Not a great rendering, but one exists nonetheless for the new parking garage.
![]()
![]()
Proposed 900-bed student housing & retail building at Park & Broadway. Keeping façade of old Green Dolphin, a 1929 Joesler. Retail along Park and at 10th St corner, townhomes along 10th St. 10 floors on Broadway, 5 floors on Park, 10th St, & Tyndall
http://www.rinconheights.org/the-mark-development-park--broadway.html
![]()
Proposed 900-bed student housing & retail building at Park & Broadway. Keeping façade of old Green Dolphin, a 1929 Joesler. Retail along Park and at 10th St corner, townhomes along 10th St. 10 floors on Broadway, 5 floors on Park, 10th St, & Tyndall
http://www.rinconheights.org/the-mark-development-park--broadway.html
Looks like the Proper location has a liquor license notice up in the window. Any idea what is going in there?
Can't really say a lot, but it's gonna be a bar rather than a restaurant. It isn't expected to utilize the full space.
Walked by TEP Headquarters yesterday, and they are indeed building out the first floor, which has been vacant since the building was completed. Sign in window says "Mian - open in February"
Found this one the Armory Park website. The downtown clifton was written up in the New York Times. A little preliminary, but great use of a vacant lot close to downtown.
The owner of the Downtown Clifton Hotel, Moniqua Lane (an AP resident), informed our group of changes coming to this neighborhood boutique hotel. Coming soon on the lot just south of the current small hotel will be an addition bringing it up to 30 rooms. A small bar will serve hotel guests and neighbors as well as a small food counter (think Mercado at Menlo Park) and a swimming pool. Some concern was expressed about vehicle access to Russell Avenue and possible resulting disturbance to nearby neighbors. The project is early in the permitting process so there will be further opportunities for people to express their concerns and for the developers to address them. Soon, I will do an article about the hotel and its owner. Both are assets to our community.
According to local tv news last night, that there are plans to expand our street car and it will be funded by the business community instead of tax payers.
Don't have time to find a link of it. It's from one of our major local tv news.
Btw from several posts ago, IKEA in Tucson? Why not! Why wait? Tucson is growing anyways.
If it again costs $50 million per mile I don't see anyone let alone private biz paying for it. If it is extended where is the park and ride going to be? Lets be honest, you drive, park, and then take the street car.
Now that the maintenance infrastructure is in place, the team, the payment system, etc - the cost will be significantly lower for expansion. I have heard that the estimate is $15 million a mile. That includes the track, additional cars, staff, stops, etc.
There are no plans for expansion at this time, only thoughts on how to incorporate more of the city into the line. East on Broadway, North on Campbell and South on Kino (possibly to the airport) make the most sense. What was mentioned at the panel was that we can’t expect another $200 million in public funding to be available for these expansions, we need to find other revenue sources. If we run the line down Broadway, can we get businesses to partner on the cost? If we run it to the airport, can TIA help with the cost, etc. There are no set plans, just opportunities that need more exploration.