Tucson Development Thread


I believe that Obama helped support an act that partly funded the streetcar.
Very true. I wasn't thinking about that. I voted for Obama, but I don't see the federal government ensuring any more growth for downtown. They did though, as you point out, help set the table for the current (and hopefully future) growth, not just downtown but also in other parts of the central city (such as by the U of A). I thought you were going the other way with your comment - I thought you might be saying that since Mitt lost the economy was going to tank again (or not recover as fast) and the lending my freeze up again. My bad, misinterpreted your comment. Cheers.:)
 
Awesome and informative thread. Thanks to whoever started it! We have been working on launching our project in downtown: The Outlet- Cafe and Innovation Centre. We got some press this past few weeks but here is our crowd-funding page is anyone is interested in more information.

http://propelarizona.com/projects/the-outlet-cafe-and-innovation-centre1/323

Very excited for Tucson and all the new development!

I hope the best for your business here. It seems like a cool place.
 
County considers $197M bond package for economic development

By Patrick McNamara

On the heels of one election, the Pima County Board of Supervisors on Tuesday (Nov. 13) will discuss an economic development proposal requiring voter approval of nearly $200 million in bonds.

Among the recommendations of the Pima County Economic Development Plan 2012-2014 are $37 million in spending to expand and improve tourism venues, $30 million toward noise abatement around Davis-Monthan Air Force Base and Tucson International Airport, $30 million to support economic development efforts in smaller municipalities and $10 million to improve infrastructure and access to the University of Arizona Science and Technology Park. ...

By far, the largest portion of the proposed $197 million bond package would be spent on roadway construction and improvement projects. County Administrator Chuck Huckelberry suggests spending as much as $90 million to fund construction of an Aerospace Parkway south of Tucson International Airport that would stretch from Nogales Highway east to Interstate 10 at Rita Road. The plan also would extend Alvernon Way south to connect to with the new parkway.

The proposed parkway would realign Hughes Access Road south of the airport and Raytheon Missile Systems’ main plant. The road would connect with Old Vail Connection Road, which would also require widening and other improvements. …

In the planning for a potential 2,800-acre aerospace and defense business park near Raytheon’s plant, the county proposal identifies potential uses for many of the properties around the airport. Preliminary drawings are posing safety concerns by the airport authority over plans to add taxiway development lots underneath the landing and take-off zones to the southeast of the airport’s main runways.

Under the bond program, Huckelberry proposes a $4 million contribution to the Arizona-Sonora Desert Museum to help create a new exhibit.

Another $4 million is recommended for the Pima Air and Space Museum to create a Cold War display.

The plan asks for an investment of $10 million toward a visitor center at Tumamoc Hill. Under the proposal, the the Children’s Museum Tucson would receive $6 million to build a new facility. The Tucson Museum of Art would receive $5 million to renovate the north wing of the Old Pima County Courthouse building. The project would create a Western art exhibit.

The plan also calls for the county to invest in improvements to its technology infrastructure to help accelerate and streamline building permitting and approvals.
 
County considers $197M bond package for economic development

By Patrick McNamara

On the heels of one election, the Pima County Board of Supervisors on Tuesday (Nov. 13) will discuss an economic development proposal requiring voter approval of nearly $200 million in bonds.

Among the recommendations of the Pima County Economic Development Plan 2012-2014 are $37 million in spending to expand and improve tourism venues, $30 million toward noise abatement around Davis-Monthan Air Force Base and Tucson International Airport, $30 million to support economic development efforts in smaller municipalities and $10 million to improve infrastructure and access to the University of Arizona Science and Technology Park. ...

By far, the largest portion of the proposed $197 million bond package would be spent on roadway construction and improvement projects. County Administrator Chuck Huckelberry suggests spending as much as $90 million to fund construction of an Aerospace Parkway south of Tucson International Airport that would stretch from Nogales Highway east to Interstate 10 at Rita Road. The plan also would extend Alvernon Way south to connect to with the new parkway.

The proposed parkway would realign Hughes Access Road south of the airport and Raytheon Missile Systems’ main plant. The road would connect with Old Vail Connection Road, which would also require widening and other improvements. …

In the planning for a potential 2,800-acre aerospace and defense business park near Raytheon’s plant, the county proposal identifies potential uses for many of the properties around the airport. Preliminary drawings are posing safety concerns by the airport authority over plans to add taxiway development lots underneath the landing and take-off zones to the southeast of the airport’s main runways.

Under the bond program, Huckelberry proposes a $4 million contribution to the Arizona-Sonora Desert Museum to help create a new exhibit.

