Tucson Development Thread


Win ! Yes, this and the 20+ building downtown will really change the skyline quite a bit! Things are happening Tucson

Glad to see this development approved! It will be interesting to see how much our skyline will change in the next 3-7 years. Can't wait to see some updated renderings in the near future.
 
Sure seems like arson no? For a fire of that magnitude to occur at this stage in construction seems odd.

A timber structure all framed out but still bare will burn intensely. Like arranging your kindling with enough room for air to get between the sticks.

This video of a timber apartment block still under construction in Gilbert two years ago was a five alarm fire, made national news.
https://www.nbcnews.com/video/massive-fire-burns-at-construction-site-672522819622
 
^ No fire suppression either.

These things are huge hazards when they're under construction and between construction accidents and arson burn all the time. The insurance premiums are big and contribute to the high construction costs and rents.
 
Fire

Great point on the fire suppression. I thought of that as well. My bad as to the intensity as I didn't realize it was framed out to the extent it was. They were much further along than I thought. Really a shame.
 
Chuck Josephson: Neighborhoods should not be geographical

Thus do neighborhoods, often just a few activists, assume a controlling role in city leadership.

....

The widening of Broadway was attacked by some neighborhood activists who, using their own view of what the cityscape should be and disregarding the experts who look at the entire city’s needs, forced changes to protect a single building, one whose architecture is nice but unremarkable. They won.

....

Yet, because of the power of neighborhoods, neither city fathers or even property owners dare fight the voices of a few powerful neighborhood leaders.....

Neighborhood political activists (NIMBY...I mean YIMBY :haha:), your influence is waning in Tucson.
 
The Downtown Tucson Development Summer Update report is out:

Downtown Tucson Development Update Summer 2018

Couple interesting things:

  1. There is no mention of the Norville/Arena Site project
  2. The Rendezvous Urban Flats now have an unknown start date
  3. The Ronstadt project is still awaiting FTA approval

What does it take to get things moving on that TCC Arena site?
 
The Downtown Tucson Development Summer Update report is out:

Downtown Tucson Development Update Summer 2018

Couple interesting things:

  1. There is no mention of the Norville/Arena Site project
  2. The Rendezvous Urban Flats now have an unknown start date
  3. The Ronstadt project is still awaiting FTA approval

What does it take to get things moving on that TCC Arena site?
A new developer lol. He doesn't have the resources to handle a large scale, $100+ million project.
 
Saw some crane components being delivered to The Mark this morning. Not sure if they were being parked there temporarily for use at another project, which I've seen before there, but hoping it's a replacement for the destroyed crane.
 
In addition to the new Southwest flight to San Jose and the additional flight to Vegas, it looks like SWA are adding a weekly flight on Sundays to Dallas Love Field.

According to the Dallas Morning News:

The expanded schedule will bring nonstop flights to seven new cities beginning Jan. 7, 2019. That includes new markets like Louisville and Tucson, plus a return of daily nonstop service to several cities, including Minneapolis; Milwaukee; Fort Myers, Fla.; Jacksonville, Fla.; and Charleston, S.C.
 
According to TIBO, at their last meeting Rio Nuevo approved the leases for 75 E Broadway, where RN will lease the land from Pima County and sublease it to the developer, JE Dunn. They are expecting to start construction late this year.

75-e-broadway25.jpg

Image: CBRE
 
Nice, this will be good for downtown Tuscon. Pretty soon we are going to have 3 cities in Arizona that are simultaneously constructing high rises. Tempe, Tuscon and Phoenix.
 
According to TIBO, at their last meeting Rio Nuevo approved the leases for 75 E Broadway, where RN will lease the land from Pima County and sublease it to the developer, JE Dunn. They are expecting to start construction late this year.

If I am not mistaken, JE Dunn still needs to finish their financial analysis which I believe is supposed to wrap up by the end of this month. The building's final sqft, height and amenities will be proposed at that time. I am hoping they see enough demand to hit the 20 stories proposed.
 
So what are the chances this tower is actually going to get built? Better than average now? This is pretty huge for Tucson if it happens and it's anywhere close to that size...very cool...been waiting a long time for a new tall in Ol' Pubelo...
 


Back
Top