Tucson Development Thread


The Food Truck Diaries, Volume 15: The Rolling Chef
POSTED BY ADAM BOROWITZ ON TUE, MAY 24, 2011 AT 8:00 AM

The Rolling Chef is a flame-emblazoned food truck run by the former executive chef of fine-dining establishment Anthony’s in the Catalinas. It can be found on the corner of Stone Avenue and Pennington Street between 10:30 a.m. and 2:30 p.m., weekdays; and outside of the Music Box Lounge at 6951 E. 22nd St. until the wee hours on weekends.

Chef Carlos Aponte said he was let go from Anthony’s in the Catalinas when the recession hit and sales plummeted. It was a bit of a blow—he’d worked at El Parador, opened City Grill for Sam Fox and worked at fine New York restaurants, earning accolades and an impeccable reputation along the way—but there was precious little time to mope around.

“Basically, I had to make my own economy,” says Aponte. “It came down to what would be the most profitable, what would take the least to get started, and what is trendy.”

The result: The Rolling Chef, which has been wowing downtowners with gourmet, street-style tacos, cheese steaks and roast-beef sandwiches. For the moment, it’s about the closest thing Tucson has to the now-famous Los Angeles food truck Kogi BBQ, and Aponte is forever adding to the menu.

Aponte’s tacos are stuffed with shredded Angus beef, pit-roasted pork and other things he carefully roasts over special wood until it all collapses into tender shreds. It is then stuffed in a tortilla from the Anita Street Market and topped with coleslaw and caramelized onions, or cabbage salsa and lime, and handed over to you for the paltry sum of $1.

There's also talk of a teriyaki chicken taco topped with Asian salad and pineapple, but that's still in the development stages.

The Rolling Chef is down this week—it's getting a new engine—but should be back next week.

You can follow the truck on Twitter here.

Original Article
 
From this site ,

1. City/County Courthouse – build a new courthouse to house both City and County operations
....
11. Create downtown entertainment district – meant to designate an Entertainment District primarily to ease restrictions on sale of alcohol
....
12. Ronstadt Transit Center redesign – consider adding retail/mixed use to the southern border of the RTC
....
14. Westside projects / Mission Garden – seek out funding and continue in conceptual design on the properties.
....

:previous: indication what's on the table at city hall next few months. Wonder what #1 meant ... does it include everything besides the legal wing of the city/county. I guess we'll wait and see.
 
Stone-Toole dirt lot triangle may get Joint Courts after all
May 25, 2011 (10:11 am)

By Teya Vitu

The long-delayed Joint Courts Complex may start coming out of the ground in bits and pieces by the end of the year.

Planning on this city-county court house stopped in early 2008 - before any construction started - because projected costs for the 410,000-square-foot complex had ballooned to $140 million, double the funding available from a $74 million 2004 county bond.

Since then, the vision was reimagined and downscaled to at least get the basic bones of a building up while construction costs are way down.

“We know we don’t have enough money to built it all now,” said Reid Spaulding, Pima County Faciities manager. “We really need to capture that opportunity of $5 million to $7 million savings if we could let loose soon.”

The Joint Courts Complex is slated for the 4.3-acre vacant triangle behind Hispanics por la Causa bounded by Stone and Toole avenues.

The project looked promising enough in 2005 as sections of Council Street and Grossetta Avenue within the triangle were abandoned and removed, and nearly 1,400 graves from a forgotten 19th century cemetery were discreetly removed from November 2006 to August 2008.

While the archaeology, remediation, utility removal and land acquisition rang up for $17 million, it became clear the county had nowhere near the money need to fund a design based on demographics, caseload growth and judge growth in what was the fastest growing state in the country.

“We got to that point where we had a building we couldn’t afford,” Spaulding said.

Just a few months later, Wall Street toppled, Tucson’s projected growth rate slowed precipitously, and the original court house plans were scrapped.

“We needed to start fresh,” Spaulding said.

Demographic, caseload and judge projections were recalculated to the new reality of much slower growth, and the county came back with a phased approach, starting with a 256,000-square-foot complex for the first phase.