Another $4 million is recommended for the Pima Air and Space Museum to create a Cold War display.

The plan asks for an investment of $10 million toward a visitor center at Tumamoc Hill. Under the proposal, the the Children’s Museum Tucson would receive $6 million to build a new facility. The Tucson Museum of Art would receive $5 million to renovate the north wing of the Old Pima County Courthouse building. The project would create a Western art exhibit.

The plan also calls for the county to invest in improvements to its technology infrastructure to help accelerate and streamline building permitting and approvals.

That's a good use for that land. I could never imagine sticking houses down there
 
That's a good use for that land. I could never imagine sticking houses down there
Oh yeah. It's way too close to the airport for houses. Some of the article I didn't put in the text I included here (it can obviously be accessed with the link provided) said that TIA is planning on building a new runway in the future (so they aren't keen on getting rid of this land) and they worry about businesses right under the landing and take-off areas so close to the airport. But, I agree, it's an interesting idea and a good use for the land. I also like idea of doing some work on cultural institutions such as the Children's Museum and Sonoran Desert Museum. The southeast is the future growth corridor of Tucson. There's plenty of open space down there that is within the city limits. I'm totally for density and infill in the current city, but for those who want houses this isn't going to really work. The SE portion is where these people will eventually migrate too and build, so I also like the idea of starting the building of infrastructure for this area - by extending Alvernon to the south and by building an Aerospace Parkway from Nogales Hwy. to the Rita Ranch/I-10 area.
 
Last edited:
Multi-purpose project breaks new ground

Inside Tucson Business
By Roger Yohem
Posted on October 26, 2012

For three years, Art Wadlund and Rob Caylor toyed with the idea of developing a vacant parking lot downtown at 1 E. Broadway. What type of project would be a good fit? Financially, would it pencil out? Would city officials support it?

“There were times we were ready to abandon this. It was taking too much time and cash,” said Wadlund. “But we made it, downtown is going to get a project unlike any done before.”

Wadlund, Caylor and several government officials celebrated their persistence Oct. 19 during groundbreaking ceremonies that also “broke new ground” for private-public collaboration. Under a new tax incentive program, their six-story, mixed-use building will feature ground-floor retail, commercial offices, 24 apartments and underground parking.

Caylor, owner of Caylor Construction, and Wadlund, a founder of Hendricks & Partners commercial real estate, also own the adjacent Chase Bank property at 2 E. Congress St. Caylor’s company plans to complete the $16 million project behind that building by late 2013.

“This will be a gateway project for downtown and the modern street car,” said Caylor. “We’re creating value out of a vacant lot at Broadway and Stone, the corner of zero and zero.”

The city’s Sun Link modern streetcar project was a major factor in the developers’ decision to move ahead. Their site is right on the streetcar route. On top of that, Pima Association of Governments and its Regional Transportation Authority, which is coordinating most of the funding for the streetcar, has signed on as tenants and will occupy all the office space.

“This is a milestone for the city, the first project in our new development incentive program,” said Tucson Mayor Jonathan Rothschild to about 75 attendees at the groundbreaking.

Known as GPLET (Government Property Lease Excise Tax), the city incentive is a tool to spark private investment along designated gateways. Projects must benefit taxpayers more than developers and have economic benefits verified by an independent third party. Basically, the city takes ownership of a project when finished and leases it back to the developers. For up to eight years, the owners are exempt from property taxes while they grow the new venture.

“That incentive to invest downtown was huge for us,” said Wadlund.

http://www.insidetucsonbusiness.com...2-1ee6-11e2-9399-001a4bcf887a.html?mode=story
 
Quick Updates.

aLoft University

img1533rs.jpg


Level

img1534zk.jpg


img1535tg.jpg
 
The RTA's proposed widening of Broadway threatens numerous modernist-style buildings built in Tucson's post-WWII era, now considered endangered historical structures:


2343EBroadway-Tucson.jpg

More than 120 structures along the stretch of Broadway between Campbell Avenue and
Country Club Road have distinctive architecture, according to the Arizona Preservation
Foundation. The above building at 2343 E. Broadway currently houses law offices.
(photo: courtesy of Jude Ignacio and Gerardine Vargas)


Stretch of Broadway joins list of AZ endangered-history spots
by Carli Brosseau
Arizona Daily Star
November 12, 2012

Broadway's "Sunshine Corridor" is among the newest additions to the Arizona Preservation Foundation's list of the state's most endangered historical places. The stretch between Campbell Avenue and Country Club Road includes more than 120 historical properties, most built in the modernist style during Tucson's post-World War II boom, said Demion Clinco, president of the Tucson Historic Preservation Foundation. The area was developed largely by Jewish developers and architects to serve the neighborhoods surrounding Temple Emanu-El, near the corner of Country Club Road and Broadway, he said.

