are done.

I’m not really sure why they are creating such vast reconstructions.
Could it be to ensure design speed of 160 km/h? The current curve between PTH 2 and McGillivray on the Perimeter is definitely too sharp to allow for that.

IIRC the reconstruction around the Centreport interchange called for the Perimeter to have a design speed of 160 km/h, and you can tell the quality of the highway is drastically different and more modern than the segments that lead into it.

I don't remember reading 160km/h anywhere in the South Perimeter Design Study publications, but that might not be publicly shared since some media outlet would misinterpret it as speed limits being raised to 160 km/h.

The curve south of Fermor/100 is also softened in the proposed designs.

Last edited by WildCake; Jan 18, 2026 at 2:40 AM. Reason: missing word
Reply With Quote
     
     
  #4584  
Old Posted Jan 18, 2026, 4:19 AM
The Jabroni's Avatar
The Jabroni The Jabroni is offline
Go kicky fast, okay!
 
Join Date: Nov 2003
Location: Winnipeg, Donut Dominion
Posts: 3,365
Quote:
Originally Posted by plrh View Post
$204m according to google
Hmm, not too far off. Even adjusted for inflation, assuming that price tag at $204 million in 2017 ($257 million in 2025/2026), this new interchange at 3/100 would be $22 million dollars cheaper in comparison with today's money.
__________________
Back then, I used to be indecisive.

Now, I'm not so sure.
Reply With Quote
     
     
  #4585  
Old Posted Jan 18, 2026, 4:56 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,404
Quote:
Originally Posted by Highwayman View Post
4 years to do this thays nuts. 2030 is a long way to completion. So that will take the St Annes one till 2034 lol
Why on earth would this work take 4 years to complete ?
Reply With Quote
     
     
  #4586  
Old Posted Jan 18, 2026, 12:07 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Something’s just occurred to me: what’s the slope profile of Perimeter Highway right now?
Back in the days, some roads were built with 0% slope on flat terrain. (Even MTO did that.) Nowadays, that’s a big no-no especially in floodprone area like Winnipeg.
If M.T.I. has to redo the slopes (from 0% to 0.5%), that will definitely add to the cost.

Admittedly my tone came off arrogant in an earlier post. My point is that there are more than what meets the eyes when it comes to accounting for ground condition.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #4587  
Old Posted Jan 18, 2026, 4:23 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,068
Quote:
Originally Posted by Dengler Avenue View Post
Something’s just occurred to me: what’s the slope profile of Perimeter Highway right now?
Back in the days, some roads were built with 0% slope on flat terrain. (Even MTO did that.) Nowadays, that’s a big no-no especially in floodprone area like Winnipeg.
If M.T.I. has to redo the slopes (from 0% to 0.5%), that will definitely add to the cost.

Admittedly my tone came off arrogant in an earlier post. My point is that there are more than what meets the eyes when it comes to accounting for ground condition.
Most of the roadwork is greenfield new construction, so the slope profile should be modernized regardless of current status. I don't know what standards the old segments were built to.

As for cost:

Using Biff's estimate and round up, let's assume the bridge portion costs 60 million. That's still 175 million left for ~3 km of new 4 lane road, ~3 km of new PTH 3, and a handful of reroutes of residential grade local roads, collectors, and service roads.

The utilities relocation is probably on par to what had to move for the St Mary's interchange.

The real distinction between St Mary's and this project - as others have pointed out - is the amount of land acquisition required. Prime farmland that would have been urbanized into Oak Bluff eventually, so the fair market value was probably quite high. Adding to this, there was an article saying the way the parcels of farmland were being chopped up would make it challenging or impossible to farm them, so some landowners may have negotiated a heftier payout.

https://www.ctvnews.ca/winnipeg/article/...-expropriation-over-interchange-project/
Reply With Quote
     
     
  #4588  
Old Posted Jan 18, 2026, 5:05 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,827
Quote:
Originally Posted by WildCake View Post
Could it be to ensure design speed of 160 km/h? The current curve between PTH 2 and McGillivray on the Perimeter is definitely too sharp to allow for that.

