Tucson Development Thread


Found some new renderings of the Moxy/Element Hotel. The Broadway facing side looks a little bland and I wish that the 60 foot tall cage surrounding the parking would be better incorporated into the facade of the upper floors. Definitely a unique building and will stand out nicely IMO. I appreciate that it's not the basic "five over podium" that was posted by crzyabe. Not that those buildings are necessarily bad looking and seem to be valuable to low density cities like ours. The Moxy will likely be skyline changing to a small extent. I wonder how tall it'll be. Seems like it'll be the tallest building built in Tucson since 1 South Church in the 80's. :cheers:

Even without major changes to the skyline, downtown has gotten much nicer and full of life again with the smaller buildings. It's a wonderful place to be which it really hasn't been for much of my life so far. I can't wait to be there once this next wave of construction starts and finishes.

http://www.jdp-arc.com/moxy-element-dual-hotels/r30ltdaz1s0fpq12gusj05o8g30ku4
 
Last edited:
Found some new renderings of the Moxy/Element Hotel. The Broadway facing side looks a little bland and I wish that the 60 foot tall cage surrounding the parking would be better incorporated into the facade of the upper floors. Definitely a unique building and will stand out nicely IMO. I appreciate that it's not the basic "five over podium" that was posted by crzyabe. Not that those buildings are necessarily bad looking and seem to be valuable to low density cities like ours. The Moxy will likely be skyline changing to a small extent. I wonder how tall it'll be. Seems like it'll be the tallest building built in Tucson since 1 South Church in the 80's. :cheers:

Even without major changes to the skyline, downtown has gotten much nicer and full of life again with the smaller buildings. It's a wonderful place to be which it really hasn't been for much of my life so far. I can't wait to be there once this next wave of construction starts and finishes.

http://www.jdp-arc.com/moxy-element-dual-hotels/r30ltdaz1s0fpq12gusj05o8g30ku4

Thanks for finding this. It is a large project and I hope the developers are serious about it because I feel pretty shafted about the je dun project :haha:
 

They finished the electrical vaults and have moved on to hole

zGY8fFZ.jpg
 
They are tearing down the Casa Vicente building on South Stone. I have heard there are plans for a multi-level condo building with ground floor retail. Casa Vicente might be included in the new plans, but not sure.
 
They are tearing down the Casa Vicente building on South Stone. I have heard there are plans for a multi-level condo building with ground floor retail. Casa Vicente might be included in the new plans, but not sure.

At least from their update last August, they were still expecting to be in the same location once the new building is up.
 
Aspire Tucson Phase II to Offer High-Rise Living

Developer, The Dinerstein Companies of Houston is doubling down on their investment in student housing near the University of Arizona by proposing a new, 130-unit high-rise just two blocks from campus. The eight-story building, dubbed Aspire Tucson Phase II, is directly west of Aspire Tucson, a 12-story community set to open in August 2019.

The mixed-use student housing development is located in the heart of the Main Gate entertainment district and will replace the current Chase Bank site at the SWC of Park Avenue and First Street. The property is zoned C-1 and thus the height and density are appropriate for student housing near the University.

Aspire Tucson Phase II isn’t just a step up from a dormitory – from the underground parking garage to the rooftop pool, residents will find modern amenities and a sense of community within the shared living spaces. Thirteen studios, 26 two-bedroom, six three-bedroom, 46 four-bedroom, 19 five-bedroom and 20 six-bedroom units are available, with each student signing individual leases.

With 228KSF of living space and 5,700 SF of retail, Aspire Tucson Phase II will offer students the ability to live, study and recreate on-site. Amenities like a social lounge, tanning room, fitness center, indoor/outdoor bike room, private study rooms and study café, fenced-in pet park and outdoor gaming courtyard make sure students only need to leave to attend class.

If students do choose to venture out, the site will encourage multi-modal transportation, being within walking distance of the University and two streetcar stops. A ride-share pick-up zone will provide access to ride-share vehicles while not blocking traffic along Park Avenue or 1st Street. Aspire Tucson Phase II will also meet the environmentally conscious design requirements of the Main Gate Overlay District (MGO), and the developer’s goal for the Project is a silver LEED certification.

According to the developer’s application, “While both this project and Aspire I share similar design elements, materials and colors, the project has a unique design that is illustrated in the design package. The project uses a variety of materials, colors, bulk reductions and fenestrations to create an interesting design that complies with MGO. Of significance is the project’s east side facing the University, where the design incorporates a series of vertical and horizontal articulations different from any other MGO project.”
 
Grimm Commercial Bringing RoadHouse Cinemas to Northwest Tucson

An investment group of seven LLCs managed by Steve Grimm of Grimm Commercial has acquired the Fiesta Plaza at the northwest corner of Oracle and River Road in Tucson for $5.3 Million and is planning to bring RoadHouse Cinemas to the site.