As Clinco sees it, those buildings are largely intact for the same reason they're threatened, and that presents something of an opportunity. "There's been a lack of investment because of a planned roadway expansion," he said. "I think (the area's inclusion in the list) is really a statement that this is significant statewide. It's not just a local issue." He hopes the spotlight on the area - which coincides with this weekend's Tucson Modernism Week, a three-day celebration that the Tucson Historic Preservation Foundation organized - will bring attention and investment to save the historical buildings. Saturday's events included a workshop for owners of modernist buildings on strategies for preserving the buildings and highlighting their modernist features. Clinco is hopeful for the area, given the increasing numbers of inquiries from property owners looking to capitalize on their building's history.

Another reason is the debate over what the widening of Broadway, initially approved by the City Council in 1987, should look like. Councilman Steve Kozachik has led the charge for a reassessment of whether the widening is necessary given today's traffic volumes and for a conversation about how to approach changes approved in the 2006 Regional Transportation Authority bond election. Under that plan, the roadway from Euclid Avenue to Country Club was to expand to six travel lanes, two dedicated bus lanes, a bike lane in each direction, a raised and landscaped median, sidewalks and streetlighting. Also included was an alignment that stretched 150 feet to the north side of the road, said Jennifer Toothaker Burdick, project manager for the the city's Transportation Department. Although the alignment will be discussed in the recently launched two-year planning and design phase, the council's 1987 vote will likely mean that properties affected by the widening will be on the north side of the street, she said. It probably will be 2015 before the city finalizes the properties on its acquisition list, she said. Construction on the $71 million project is slated for 2016.

Other Southern Arizona properties included on the Arizona Preservation Foundation's expanded centennial year list of endangered properties are the Marist College building in downtown Tucson, Empire-Cienega Ranch, the Courthouse Plaza Miners' Monument in Bisbee, Camp Naco in Huachuca City and the Mountain View Black Officers Club in Sierra Vista. Several Pinal County sites are included, as is the whole Arizona state parks system, highlighted for its dramatic budget cuts and park closures. Because of renewed investment, the Desert Laboratory at Tumamoc Hill was taken off the list since it last was published.


What's on the list of threatened places:

Adamsville Ruins, Coolidge

Arizona State Parks

Basque Pelota Ball Court, Flagstaff

Broadway Boulevard, Tucson

Buckhorn Baths, Mesa

Camp Naco, Huachuca City

Courthouse Plaza Miners' Monument, Bisbee

David and Gladys Wright House, Phoenix

Empire-Cienega Ranch

First Baptist Church, Phoenix

Fisher Memorial Home, Casa Grande

Geronimo Station, Geronimo

Glendale Tract Community Center, Glendale

Gonzales Martinez House, Tempe

J.N. Denier Tenement House, Florence

Maple Ash Neighborhood, Tempe

Marist College, Tucson

Meehan/Gaar House, Casa Grande

Mesa Citrus Growers Association Building, Mesa

Mountain View Black Officers Club, Sierra Vista

Peter T. Robertson Residence, Yuma

Sage Memorial Hospital School of Nursing, Ganado

San Ysidro Ranch Ruins, Yuma

Sun Mercantile Building, Phoenix

White Gates House, Phoenix


Source: Arizona Preservation Foundation
 
Last edited:
JCC-11-10-12-1.jpg

Joint Courts Complex construction - Nov. 10
(photo: tucsonwebcam.com)


Pima County Board of Supervisors votes to continue construction of courts complex without City of Tucson participation
www.tucsoncitizen.com
November 13, 2012

The Pima County Board of Supervisors voted Tuesday to move forward with the construction of the Joint Justice/Municipal Courts Complex near Stone and Toole avenues without the City of Tucson’s participation. The Tucson mayor and City Council agreed in October that the city could not afford to pay its share of the construction costs that exceeded the $76 million in 2004 bonds originally allocated to the project. The discovery of military and civilian cemeteries from the late 1800s on the site of the complex, the excavation of nearly 1,400 remains and consequential repatriations and reburials added nearly $17 million to the cost of the project.