IIRC the reconstruction around the Centreport interchange called for the Perimeter to have a design speed of 160 km/h, and you can tell the quality of the highway is drastically different and more modern than the segments that lead into it.

I don't remember reading 160km/h anywhere in the South Perimeter Design Study publications, but that might not be publicly shared since some media outlet would misinterpret it as speed limits being raised to 160 km/h.

The curve south of Fermor/100 is also softened in the proposed designs.
I believe that North American highways were designed for a higher speed than the posted speed to keep them somewhat more safe when the people that knowingly exceed the posted limits are driving on them.

I think its usually a 10 to 20km design difference between posted and design speeds.
Reply With Quote
     
     
  #4589  
Old Posted Jan 18, 2026, 5:29 PM
The Jabroni's Avatar
The Jabroni The Jabroni is offline
Go kicky fast, okay!
 
Join Date: Nov 2003
Location: Winnipeg, Donut Dominion
Posts: 3,365
Quote:
Originally Posted by WildCake View Post
Most of the roadwork is greenfield new construction, so the slope profile should be modernized regardless of current status. I don't know what standards the old segments were built to.

As for cost:

Using Biff's estimate and round up, let's assume the bridge portion costs 60 million. That's still 175 million left for ~3 km of new 4 lane road, ~3 km of new PTH 3, and a handful of reroutes of residential grade local roads, collectors, and service roads.

The utilities relocation is probably on par to what had to move for the St Mary's interchange.

The real distinction between St Mary's and this project - as others have pointed out - is the amount of land acquisition required. Prime farmland that would have been urbanized into Oak Bluff eventually, so the fair market value was probably quite high. Adding to this, there was an article saying the way the parcels of farmland were being chopped up would make it challenging or impossible to farm them, so some landowners may have negotiated a heftier payout.

https://www.ctvnews.ca/winnipeg/article/...-expropriation-over-interchange-project/
That makes total sense. The land acquisition needed for the reroute of the Perimeter Highway to divert away from existing businesses close to the intersection would increase the cost.

Everything else is gravy at this point.
__________________
Back then, I used to be indecisive.

Now, I'm not so sure.
Reply With Quote
     
     
  #4590  
Old Posted Jan 18, 2026, 6:51 PM
plrh plrh is online now
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 946
Quote:
Originally Posted by craner View Post
Why on earth would this work take 4 years to complete ?
It's 3 summers of construction and 1 summer of electrical work and seeding. So 3 x 8 months is 24 months of civil work in 4 years.
Reply With Quote
     
     
  #4591  
Old Posted Jan 18, 2026, 9:49 PM
jim_bred jim_bred is offline
Registered User
 
Join Date: Aug 2025
Posts: 213
People underestimate how much work these projects are...it's not just a bridge.
Reply With Quote
     
     
  #4592  
Old Posted Jan 19, 2026, 12:43 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,318
With this schedule ill imagine theyre shutdown over winters. So basicslly 3 construction seasons of work. With the 2029 season being finishing work as was mentioned. In service date maybe fall 2028? Not sure if that date is out there somewhere.

2 construction season maybe couldve been done with additional crews and over winter work. Would probably be more costly that way.

What is the status of land acquisition? Thats wasnt complete yet IIRC.
Reply With Quote
     
     
  #4593  
Old Posted Jan 19, 2026, 12:45 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,318
Okay wait I just misread. So its 4 years of construction. In service 2029. Completion 2030. Seems long.
Reply With Quote
     
     
  #4594  
Old Posted Jan 19, 2026, 2:35 AM
Highwayman Highwayman is online now
Registered User
 
Join Date: Apr 2021
Location: Winnipeg
Posts: 310
Quote:
Originally Posted by craner View Post
Why on earth would this work take 4 years to complete ?
It was posted on a provincial site that they beleive construction would end im 2030
Reply With Quote
     
     
  #4595  
Old Posted Jan 19, 2026, 5:58 PM
Andy6's Avatar
Andy6 Andy6 is offline
Starring as himself
 
Join Date: Mar 2002
Location: Toronto Yorkville
Posts: 9,764
Quote:
Originally Posted by WildCake View Post
Could it be to ensure design speed of 160 km/h? The current curve between PTH 2 and McGillivray on the Perimeter is definitely too sharp to allow for that.

