Description In 2014, construction of the Väo 2 power plant with 21.4 MW of electrical power and 76.5 MW of heat capacity started. Like Väo 1 ( https://skyscraperpage.com/cities/?buildingID=148645 ), it is fired by wood chips and peat. The main contractor was Axis Technologies. The turbine was supplied by MAN SE. The plant was commissioned in 2016.
Do you see any incorrect data on this page? Please let our editors know of any corrections you can provide by posting them in the Database Corrections section of the discussion forum (open to the public).