The mayor and council voted to either move the city’s court operations, now housed in a former parking garage on Alameda Street east of Stone Avenue, to the complex without paying the city’s share of the excess construction costs or keep its court operations in the Alameda Street building. Pima County Administrator Chuck Huckelberry told the Board of Supervisors that the city’s share of the excess costs, based on its anticipated occupancy of 54 percent of the complex, would be about $20 million. The continuing decline in the property tax base would prevent the County from subsidizing the city’s court operations by paying the city’s share of the costs, Huckelberry said.

Huckelberry recommended and the Board approved continuing the construction of the complex without the city’s participation and occupancy. The portions of the complex that would have been occupied by the city will not be completed. The County will explore options to fill the space with legal or court-related functions and tenants who would pay their share of the costs.
 
JCC-11-10-12-1.jpg

Joint Courts Complex construction - Nov. 10
(photo: tucsonwebcam.com)


Pima County Board of Supervisors votes to continue construction of courts complex without City of Tucson participation
www.tucsoncitizen.com
November 13, 2012

The Pima County Board of Supervisors voted Tuesday to move forward with the construction of the Joint Justice/Municipal Courts Complex near Stone and Toole avenues without the City of Tucson’s participation. The Tucson mayor and City Council agreed in October that the city could not afford to pay its share of the construction costs that exceeded the $76 million in 2004 bonds originally allocated to the project. The discovery of military and civilian cemeteries from the late 1800s on the site of the complex, the excavation of nearly 1,400 remains and consequential repatriations and reburials added nearly $17 million to the cost of the project.

The mayor and council voted to either move the city’s court operations, now housed in a former parking garage on Alameda Street east of Stone Avenue, to the complex without paying the city’s share of the excess construction costs or keep its court operations in the Alameda Street building. Pima County Administrator Chuck Huckelberry told the Board of Supervisors that the city’s share of the excess costs, based on its anticipated occupancy of 54 percent of the complex, would be about $20 million. The continuing decline in the property tax base would prevent the County from subsidizing the city’s court operations by paying the city’s share of the costs, Huckelberry said.

Huckelberry recommended and the Board approved continuing the construction of the complex without the city’s participation and occupancy. The portions of the complex that would have been occupied by the city will not be completed. The County will explore options to fill the space with legal or court-related functions and tenants who would pay their share of the costs.

Since you can't just leave holes in a building, I'm assuming this means there will be areas of the building that aren't finished internally. That sounds fine to me. Even if the county can't fill the space immediately, it's a guarantee that, over time, they'll grow into it.
 
Since you can't just leave holes in a building, I'm assuming this means there will be areas of the building that aren't finished internally. That sounds fine to me. Even if the county can't fill the space immediately, it's a guarantee that, over time, they'll grow into it.
I thought all they were doing was building the shell right now anyway since construction is cheep right now, and they were going to build out the interior later when they had the money?
 
I thought all they were doing was building the shell right now anyway since construction is cheep right now, and they were going to build out the interior later when they had the money?

Yeah. My reading, though, is that, when the time comes to complete the interior, some parts won't be completed until the county needs to expand or private interests lease them.
 
Romney lost and his supporters are acting like spoiled B******

I knew people would be mad that Romney lost but succeeding because you're afraid that Obama is going to continue to help rebuild the economies city by city , Tucson and Detroit to name a few. That is one of the many things that people at ASU have been shouting at people with Obama stickers on their cars, like my 2013 American Malibu Eco I bought at local Oreilly Chevrolet.
Note that in the article "Liberal Austin" has agreed to leave the state of Texas if Texas succeeds. I feel your pain Austin, I'm from Tucson.

http://news.yahoo.com/blogs/lookout/secession-petitions-now-filed-50-states-183500440.html




Main Article
http://news.yahoo.com/blogs/lookout/secession-petitions-now-filed-50-states-183500440.html

I know that this is not very related to Tucson Development but I felt like it needed to be posted.
 
I knew people would be mad that Romney lost but succeeding because you're afraid that Obama is going to continue to help rebuild the economies city by city , Tucson and Detroit to name a few. That is one of the many things that people at ASU have been shouting at people with Obama stickers on their cars, like my 2013 American Malibu Eco I bought at local Oreilly Chevrolet.
Note that in the article "Liberal Austin" has agreed to leave the state of Texas if Texas succeeds. I feel your pain Austin, I'm from Tucson.

http://news.yahoo.com/blogs/lookout/secession-petitions-now-filed-50-states-183500440.html




Main Article
http://news.yahoo.com/blogs/lookout/secession-petitions-now-filed-50-states-183500440.html

I know that this is not very related to Tucson Development but I felt like it needed to be posted.

First, it's seceding, not succeeding.