IIRC the reconstruction around the Centreport interchange called for the Perimeter to have a design speed of 160 km/h, and you can tell the quality of the highway is drastically different and more modern than the segments that lead into it.

I don't remember reading 160km/h anywhere in the South Perimeter Design Study publications, but that might not be publicly shared since some media outlet would misinterpret it as speed limits being raised to 160 km/h.

The curve south of Fermor/100 is also softened in the proposed designs.
When they built the Perimeter they largely followed the alignments of the existing section roads and disturbed the farm lots as minimally as they could. The changes of direction on the northeast and southeast sides are where it hits the old French river lots and veers off to follow their boundaries. None of this was optimizing for modern speed limits, needless to say.
__________________
crispy crunchy light and snappy
Reply With Quote
     
     
  #4596  
Old Posted Jan 19, 2026, 6:16 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,318
Reagrding design speed. 160 km/h is extreme and I doubt was actually used. I dont know of any curves that would meet this requirements. Especially since the province is flattening curves at Symington Road for example.

The drawings for McGillvray show a radius of 950m for the curve near the railway crossing. That would lead me to believe design speed is 110km/h or maybe 120km/h based on google searching some tables. It's dependent upon superelevation.

I don't know if they have plans to upgrade speed limit to 110 km/h at some point in the future.

Last edited by bomberjet; Jan 19, 2026 at 6:44 PM.
Reply With Quote
     
     
  #4597  
Old Posted Jan 19, 2026, 6:20 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,827
I have read online during the flood of the century that the south and west Perimeter Hwy were part of the primary flood protection system.

Does anybody know if that is true, as making changes to highway locations and elevations to that portion may impact the cost of the project?
Reply With Quote
     
     
  #4598  
Old Posted Jan 19, 2026, 6:22 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Quote:
Originally Posted by bomberjet View Post
Reagrding design speed. 160 km/h is extreme and I doubt was actually used. I dont know of any curves that would meet this requirements. Especially since the province is flattening curves at Symington Road for example.

The drawings for McGillvray show a radius of 950m for the curve near the railway crossing. That would lead me to believe design speed is 110km/h or maybe 120km/h based on google searching some tables. It's dependent upon superelevation.
The province has been widening curves in rural areas (Hwy 2 near Haywood and 3 by Sperling come to mind).
Reply With Quote
     
     
  #4599  
Old Posted Jan 19, 2026, 6:45 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,318
Quote:
Originally Posted by cllew View Post
I have read online during the flood of the century that the south and west Perimeter Hwy were part of the primary flood protection system.

Does anybody know if that is true, as making changes to highway locations and elevations to that portion may impact the cost of the project?
I think the Brunkhild Z dike covers that now.
Reply With Quote
     
     
  #4600  
Old Posted Jan 19, 2026, 6:50 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by bomberjet View Post
Reagrding design speed. 160 km/h is extreme and I doubt was actually used. I dont know of any curves that would meet this requirements. Especially since the province is flattening curves at Symington Road for example.

The drawings for McGillvray show a radius of 950m for the curve near the railway crossing. That would lead me to believe design speed is 110km/h or maybe 120km/h based on google searching some tables. It's dependent upon superelevation.

I don't know if they have plans to upgrade speed limit to 110 km/h at some point in the future.
In Ontario, 950 m is the minimum radius for a design speed of 130 kph. In that case, M.T.I. may be designing Perimeter Highway for 120 kph (with posted speed limits of 100 kph).
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:34 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.