WESTSIDE Development Thread


Pretty sure it’s dated. Look at all those lush green trees.

Plus star metals residential is under construction (bright green siding), star metals office isn’t particularly noticeable, interlock has bright yellow siding, 788 crane is still up, and you don’t see 1105 WP.

Damn, you're extremely observant.
 
The Interlock

160956672_267951544962018_615228356746649011_n.jpg

https://www.instagram.com/p/CMdSVhyJhyZ/

1614021948270

https://www.linkedin.com/posts/s-j-collins_westmidtown-activity-6769698719773409280-XI1B
 
I'll go against the general sentiment of the Interlock: I hate the parking garage and it sucks they didn't go through with lining the southern side of the garage with rental units like they were originally going to do. The fake grass is just awful and takes the whole project down some for me personally. I still love the Howell Mill street side though.
 
Chicago Developer Plans 14-Story Office Project

https://whatnowatlanta.com/chicago-developer-plans-14-story-office-project-near-west-midtowns-brickworks/

Sterling Bay has plans to develop a 14-story office building adjacent to Asana Partners‘ newly acquired Brickworks development in West Midtown, according to rezoning application documents filed with the city late last month.

The Chicago-based company is the applicant behind a rezoning request for 1026, 1050, and 1060 Marietta St. NW that could pave the way for a more than 200-foot-tall, 215,788-square-foot creative loft office space project at the southeast intersection of West Marietta, Marietta, and 8th Streets, plans show.

The project would hold seven stories of office space over six levels of above-grade parking, a ground floor with 12,000 square feet of sidewalk-level retail, and one level of below-grade parking. Plans call for 570 parking spaces.
 

So much parking. 🥸

Right....

Actually, that's not a lot of parking. I don't think most people understand the number of people these types of development draw. What the demand for parking is by tenants, office workers, or retail customers. Especially considering the area this will be built in.

With the 12,000 sqft of retail, assuming a ratio of 3 spaces per 1000 sqft that's 36 parking spaces. With ~216K sqft of office space, divided by the remaining spaces, we get 2.486 or 2.5 spaces for 1000 sqft of office space. Compare that parking ratio to what we're seeing in Midtown, around 1.87, and it's higher, but not like what you'd find in the suburbs.

In the suburbs, we're looking at ratios of 3.5,4,4.5 as average with some locations asking for higher. Obviously Covid has and will impact this going forward, but it's too early to tell what the lasting impacts will be.

The trend in offices for the past several years has been to densify the number of employees in the workplace. We went from 325 sqft per person in 2001 to ~125sqft per person. At the 325 mark, this building would house roughly 665 people, at 125, we're looking at 1,728 employees. If we go by the 2020 average, we're looking at 1,080 office workers for this building.

We're looking at far fewer parking spaces than the expected number of workers this project will house. Obviously not everyone will be there at the same time, so some of the pressure will be reduced. But when you consider everything in context, this isn't a lot of parking for a project of this size in this area.
 
Half the development is proposed as parking. 7 stories of parking topped by 7 stories of office. We don’t need to make excuses here.

I'm not making excuses, merely explaining why this isn't a lot of parking.

I working in a building roughly 1400 feet (doorstep to doorstep) from a Marta station. My building has a parking ratio of 2.5 spaces per 1000 feet. But I don't take the train because I don't live anywhere near a station. I could take a bus, but the nearest bus stop on a line that's convenient to me is also 1400 feet from my office. The nearest stop to my apartment is about a half mile. Neither of those are distances I care to walk, especially up and down hills, in weather, etc.

Couple that with the fact that I can drive to work faster than I can walk to/from the bus and you'll quickly understand why transit isn't all it's cracked up to be.

People on here like to bemoan above ground parking. The fact is, building parking below grade is expensive. Heck, building it as a podium is expensive. Structured parking as a freestanding building that's using precast concrete can run around $23,000.00 a parking space. Change that to cast in place, allowing the shape to be changed and/or support a structure above, and you're looking at 70-80% increase in cost. Those numbers are still cheaper than digging down. Below grade parking can run $80,000+ a space depending upon site conditions.

I don't have the numbers in front of me to explain the increase in rent needed to cover the increase in construction costs by going underground for parking, but Atlanta isn't anywhere near being able to support that en masse.
 
You know what’s cheaper than building underground or above ground parking?

Not building said parking that goes unoccupied the majority of its lifespan.

More so because someone selected a parking to square footage ratio calculation based off peak demand with working conditions prior to accelerated transition to flex office time and telecommuting, as well as a land use that’s obsolete in one of the fastest growing areas in the southeast.
 


Back
Top