Second, just like you said, this is not the place for politics:

I know that this is not very related to Tucson Development
 
A unique feature of the new Luis G. Gutierrez Bridge over the Santa Cruz River required a collaboration between engineer, architect and artist to project specific solar images onto the bridge's sidewalk on twelve days of the year, commemorating important events of Tucson's past:


DavidDoblerofStructuralGrace.jpg
GutierrezBridge.jpg

The bridge’s architect - David Dobler of Structural Grace
(photos: David Olsen)


Solar Art
by Teya Vitu
http://www.zocalomagazine.com/solar-art/
November 12, 2012

On February 19 at 8:45 a.m., a propeller blade will project onto the image of a 1910s airplane embossed into the sidewalk of the Luis G. Gutierrez Bridge, newly opened to pedestrians and bicyclist. No other time or day during the year will the propeller align with the plane. It’s a magical moment, one that the bridge’s designers purposely fashioned to make the new bridge for the Cushing Street extension to the West Side an actual destination. Such was the case at 8:45 a.m. on Oct. 14, when people gathered around a sandblasted sidewalk image of the Tucson Pressed Brick Co. as the solar projection of the TPCO brick stamp inched onto the sidewalk image. “I was out there and there were people watching for it to happen,” said Claudia Perchinelli, a bridge engineer and owner of Structural Grace, the local bridge engineering firm that designed the bridge. “It was very exciting. They all had their cameras and they were waiting.”

That’s exactly what the bridge’s architect, David Dobler of Structural Grace, wanted to achieve with the 12 solar icons laser-cut into the shade canopies above the sidewalks. Each sidewalk image and accompanying text depicts a specific moment or event that defines Tucson. “I wanted to create something in my mind to get people here for other reasons than just cross the river. I wanted to create a destination,” Dobler said. How hard is it to have the sun project an image on a precise spot at a precise time on a specific date? We always know where the sun will be. Sundials easily tell the right time. But Dobler had to wrestle with many more variables to make sure the 12 images were embossed into the exact locations on the sidewalk. The bridge follows a rounded camber across the Santa Cruz. Plus it’s rounded side-side, too. In addition, the canopy with the image to be project is curved. All this needed to be incorporated into the 3D modeling. The light poles that carry the canopies had to be exactly vertical and the crossbars with the canopies at a precise height. Even the sidewalk benches needed adjustments. The image and text for Juan Bautista de Anza wrap around one bench.

On top of all that, the Luis G. Gutierrez Bridge has undergone considerable design changes since 2007. There was the name change from Cushing Street Bridge. The bridge was narrowed by about a dozen feet, and has gone from three spans to two spans. Most significantly, there was a major realignment to have the bridge cross the Santa Cruz River at an angle to preserve Pima County’s Theresa Lee Public Health Center. The bridge is aligned 22º39’50” askew in a southeast to northwest slant. Designers learned by chance that this alignment was only half a degree off from where the sun rises and sets on the winter and summer solstices, Dec. 21 and June 21. To the lay person, that’s a rising and setting sun right down the middle of the street.

That triggered the Indiana Jones in David Dobler’s psyche. Since “Raiders of the Lost Ark,” he’s been intrigued by the tomb scene, where Jones attaches a gem on a staff and the sun projects onto the secret spot. “I bought a statue of St. John the Baptist, stuck it on a staff, and on the summer solstice 2008, I held it up on the bank of the Santa Cruz River and checked the shadow,” Dobler recalled. Of course, the shadow fell exactly where Dobler expected. Dobler and Structural Grace’s computer aided design modeler Mike Lichtenstein created a 3D computer model with the bridge specifics and then ran it with specific dates and times to see if a projected image would project onto a sidewalk image at a precise time. Then Dobler built a real life model with the image of the Spanish flag projecting onto a rough presidio drawing and set it up in the Structural Grace parking lot on Aug. 8, 2008. “At the allotted time, which I think was high noon, the image didn’t align where we expected it to,” Dobler said. “We just sat there and waited. An hour later, it aligned perfectly.”

The Google shade and shadow program they used did not account for Arizona not recognizing Daylight Saving Time. Dobler and Lichtenstein took the results of this parking lot experiment to astronomer at UA: Science Flandrau to confirm their premise. They got a thumbs-up from the astronomers. Dobler and Lichtenstein then entered exact geometrics of all the bridge elements into the 3D modeling program to align canopy and sidewalk images. The image in the canopy would be in a fixed position, and Dobler had specific historic dates in mind for all 12 images. So the variables were moving the sidewalk image and finding an ideal time for the canopy image to project onto the sidewalk. “Mike and I sat down and did the modeling. You just literally plug in different times. We would then move the sidewalk image to align at a specific time.” It took one week at the end of 2009 to establish times and sidewalk placements. But they were not done. “As the bridge design changed, the alignments had to be adapted by shifting the images by the respective narrowing amount,” Dobler said. They had to go through the 3D modeling exercise two more times to establish the precise positions of the sidewalk images you see today.

