Edward R. Roybal Learning Center

Beaudry and 1st
Los Angeles CA United States
http://laschools.org/belmontlc

Status:
built
Construction Dates
  Began1996
Floor Count5
Units / Rooms109
Building Uses
 - education
Structural Types
 - lowrise



Description
This 200 million dollar fiasco, designed to relieve pressure on the old and overcrowded Belmont High in downtown LA was constructed on the site of an abandoned oil field. Halfway through its construction, it was found that the site was severely toxic, forcing construction to be stopped. Later on it was discovered that part of the structure sits on top of a fault line. No completion date has been set.

In mid 2003, plans were made to demolish two of the buildings that sit on the fault line, and replace them with new structures. The remaining buildings are planned to be completed. No date is given.


Google Search  • Images
  
  

Drawing by A Twu
© SkyscraperPage.com




Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.