andrewsaturn
New member
TCC Upgrades
Looks like the TCC will be getting solar panels on top of it's roof. It will cost $10 million and take three months to finish. However, when the Gem show comes to town, all of the tools and equipment will be either taken off site or put onto the roof. It will also be the largest solar project in Tucson and it will generate 3.5 million kilowatt hours per year. To read more about it, here are some links.
http://downtowntucson.kold.com/news/business/68539-tucson-convention-center-gets-its-place-sun
http://www.azcentral.com/news/artic...n-spend-more-than-million-solar-projects.html
http://www.kold.com/category/179377/video-center?autoStart=true&topVideoCatNo=default&clipId=6531235
Looks like the TCC will be getting solar panels on top of it's roof. It will cost $10 million and take three months to finish. However, when the Gem show comes to town, all of the tools and equipment will be either taken off site or put onto the roof. It will also be the largest solar project in Tucson and it will generate 3.5 million kilowatt hours per year. To read more about it, here are some links.
http://downtowntucson.kold.com/news/business/68539-tucson-convention-center-gets-its-place-sun
http://www.azcentral.com/news/artic...n-spend-more-than-million-solar-projects.html
http://www.kold.com/category/179377/video-center?autoStart=true&topVideoCatNo=default&clipId=6531235