Fast forward to August 2012. The bridge is essentially done – but there are square holes at the base of each canopy where the laser-cut images would go. Armed with a carpenter’s crayon, Dobler made precise measurements from the center lines of each light pole and from barrier separating the sidewalk from the roadway. Then he drew two squares, six inches apart, one for the sidewalk image, one for the text. “I crawled on the ground. It was hot. I was out here eight hours doing this,” Dobler said. “The most important chapter of the bridge’s story is the story of collaboration between engineer, architect and artist.”

Bridge artist Brenda Semanick heartily agrees. “Dave and I worked together on this for four years,” Semanick said. “It was a beautifully collaborative project.” For the solar art, Semanick designed the canopy panels that project onto the sidewalk images, which were drawn by her artist husband, David Johnson Vandenberg. Semanick also designed the laser-cut cottonwood leaves that give the canopy an artistic perforated look. The staircases down to the river are embedded with 200 shards of replica Hohokam pottery. Semanick based the designs on pottery excavated from the Santa Cruz River. She hand-painted each one. “I went there and worked with the guys who built the staircases and said ‘put one here, put one there.’ I even put a few in myself,” Semanick said. “It was summer. It was brutal work for those guys.” Semanick also added ducks, fish and bats to the center pier that holds up the bridge. She carved 20 bats out of clay and then made molds and cast each in concrete. The bats can be found high on the pier under the bridge. “ I went up there with the guys,” Semanick said. “I wanted each bat placed a certain way.


Calendar: Solar events for the Luis G. Gutierrez Bridge

February 19 at 8:45am: First Aircraft

February 21 at 8:45am: Rodeo Parade

March 15 at 9:30am: Father Eusebio Kino

March 20 at 8:30am: The Southern Pacific Railroad

April 10 at 9:30am: Mariachi

May 25 at 10:30am: Phoenix Mars Lander

June 1 at 12pm: The Historic Streetcar

June 24 at 10:30am: El Dia de San Juan

July 3 at 10:45am: The Monsoon

August 20 at 9:30am: The Presidio San Agustin de Tucson

October 14 at 8:45am: Tucson Pressed Brick Company

October 26 at 8:15am: Commander Juan Bautista de Anza Arrives
 
Last edited:
New firm to offer 100s of local jobs
PREFAB-BUILDING-PANEL MAKER TO LOCATE PLANT, HQ IN TUCSON