“The first phase should easily carry us to 2025,” Spaulding said.

A footprint will be drawn in for a potential second phase and utility stubs provided, but no plans will be drawn since the second phase is not anticipated for at least 15 years.

This is where the bits-and-pieced dynamic of the first phase comes into play.

Spaulding has only $17 million in bond funding remaining, and he’s proposing getting started with the basic skeleton, which he estimates at $35 million to $40 million.

“We want to find a way to move ahead with a shell and central plant with the chiller, cooling system and emergency generator, like building a spec building with no tenant improvements,” Spaulding said. “It will be a Board of Supervisors decision whether the county wants to bridge that ($18 million to $23 million) gap.”

He said another county bond will probably go to voters in 2013 to fund completion of the complex, whose total cost is unknown.

For now, Tucson-based Sundt Construction has been brought on as construction manager at risk to establish a guaranteed maximum price for the shell-and-central-plant segment, which Spaulding expects to be set by September or October. Once the price is set, construction could start as soon as November.

Construction drawings are about 60 percent complete, but the real challenge in the coming months is deciding how much to include in this initial phase.

“We want to put stuff in that doesn’t cost a premium later,” Spaulding said.

One item under consideration are the elevators, at least 14 of them will fill the buiding.

‘”The question is to what extent do you build out those elevators now,” he said.

The Joint Courts Complex also impacts the ArtWalk that the Warehouse Arts Management Organization and Downtown Tucson Partnership want to build on the Toole Avenue sidewalk across from the court site. Installation of the ArtWalk in May was delayed because Toole and Stone will be torn up for utility work for the court complex.

Spaulding wants the court complex to fit into the Arts District. He’s planning a landscaped water harvesting area along Toole.

“We want to be part of that revitalization,” he said.

The Joint Courts Complex will house the City Court and Pima County Justice Court.
 
Alright dudes and dudets, I'm off to a very very long 'working vacation' .... please, continue Tucson's "mission". Help yourself in posting updates in this forum. And it looks like Councilman Kozachik is considering integrating city hall/county administration in one tall high rise. Hope it gets built ... more jobs to the local economy. It would probably make way for private development from the old and ugly city hall/county offices (except the old county courthouse). Too many gov't buildings downtown. I've pretty much showered the city with my ideas over the last few months. I have accomplished my mission! Adios Amigos! :notacrook:

WorldArchitecture site

other wish list downtown - mini-Walmart, mini-Target, IKEA, McDonald's, Wendy's, French Crepe and Cajun Food Truck, UA Science Center (with the $300 million Rainbow Bridge), a real IMAX , closed and open concert hall, aquarium, more affordable condo/apts, what the heck....a large ferris wheel (put some fun in this boring city) .... of course, Skyscrapers.
 
Last edited:
Thrifty Lot may yet get a hotel
June 01, 2011 (1:50 pm) | Permanent Link

By Teya Vitu

A Downtown hotel may yet happen for the empty lot on Congress Street that Bourn Companies has owned since 2007.

Don Bourn, the managing member, has entered into an agreement with True North to bring a 5-story, 123-room Hampton Inn to Congress between Scott and Stone avenues.

The crucial missing ingredient, as it’s been since 2008, is financing. Bourn sees more promise now than he has in the past three years.

“The financial market seem like it’s starting to get a lot better for hotels,” Bourn said. “Can we get financing in 90 to 190 days or 12 to 18 months? It’s hard to predict. We’re willing to be creative and make this happen.”

Bourn said he’s just as eager as the community to see something built on the former Thrifty Block, which has sat vacant since September 2004. He said he’s invested more than $4 million in the project.

He said once construction contracts are signed, a hotel could be open in 12 months.

In the mean time, Bourn is dealing with the board of the Rio Nuevo Multipurpose Facilities District and Rio Nuevo critic John Kromko, both challenging Bourn acquiring the property for $100 and so far building nothing on it.

“Our whole point is the Rio Nuevo board would be a catalyst to make things happen Downtown and be a positive force to get things built,” Bourn said. “I had spent $3 million by the time I bought it for $100.”

