Updated 75 E Broadway renderings.
Updated 75 E Broadway renderings.
that design looks so much better THANK GOODNESS. also is there anything that can be done about the height cap? i don't really understand why we still have it, i think it's ridiculous saying that 330 feet obstructs any mountain views
Pretty sure the city would make things work if someone came along and wanted to build above the height limit. That's not what's preventing construction beyond that point right now, though.
Well all I can say is I made countless appeals to both Peach Properties and Schwab to push this to be the tallest bldg in Tucson since we haven't had one built in 35 years. I even rendered what it could look like. I also suggested cutting the footprint of the structure down to 1/2-3/4 of the lot and go higher instead so they have the same bldg square footage. None of them responded or entertained my idea. This building is going to be massive in terms of width. A whole city block. Wider than all other 3 skyscrapers for sure. I think its a bit excessive. I would have preferred a thinner skyscraper with height.
Listened in on the Rio Nuevo meeting on Tuesday and got some notes. I had sound issues on my laptop so I think I missed some things but here were some of my takeaways:
* Reilly Craft pizza wants to add a rooftop deck to it's space. Requested $200k but RN is agreeing to help with half if they plan on opening soon. ADS reported this recently.
* Swaim says extra meeting room space at TCC should be done in January 2022 and the renovations are underway at the Eckbo Plaza, I believe.
* 8 additional parkletts (outdoor seating) was approved.
* Gadsen Company presented an overview of MSA, MSA annex, Monier, and The Bautista. Says that sales are picking up at MSA annex and one of the tenets, Why I Love Where I Live, made $92k in December which was record breaking for them. Also, they added more shade in the annex and brick pavement to the stage entertainment area.
![]()
Monier apartments are nearing the construction finish line and will include retail as well. One tenet will be expanding from MSA annex into Monier and the other is from California. Gadsen Co. wants to include a Wellness Center on parcel D which is directly south of the Bautista. I didn't catch anything else on the Bautista or the construction timeline, unfortunately, except that RN extended the "closing date" to end of August.
*Perhaps the biggest news at the meeting was that a major production network is interested in coming to Tucson with a presence in the downtown area I believe. Fletcher says this could potentially be an economical gain of $160 million per year with a production crew of a 100 staying year round. They are trying to entice them with the help of Visit Tucson and maybe the governor.
What do you mean a "major production network"? Are we talking along the lines of Netflix or something like that? I only say that because I have inside info Netflix and ABQ Studios were trying to acquire Old Tucson Studios but Pima County officials have always had other plans for OTS. I've already heard who will win the contract. But having any film production network here to support the film industry would be amazing.
There wasn't any additional details but apparently it is a well known Network. I think we will know in May since apparently that's when the Network wants things to get moving..
Do you know if they have these meetings recorded to watch? I'd love to hear what they said. I know they publish a transcript but that isn't released until the next meeting. Meaning I wont hear what was said until May 25th. Regardless...I hope they dont screw up this potential opportunity. Thanks for relaying the info! From what I've heard there are 3 new westerns in development from ViacomCBS. I'm guessing its one of those.