David Wichner Arizona Daily Star

Hundreds of new construction jobs are planned for Tucson, but they won't involve swinging a hammer.
A new company, Aris Integration LLC, plans to hire hundreds of people over the next five years for a manufacturing plant here that will make a new kind of modular, energy-efficient building panel.
The company, which will also plant its headquarters here, hasn't settled on a final site for its operation, but it expects to employ about 250 people in the near term and more than 600 in five years.
Aris, which already is developing a plant in Connecticut, plans to complete its Tucson plant site and start production by the fall of 2013.
The company picked the Tucson area after a whirlwind, four-month courtship by Tucson Regional Opportunities Inc., the Arizona Commerce Authority, Pima County and local business leaders.
"That is light speed to get something like this done," Duane Armijo, CEO and founder of Aris, said Wednesday as he announced the company's decision at TREO's downtown office.
Armijo said the company - which also looked at Albuquerque, Las Vegas and El Paso - picked Tucson because of its pool of skilled construction workers, coordinated public-private support and the area's focus on sustainable technologies.
"This company fits us very, very well," said TREO President and CEO Joe Snell. "Tucson has put a lot of effort into becoming a leader in sustainability."
Sandra Watson, CEO of the Arizona Commerce Authority, said Aris will boost a statewide manufacturing sector that employs more than 150,000 people and netted nearly $15 billion in exports in 2011.
"This project will have an incredible return on investment for years to come in jobs, wages and investment," Watson said.
Aris' prefabricated building panel system combines light-gauge steel framing with ultralightweight polystyrene foam insulation and vapor with other sustainable materials and energy-efficient design.
The panels, which can be used for a variety of residential and commercial building applications, can be quickly assembled on job sites through a system of interlocking parts, clips and bolts.
The mass-produced yet customizable product promises to be more cost-effective and far more energy-efficient than traditional on-site construction, Armijo said.
Armijo, a 25-year construction industry veteran, closed his Scottsdale contracting firm, Chaparral Construction, in 2007 in anticipation of the housing bust.
He "vertically integrated" his company, adding stucco, drywall and paint services to his framing and trim business to offer homebuilders streamlined, lower-cost services.
A conversation with an official of the U.S. Green Building Council later convinced Armijo that a new, integrated building system was needed.
Prefab building panels are nothing new, Armijo said, noting that pre-insulated panel technology is commonplace in Europe.
United Kingdom-based Fusion Building Systems, which will partner with Aris on its Tucson operation, has supplied prefab panels to more than 5,000 projects, Armijo said.
"Even though this is new technology to us, this is not new technology," he said.
Armijo said Aris' integrated design and assembly-line production method will help push panelized systems into the mainstream of the U.S. construction industry even as the housing industry recovers.
On the commercial side, demand for nonresidential prefab building systems in the U.S. is expected to rise 7.8 percent annually through 2015, according to the Freedonia Group, a Cleveland-based market research firm.
In all, Aris plans to open six regional manufacturing plants across the U.S. by 2017. Besides the plant under development in North Haven, Conn., and the planned Tucson operation, Aris plans a third plant in Austin, Texas, in the near future.
Those are ambitious plans for a "pre-revenue" company Armijo says has been in the research and development phase for four years.
Aris Integration is a successor to Armijo's original building-panel venture, Scottsdale-based Diverse Services Group, which Armijo says has sold three building jobs using the panel system.
The company also has the support of German-based chemicals giant BASF, which supplies a premium, graphite-enhanced expandable polystyrene product known as Neopor.
Armijo, who owns Aris with five partners, says he isn't getting any upfront government cash to come to Tucson but will apply for various incentive programs.
According to the Commerce Authority, Aris will be applying for state tax credits and state job-training grants. Those programs require require meeting specific criteria, such as threshold wage levels, and are performance-based.
Armijo, a military veteran, said the company also is committed to hiring as many vets as possible.
Sharon Bronson, vice chair of the Pima County Board of Supervisors, said that the county's new veterans job center is ready to help.
Pima County Administrator Chuck Huckelberry said Aris will especially benefit from any job-training assistance.
"In that type of manufacturing operation, that job training is very, very important," Huckelberry said.
Meanwhile, the search goes on for Aris' new home.
Armijo said Aris needs a facility of about 300,000 square feet, with high ceilings and office space, adding that the company has been looking at sites near Tucson International Airport, among others.
Building its own plant, which is still an option, would cost upwards of $30 million, Armijo said.
 
This makes it a little clearer on how the city being left out effects the court complex.

County could sell downtown building

Darren DaRonco Arizona Daily Star

Some prime downtown real estate could be back on the market, now that the city won't be joining the county in the new court complex.

The Pima County Board of Supervisors last week rejected the city's offer to pay rent, but not a share of the construction cost, to occupy space at the new complex when it opens, possibly next year or the year after.

The county wanted the city to pay $20 million in tenant improvements in addition to paying rent, but the city didn't have the money for it.

With the city out, the new complex will have a couple of floors of empty space. Pima County Administrator Chuck Huckelberry said filling that space won't be a problem.

He said in addition to providing the county with room to grow into the new building, the county can now look to consolidating departments spread out over approximately 18 downtown properties and selling some buildings.

The most likely candidate to be sold first is the building at 97 E. Congress St. that houses the Pima County Regional Flood Control District and the county's Teen Court.

"That's on the streetcar line and we think it's probably positioned well for residential (and) commercial redevelopment," Huckelberry said during a recent supervisors meeting.

Supervisor Ray Carroll, who has criticized the county's rapacious appetite for downtown properties in the past, praised Huckelberry for beginning to think about downsizing its downtown holdings and said now is the right time to do it.

"I think the market is rising. The market will continue to rise. … I am glad to hear that we are talking about divesting," Carroll said, adding he hopes the sell-off doesn't stop at just one building. He encouraged the county to look at other potential properties it could put up for sale.

Suggestions

City Councilman Steve Kozachik says the county should put the former Housing and Urban Development building at 160 N. Stone Ave., which it purchased earlier this year, back on the market, and move the lawyers and public defenders into the new court complex.

Kozachik says the county should not have used taxpayer money to bid against a private-sector group for the HUD building. He thinks now would be a good time for the county to correct that wrong.