The city, which managed Rio Nuevo at that time, entered into a development agreement with Bourn in April 2006 to sell the property to him for $100 with the intention of having a condo complex called The Post completed by the end of 2008.

Bourn lost 18 months when negotiations failed with the bank next door to acquire its parking lot. This required him to redesign The Post to incorporate parking.

Bourn said National Bank of Arizona withdrew $3.9 million in financing for The Post in 2008, and with that the luxury condo plan died.

Bourn lined up with True North in 2010 to plan a hotel and recently landed Hampton Inn.

They have run up some number:
40,000-50,000 room nights a year
$2 million in guest spending
30 fully-time jobs
1,000 square feet of retail

“It doesn’t have a restaurant,” Bourn stressed. “One of the things we want to do is market the hotel with the amenities already here.”

Bourn understands public frustration.

“We understand people want results,” he said. “You have to keep working through things.”


:previous:

It's good to hear news about construction in that lot especially when it could come as early as within the next 12 months. I wonder what color the building will be? If it is a Hampton Inn wouldn't it be blue or something? :rolleyes: That would be cool but I'm guessing they'll stick to the contiguous brick colors of the buildings next to it.
 
If they build that Hampton Inn, it better have street side Retail and not look like a generic Hampton Inn:

HamptonInnSuites.jpg
yuck.
 
yeah i would rather see that lot sit for a little while longer than just put a Hampton Inn there. That lot is in such a perfect location for something really cool to be put there, and with it being directly on the streetcar line i guarantee there will be better ideas and concepts for that space other then a cheap hotel real soon.
 
Don't let the name fool you...

A Hampton might not be as bad as the first impression that comes to mind, here are a few shots of some of the more "tasteful" Hampton Inns.

Maybe the fresh sheets aren't such a bad idea after all :cool:

AUS_HISD-exter-1.jpg

Hampton Austin
foto-hotel-hampton-inn-center-city-philadelphia.jpg

Hampton Philly
hampton-inn-st-louis-downtown-at-the-arch-mo.jpg

Hampton St Louis
hampton_inn_suites_boston_exterior_boston_massachusetts_unitedstates.jpg

Hampton Boston
hampton-inn-1.jpg

Hampton Greenville
 
There is something to be said for having a national chain located downtown. People booking a hotel online feel more comfortable with chains. You know what you are gonna get.

The photos look reasonable. The Austin TX Hampton would would look good in Tucson.

hampton_option6.jpg
 
More news on Freeway Frontage - From the Downtown Tucson Partnership

Committee weighing two proposals for freeway frontage road
June 06, 2011 (10:22 am) | Permanent Link

By Teya Vitu



Two revised proposals to buy 8.41 acres of city-owned land along the freeway frontage road are being reviewed by a selection committee with a recommendation for City Manager Mike Letcher possible by June 15.

After that Letcher, could move forward with the recommendation or forward the proposals to the City Council to pick one, said Hector Martinez, director of the city real estate program.

A selection committee had whittled three proposals down to two in spring and asked those two teams to refine their proposals by June 1 for the strip of land between Congress and Cushing streets.

This is the property with the temporary Greyhound bus depot and the Catalina Parking Lot. The goal is to sell the land for at least its appraised value of $3.68 million, revised down from $5.35 million when the request for proposals was issued in October.

The initial Peach Properties proposal included 40,000 square feet of streetfront commercial, an 80-100-room boutique urban hotel, residential units, and the Greyhound depot would remain on the property.

Phoenix-based Evergreen Real Estate Development initially proposed a 180-room Drury Inn & Suites, a sit-down restaurant along Congress Street, and potentially some housing and offices south toward Cushing Street.

See story here
 
Follow up on my previous post...