The acquisition followed the sale of a ground lease in Marana with a leased fee interest to Village Inn at 5955 W Arizona Pavilions Drive for $2.6 million and was the downleg in the 1031 exchange.

The Fiesta Plaza purchase includes the Red Lobster Restaurant and First Watch Restaurant in addition to three vacant pads. The U-like Buffet was not included.

The plan is to now bring the popular Roadhouse Cinemas to the back pad, Grimm told us. Roadhouse Cinemas has locations at Crossroads Festivals Shopping Center at Grant Road and Swan in Tucson, and two others in Scottsdale and Colorodao Springs.

Open 365 days a year, RoadHouse Cinemas offers an inviting movie and dining experience, with an extraordinary restaurant menu created by an award-winning chef and restaurateur, an impressively creative full bar featuring high quality wines and craft beers, and overwhelmingly comfortable recliners, all to be enjoyed while experiencing state-of-the-art digital projection and 7.1 Dolby Digital Surround Sound!
 
Sundt Starts Work on Student Success District

Sundt Construction, Inc. (www.sundt.com) recently started construction on the University of Arizona Student Success District in Tucson.

“This project marks our 58th project on the University of Arizona campus,” said Dave Ollanik, Project Director for Sundt. “We look forward to again working with the University of Arizona on this project and helping to build a unique and groundbreaking resource for current and future students.”

The project will transform the Main Library, the Science-Engineering Library, and Bear Down Gym, while adding a new four-story student success building into an interconnected district, which will provide indoor and outdoor spaces. The new district will encourage students to move seamlessly between spaces that provide a full range of services and expertise, allowing them to reach their academic and career goals.

The project is being delivered via design-build delivery method with Sundt’s design partners of Miller Hull and Poster Frost Mirto. The multi-facility project is expected to be fully completed and open to students by 2021.

The Sundt opened its Tucson office in 1929. In the decades since, it has built notable UA landmarks including McKale Center, Centennial Hall and the Arizona Stadium skyboxes. Sundt most recently completed the remodel of Old Main on the campus. The award-winning project renovated the campus’s oldest building and completed the project in 2014. The company has three offices in Arizona, in Tucson, Tempe and Phoenix.

Sundt Construction, Inc. is one of the country’s largest and most respected general contractors. The 128-year-old firm specializes in building, transportation, industrial and concrete work and is owned entirely by its 2,000 employees. Sundt is distinguished by its diverse capabilities and experience, unique employee-ownership culture and depth of self-perform expertise in 13 major trades. Half of Sundt’s workforce is comprised of skilled craft professionals who, together with the company’s administrative employees, enable Sundt to fulfill its mission to be the most skilled builder in America. Sundt has 11 offices throughout Arizona, California, Texas and Utah and is currently ranked the country’s 65th largest construction company by ENR, the industry’s principal trade magazine.
 
Rio Nuevo will be discussing 75 E. Broadway, Wig-O-Rama, a new downtown employer, and possibly purchasing the Access Tucson building tomorrow. Really wish local media would attend and write on these.
 
Rio Nuevo will be discussing 75 E. Broadway, Wig-O-Rama, a new downtown employer, and possibly purchasing the Access Tucson building tomorrow. Really wish local media would attend and write on these.

Do they livestream Rio Nuevo Meetings? I don't expect it to be on Facebook or Twitter but would be interesting to watch or at least have it recorded to watch later.

I'll check Rio Nuevo's site but just curious about the livestream if anybody has any knowledge.
 
Rio Nuevo will be discussing 75 E. Broadway, Wig-O-Rama, a new downtown employer, and possibly purchasing the Access Tucson building tomorrow. Really wish local media would attend and write on these.

According to Channel 9:
  • The mystery employer was recruited by Sun Corridor. It's a national brand that would bring up to 350 people downtown
  • RN will chip in up $650,000 to guarantee parking
  • Dabdoub is planning on adding 3 floors of living space to the old Wig-o-rama building, with entertainment space on the ground floor
  • RN are working to obtain the Access Tucson building and are also working on design standards for Sunshine Mile
 

Unless they’re going to parcel out that 10,000 square foot ground floor retail space could this be the long-awaited downtown pharmacy, albeit slightly smaller? That’s a relatively big space and, if I recall correctly, Dabdoub and Schwabe were the ones that had CVS lined up for the other end of the block at the Chicago Music Store until CVS pulled out for reasons apparently unrelated to Tucson.
 
Unless they’re going to parcel out that 10,000 square foot ground floor retail space could this be the long-awaited downtown pharmacy, albeit slightly smaller? That’s a relatively big space and, if I recall correctly, Dabdoub and Schwabe were the ones that had CVS lined up for the other end of the block at the Chicago Music Store until CVS pulled out for reasons apparently unrelated to Tucson.

The spaces are broken up already by nature of the existing construction. Per Patricia Schwabe's comments at February's Rio Nuevo meeting, they're still working to lease to a local coffee shop, presumably for the corner space. Curious if there was any update on the leasing at this month's meeting.
 


Back
Top