Tucson Development Thread


I hope I'm wrong, but it makes me think this is not a viable project. I don't believe there's enough demand for office or retail space in downtown Tucson.
 
I hope I'm wrong, but it makes me think this is not a viable project. I don't believe there's enough demand for office or retail space in downtown Tucson.

I had heard that 60% of the building had commitments. Those commitments were pegged to a 2021 opening, so construction had to start Q4 of 2019 in order to hit that date.
 
not the *most exciting* since its not in downtown but i got a couple snapshots of the casino del sol expansion
yfpJ2K6.jpg

djwTlf9.jpg
 
Last edited:
Rio Nuevo restructured their incentive at the last board meeting. It is now broken into three parts: retail, parking and office. The office floors are now also going to be condo-ed. Pretty sure they are just trying to make the economic analysis required for these incentives pencil out. Building height remains at 12 stories.

Don't know how this specifically relates, but JE Dunn is planning to/in the process of transferring their ownership stake in the building according to Real Estate Daily News.
 
Don't know how this specifically relates, but JE Dunn is planning to/in the process of transferring their ownership stake in the building according to Real Estate Daily News.

Then would it be too late to change the design and height with new ownership? :haha:

In Other news: from Tucson.com

Closed down Target on Broadway will be a Super Home Décor

Leman Academy is expanding its building at 12255 N. La Cañada Drive with a $6.8 million permit.

A $5 million permit was issued for the new apartment complex in Main Gate Square, 900 E. Second St.

A $3.6 million permit was issued for eight units at Splendido Villas, 13500 N. Rancho Vistas.

At Home Décor Superstore got a $2.6 million permit to remodel the vacant Target store at 5255 E. Broadway.

The Pima County Courthouse at 115 N. Church Ave. took out a $2.1 million permit for renovations.

Harkins Theater at 5455 S. Calle Santa Cruz is upgrading seating and concession offerings with a $2 million permit.

Tu Simple got a $714,659 permit to add a second floor at 9538 E. Old Vail Road.

A 9,000-square-foot warehouse is going up at 1555 E. 22nd St. with a $603,810 permit.

HSL Center of Opportunity got a $603,669 permit for the shell building at 4550 S. Palo Verde Road.

A new, $480,425 Circle K is under construction at 4965 W. Ajo Way.
JTED at The Bridges got a $444,772 permit for the foundation of its future school at 3300 S. Park Ave.
 
Then would it be too late to change the design and height with new ownership? :haha:

In Other news: from Tucson.com

Closed down Target on Broadway will be a Super Home Décor

Leman Academy is expanding its building at 12255 N. La Cañada Drive with a $6.8 million permit.

A $5 million permit was issued for the new apartment complex in Main Gate Square, 900 E. Second St.

A $3.6 million permit was issued for eight units at Splendido Villas, 13500 N. Rancho Vistas.

At Home Décor Superstore got a $2.6 million permit to remodel the vacant Target store at 5255 E. Broadway.

The Pima County Courthouse at 115 N. Church Ave. took out a $2.1 million permit for renovations.

Harkins Theater at 5455 S. Calle Santa Cruz is upgrading seating and concession offerings with a $2 million permit.

Tu Simple got a $714,659 permit to add a second floor at 9538 E. Old Vail Road.

A 9,000-square-foot warehouse is going up at 1555 E. 22nd St. with a $603,810 permit.

HSL Center of Opportunity got a $603,669 permit for the shell building at 4550 S. Palo Verde Road.

A new, $480,425 Circle K is under construction at 4965 W. Ajo Way.
JTED at The Bridges got a $444,772 permit for the foundation of its future school at 3300 S. Park Ave.

The home decor store at the old target really bums me out. I heard rumblings of a Whole Foods there. That would have been soo much better for that area with their built in sushi bars and other food options for the expanding Williams center. What a missed opportunity. As for the home decor store. I feel it would be much better suited at the old Kmart location.
 
Per Joe Ferguson's Twitter feed, the City Council approved the GPLET for HSL/Pueblo Center Partners' redevelopment of the Hotel Arizona/Hyatt Regency.
 
On another note, by my calculation, we're approximately a year out from Nor-Gen's deadline to invest $10,000,000 in hard construction costs at the arena site. Unless terms changed without our knowledge, Nor-Gen had 42 months from the date the Greyhound station was relocated to make that investment and the Greyhound station was relocated in March 2017.
 
4 story apartment building with ground floor restaurant planned for the the SE corner of Stone and 14th st (The old Casa Vicente lot).

2019-09-10.png
 