"I'd rather see that building driving tax revenue than to see it as just another government building at the gateway to downtown," Kozachik said.

Huckelberry defended the purchase of the HUD building because it is ideally situated for lawyers due to its proximity to the new court complex.

It was also a fiscally prudent move by the county, he said, because the county will no longer be paying rent at La Placita Village for attorney office space, which will quickly pay dividends for taxpayers since the county pays around $360,000 in rent every year. The county purchased the HUD building for $635,000.

Kozachik said he isn't buying Huckelberry's argument.

"The private sector was outbid by $10,000 using taxpayer money to accomplish that," Kozachik wrote in an email. "That's not a bargain for the taxpayers. It's just another government building that could have been placed into the private sector."

Kozachik said the county contradicts itself when it says some of its buildings are best left to the private sector while others aren't.

"It can't be both," he wrote. "And in my world fewer government owned and occupied buildings are good relative to more private sector owned and occupied buildings."

"I'd rather see that (former HUD) building driving tax revenue than to see it as just another government building at the gateway to downtown."

Steve Kozachik,

City councilman

Contact reporter Darren DaRonco at 573-4243
 
This makes it a little clearer on how the city being left out effects the court complex.

This may end up turning out better (at least for redevelopment proponents) than if the city had bought into the courts complex. 97 E. Congress is in a great location and has the perfect skeleton for a smaller mixed use project. Right now, it's just a bum haven. The HUD building on Stone isn't in as good of a location but could still make for a good office building.
 
Small update, but Ari Shapiro's new pizza place in Broadway Village, Falora, seems to finally be in development. The sign in the window projected a fall opening but I think that's been pushed out to spring.
 
The Downtown Links Phase II reconstruction of St. Mary's Rd. will also improve storm drainage in the area, with construction by same company that just completed the Phase I 8th St. drainage segment:


Downtown Links Road Work is Starting on St. Mary’s Road
By Teya Vitu
Downtown Tucsonan
November 19, 2012

Six years after voters approved the Regional Transportation Authority, the first road work is starting on Downtown Links. Downtown Links is the “four-lane arterial roadway connector” that will link the Barraza-Aviation Parkway to Interstate 10 via a new road along the railroad tracks, a realigned 6th Street and St. Mary’s Road. A ground breaking ceremony will take place on Nov. 28 at 9:30 a.m. at the triangle formed by 6th Street., Davis Street and Hughes Street. That’s between the freeway and Granada Avenue.

That launches a 15-month construction period on St. Mary’s Road that will involve a changing variety of lane restrictions from Interstate 10 to Church Avenue. Drivers will likely encounter segments of St. Mary’s reduced to one-lane in each direction, but the street will be open to traffic for nearly the entire construction period. “There will be very minimal impact for the first five months,” said Andy North, project manager for Borderland Construction, the contractor for the St. Mary’s project. “There will be lane closures as we are putting in utility lines.” The St. Mary’s and Granada Avenue intersection will be closed to traffic for three weekends after the gem show in February. Also, St. Mary’s Road will be closed for 30 days to all vehicle traffic between Main and Church avenues around March 25.

The first five months will involve utility work under the street. The tangle of old water, sewer, electric, telephone, cable and gas lines will be replaced and relocated to create a clear path for a new 90-inch storm drain under St. Mary’s, North said. The new storm drain will take storm runoff from the north edge of the El Presidio Neighborhood to the Tucson Arroyo. “During summer, this road floods pretty good. This will take care of all that,” North said. Downtown Links is as much about improved storm drainage at the north edge of Downtown and the 4th Avenue area as it is about building a bypass road around Downtown to reach Interstate 10. Earlier this year, Borderland Construction was also the contractor for the 8th Street Drainage Project, which put in new storm drains on 8th Street, 7th Street and 5th Avenue.

After the utility work, during the summer of 2013, the entire St. Mary’s roadway will be rebuilt from I-10 to Church with four vehicle lanes, six-foot bicycle lanes on each side, eight-foot-wide sidewalks on each side, landscaping, lighting and a signaled pedestrian crossing, said Tom Fisher, the planning project manager for the Tucson Department of Transportation. Updated public information is available at 622-9000 and www.downtownlinks.info. This St. Mary’s stretch is the second of four phases of the Downtown Links project. The first phase was the 8th Street Drainage project. Phases three and four will be building the new stretch of 6th Street about a half block north of the current alignment and the new roadway along the east side of the railroad tracks. The design of phases three and four started one-and-a-half months ago and should be completed in about two years, Fisher said.
 