There are rumblings that something will be blocking the view from the Osprey on Howell Mill.
This is setting up for another big wave of development along Howell Mill/Marietta St. There's the apartments and hotel planned for Star Metals, the office project a couple of posts above and the Drapac sites.
Yeah 5 sites between 9th, 11th, Howell Mill, & Watkins. I wonder how long sites along the Brady Curve can hold out from being redeveloped.
Plans call for a mixed-use development that will feature two separate and distinct multifamily buildings totaling 576 units at the site. Groundbreaking is expected in the third quarter of 2022 with the delivery of the first phase in the third quarter of 2023. The joint venture has retained architecture and design firm Lord Aeck Sargent.
I hope they offer scooter or bike rentals. Having quick and easy access from the GWCC and Benz would be beneficial to them, and the Westside Park is not too far away either.
Stream Realty Partners has filed plans with the state to replace a 116,000-square-foot warehouse with 665 apartments and 30,000 square feet of commercial space.
The redevelopment would rise on about five acres at 1355 and 1359 Ellsworth Industrial Boulevard, according to a Developments of Regional Impact filing. The project could be completed as early as 2025, according to the filing.