Committee weighing two proposals for freeway frontage road

Drury makes the Peach design for El Presidio look Stellar. Let's hope if Drury gets the contract, they come up with something other than their four bland cookie cutter models
:slob:


Drury Cookie Cutter #1 (almost bearable)
Drury-Inn-And-Suites-Greenville-photos-Hotel.JPEG


Drury Cookie Cutter #2
Drury-Inn-And-Suites-Springfield-photos-Hotel.JPEG


Drury Cookie Cutter #3
Exterior_F_1.jpg


Drury Cookie Cutter #4
Exterior_E_1.jpg



There are however, a few I found.... That might be almost palatable :koko: ...


Drury Phoenix (Formerly a Radisson so forget anything like this)
11114_53_b.jpg


Drury San Antonio-La Cantera
283556.jpg


Drury Flagstaff
Exterior_F_1.jpg
drury-flagstaff1-460x345.jpg



Peach El Presidio Concept

U-of-A-RFP-part-2-101.jpg
 
Tucson has a serious problem with getting around.

My plans:

Aviation Highway
To fix this problem I think that aviation highway (which will hopefully be extended to St. Marys road) should be connected to I-10 past downtown.
I also think that Alvernon north of I-10 to Aviation Hwy should be a freeway. These changes would help citizens living in the south of I-10 access Broadway,22, and Speedway faster.

I-10
I-10 is used everyday by 200,000+ cars and in the future maybe 500,000+ cars.The big problem for growth comes from the Kino-Houghton. The freeway is only a two lane and needs to be extended. To me this problem seems to be a simple fix because there is enough space in the median to add more lanes and still have an irrigation system.
As much as I love Tucson we still have ugly sides. On I-10 a simple fix to make Tucson more appealing to travelers is building a wall hiding the uglyness away. I feel that the wall should be from Alvernon to Kolb hiding the power plant,the dump and ugly junkyards. This wall will also help quiet the freeway sound to the houses nearby.
Another way to make Tucson better looking is to remove our weeds. In places where we don't want plants we should pour bleach and/or vinegar. Both liquids are usually cheaper than weed kill and they last longer.

Rita Road and I-10 to Sahuarita Road and I-19
The future of Tucson development looks like it is going to be mostly on the southeast and east sides of the city. To help the future citizens fight the daily traffic we should build a freeway from Rita Road and I-10 to Sahuarita Road and I-19. Make it a 3 lane because it ends up costing more money to expand the freeway later.


Tucson to Yuma
The only way to drive to California from Tucson is going north I-10. This waste time and gas. Starting at the I-10 and I-19 junction a new freeway should begin taking you to Yuma,Arizona. Once in Yuma this freeway will become I-8.
Houghton
The city is planning on fixing Houghton but no major actions have been taken yet. I just want to know when is the city going to start expanding the road! traffic is horrible. EXPAND HOUGHTON ALREADY!
 
:previous:

All of those take great amounts of money and time. Houghton is already being expanded, its going to take about 10+ years though, you have to be patient.
 
:previous:

All of those take great amounts of money and time. Houghton is already being expanded, its going to take about 10+ years though, you have to be patient.

Ya it would cost at least 800 million and 20+ years but will be worth it! According to the city of Tucson website Houghton and Valencia to Houghton and Irvington will be expanded in July and I believe the Houghton/Broadway intersection will be expanded in October. But we all know Tucson so I'm not expecting work until 2012! hahaha
 
A Hampton might not be as bad as the first impression that comes to mind, here are a few shots of some of the more "tasteful" Hampton Inns.

Maybe the fresh sheets aren't such a bad idea after all :cool:

AUS_HISD-exter-1.jpg

Hampton Austin
foto-hotel-hampton-inn-center-city-philadelphia.jpg

Hampton Philly
hampton-inn-st-louis-downtown-at-the-arch-mo.jpg

Hampton St Louis
hampton_inn_suites_boston_exterior_boston_massachusetts_unitedstates.jpg

Hampton Boston
hampton-inn-1.jpg

Hampton Greenville

I like the modern look of the Hampton in Boston and Greenville and I even think that the Peach El Presidio Concept is right for Tucson.
The Hampton in Austin,Philadelphia and St. Louis are too old for Tucson and plus it's not even Tucson style.
A Hampton that is kinda like the MLK apartment building would be more appropriate for Tucson.
 


Back
Top