farmerk
New member
I'm gonna comment on a few of your posts here Farmerk:
1) I hope they don't use eminent domain to get land for Grand Canyon University. First off, it's for a private university, not a public one so I don't know if that would be a conflict. Second, I'm not a fan of eminent domain. I think it's unfair, not very moral and easily abused. I know the 5th Amendment allows it, but I also think it can conflict with the 4th Amendment.
2) I agree with you, that I don't see Tucson ever building any freeways. Unfortunately, for the area already built that prospect has already passed, I think. I could maybe see them being proactive and building something in the southern part of the metro area, maybe connecting I-10 & I-19 in the future (that's going to be where a lot of the future growth, for the city and the metro, will be). There is talk of building another interstate from Tucson to the west-valley area of the Phoenix metro (maybe part of a future I-11 to Vegas) that would possibly stretch to I-19 and then over to I-10 east of Sahuarita and Green Valley (out towards Vail). I do disagree with you when you say that Broadway might not be widened to 6 lanes. Just because Steve K doesn't want it, too bad. The area needs it (that is a bottleneck) and it's part of the voter-approved RTA. To not build it they would have to hold another election to approve it not being built, if I'm not mistaken.
3) I filled out a submission to the ADOT rail study (and I believe I put a link on here and urged others to do the same). I told them I loved the idea of rail to Phoenix, just not the rail they are proposing. I want high-speed rail (HSR) between the 2 metro areas. If I'm not mistaken most of their routes were on rail lines already built, which is going to slow down freight (and Union Pacific has already said they plan on increasing the number of freight trains through the area) and the passenger trains. If they do this, and I hope they do, they need dedicated HSR on dedicated HSR lines.
4) While the thought of a 5 & 1/2 hour commute to Phoenix scares me, I don't know that I believe this will happen, even if we have a 10 lane interstate (and we know that probably won't happen, we still have 2 lanes for long stretches and it's taking forever to widen other stretches to 3 lanes) between Tucson and Phoenix in 2050. I think a lot of that data for population projections came before the economy crashed when they thought Pinal might become the next Riverside/San Bernardino, California (Inland Empire - IE). The growth that was starting all but stopped. Home prices crashed and there are all but no jobs in that area. Gas is rising and it's expensive to drive to Phoenix and/or Tucson to go to work. I think we will see the Sun Corridor Megalopolis some day, but I don't know that Pinal will be as built us as some thought anytime soon. Check out America2050.org for some good info on the Sun Corridor (and all the other megalopolis' around the country). Another good website to check out is transportpolitic.com. There used to be another good site, the Infrastructuralist, but it shut down a year or so ago.
Thanks for those links. Anything could happen with regards to using eminent domain but you're right, I don't see using eminent domain for GCU. I don't even know why I added those words...excitement probably? I'm with you with using a real HSR between Tucson-Phx with new tracks ...and Phx-LA-LV . It's a straight shot so it will be fast.
As for Steve K. , I think he just has the biggest mouth at city hall. Yes, the Broadway stretch is needed to avoid using downtown as an I-10 ramp...used downtown links instead. I don't know what needs to get this Broadway rd widened officially, city council vote? If that's the case, it will pass.