The Gadsden Company continues development around Mercado San Agustin

Interview with Gadsden Company about future of west side development. Interesting part mentioning the high rises along the Santa Cruz.

"Thinking ambitiously, Weinstein said he hopes their plans for the district are completed in the next seven years. The company is working on adding three mid-rise residential buildings along the Santa Cruz River behind the Sentinel Plaza, along with retail and parking garage buildings and a grocery store with more residential units. The company will invest more than $100 million more with the future projects it’s working on."
I was reading this article a couple days ago. I'm assuming these mid-rise buildings are the Bautista, though I could be wrong. They also mentioned that the MSA Annex is not permanent and that they hope to have something more permanent there in the future - possibly another mercado.
 
Just as it seems the Hub 4 project includes some of the existing structure at Tyndall and Speedway, another developer (Capstone Collegiate Communities) is proposing a project at Euclid and Speedway that would cantilever over the three houses that front the south side of Speedway between Euclid and the alley.

http://tucson.siretechnologies.com/...7337545425545447/920951202212019095109853.pdf

I'm not 100% sure what the incentive of keeping these structures is.
 
Just as it seems the Hub 4 project includes some of the existing structure at Tyndall and Speedway, another developer (Capstone Collegiate Communities) is proposing a project at Euclid and Speedway that would cantilever over the three houses that front the south side of Speedway between Euclid and the alley.

http://tucson.siretechnologies.com/...7337545425545447/920951202212019095109853.pdf

I'm not 100% sure what the incentive of keeping these structures is.

can you rehost it? that's a 404 now
 
can you rehost it? that's a 404 now

Not sure how to rehost the PDF, but here's a screenshot from it showing the proposed massing.

HQg1egZ.jpg
 
Looks like Rio Nuevo will be discussing potential incentives for a new employer downtown in their executive session on Tuesday. Pretty sure, if they're getting involved, it could mean something significant.
 
Here's an article about the aforementioned Hub IV

Hub IV Mixed-Use Proposed for Tucson Main Gate District

The City of Tucson’s Main Gate Overlay District Review Committee heard a proposal from Core Campus at their February 6 meeting, for the development of a new mixed-use student housing complex planned for the SWC of Speedway Boulevard and Park Avenue.

The project, called Hub IV at Park & Speedway, will be located on six parcels at 902, 910, 914 and 916 E Speedway Boulevard and will stretch from Park Avenue to Tyndall. The property is currently separated by an alley and is expected to be consolidated into either two parcels or one depending on whether the alley is incorporated.

The property is zoned C-1 within the Main Gate District and is “currently developed with various commercial uses,” according to the owner’s preapplication submittal.

Hub IV at Park & Speedway will be a six-story, mixed-use development consisting of 115-135 “town home style” dwelling units with room for up to 499 beds, and approximately 9.5KSF of retail on the ground floor.

Features include below-grade and ground level parking composed of about 90 spaces, as well as an upper mezzanine level consisting of a pool and rooftop terrace will be available.

According to the submittal, the design is consistent with the requirements of the Main Gate District Overlay and “serves to transition the heights and densities of the nearby, taller student housing complexes,” by using a variety of materials and colors that complement the adjacent buildings.

The building’s location helps mitigate noise by strategically being placed near large University buildings and parking garages that act as buffers.

The streetscape will, “enhance the Tyndall pedestrian corridor with ‘town home style units fronting on Tyndall Avenue,” according to the submittal. “The project will also incorporate a ‘feature landscape/hardscape/monument’ element at Park & Speedway, which will accentuate and possibly identify the Main Gate District.”

Core has experience developing in the Main Gate District with their fourth project, The Collective, currently under construction.

In an email to BEX on February 19, Core Spaces Principal & Chief Development Officer, Eric Grimm noted that Hub IV is currently in the entitlements stage, and that construction is estimated to start in the Fall of 2019 for a 2021 delivery.

A general contractor has not yet been selected.
 
Quick updates:

-A crane was being erected at La Placita yesterday. Based on the progress I saw over a few hours, it should probably be done today.

-Project signage is up at 75 E Broadway.
 
Crane at Flin Apartments Construction Site
D8S35b.jpg


Rendezvous Urban Flats construction
Avcn9H.jpg


75 E Broadway Cultural Mitigation work
syPULE.jpg
 