Tucson Development Thread


I lived in Phoenix in the mid-80's. There was also proposal to build the tallest building in the world (Phx) back then. In fact, there was even a proposal to build a light rail system in Phoenix in the 80's. Those were the days when all those crosstown freeways were planned and actually built in Phoenix. Man, I wished Tucson would build at least one crosstown freeway...it's getting too crowded during rush hour.

I would love a crosstown freeway but the opposition and price is too much. i think building a series of grade-separated intersections along broadway would be a good alternative. Then there would be a speedy way to go across town but without the effects having a freeway going through the city.
 
I would love a crosstown freeway but the opposition and price is too much. i think building a series of grade-separated intersections along broadway would be a good alternative. Then there would be a speedy way to go across town but without the effects having a freeway going through the city.

I totally agree:tup: Not only along Broadway, but better yet Grant road as well. It runs through the heart of the city and would make going from the eastside to the northwestside alot quicker.
 
Rainbow is good.

I will not stop talking about the rainbow until it happens!!! As a citizen of Tucson i truly want a landmark and Rainbow bridge is the best!!! Look at how landmarks have done to other cities


The Gateway Arch of St. Louis:costing $13 million ($89,638,095 today) Gives St. Louis A lot of tourism.


Las Vegas : The Los Vegas sign is very simple but is an icon for Las Vegas.


Seattle: The Space Needle; it was built for the 1962 World's Fair, during which time nearly 20,000 people a day used the elevators, with over 2.3 million visitors in all for the World Fair.


Toronto Canada: Cn tower: The tallest freestanding structure in the world.



All of these cities have benefited because of these structures. Most also got hotel towers to follow. So why can't Tucson have one? besides if we don't Phoenix or New York will steal it!!!
 
In detailing all the bad news we were expecting, the much-anticipated Rio Nuevo audit slams the original board and city management for straying from the initial purpose of the TIF district by not having specific guidelines for spending their funds and then throwing lots of cash at extraneous projects, rather than focusing on the convention center and creating revenue sources for the future.

Even with the scathing audit, state Sen. Frank Antenori says there is little chance that the state will dismantle Rio Nuevo, as there are so few tax dollars to be recouped from doing so. With the hotel decision behind them, Tucson officials are now anxious for the city and the new Rio Nuevo board to take the lessons learned and finalize an intergovernmental agreement (IGA) so both sides can work together on downtown projects that are feasible and affordable.



Audit slams Rio Nuevo board
City disorganization, inappropriate projects and few results found

by Rob O'Dell
Arizona Daily Star
October 30, 2010

Tucson's Rio Nuevo downtown-redevelopment district was beset by mismanagement and a lack of financial oversight and internal controls that led a majority of its projects to remain incomplete despite more than $230 million being spent, a state-ordered audit released Friday shows. While the audit conducted by Crowe Horwath of Los Angeles for the state auditor general is not the smoking gun some had expected, the report, more than 75 pages, confirms that much of the Rio Nuevo money has been spent on planning or projects that stalled. Money also went to projects that - while not illegal - were not in the spirit of Rio Nuevo's mission, the audit says. And the city's financial record keeping was disorganized, making tracking the spending nearly impossible.

The audit's findings mirror those made in Arizona Daily Star investigations of Rio Nuevo over the past three years. Key findings in the audit include:

• Rio Nuevo completed only two of the 15 projects listed on the 1999 ballot - the Fox Theatre and the Presidio wall.

• More than half of Rio Nuevo's projects are incomplete or on hold.

• The city's Rio Nuevo financial data on projects was "abbreviated, incomplete and confusing."

• Money was spent on projects that were not compliant with Rio Nuevo's mission.

• The city reimbursed the University of Arizona expenses related to a proposed science center that were questionable and not allowed by state law.

• The city charged Rio Nuevo excessive interest rates for the district's unpaid loan balances.

• The previous Rio Nuevo board failed in its financial oversight.

"When viewed from a value-added perspective, the current outcomes are unsatisfactory," the audit said. "Only a small number of other projects - two theaters, underpass, roundabout, and the two TCC projects - are tangible, complete and recognized as such." The city views the audit as "lessons learned," City Manager Mike Letcher said. "It's an opportunity to close this chapter of Rio Nuevo."

Many Rio Nuevo critics hoped the audit would reveal new allegations of malfeasance by Tucson's bureaucrats and elected officials. However, the report doesn't do that or "name names." In fact, there's not one name listed in the audit. The audit spends many pages criticizing the city and Rio Nuevo for not making the Tucson Convention Center a central focus of the district. Because the audit is almost uniformly negative, it mostly is a condemnation of how the city and Rio Nuevo operated before 2010, said Alan Willenbrock, a former Rio Nuevo board member who is a chartered financial analyst. The only positive comments are about the new state-appointed Rio Nuevo board and Rio Nuevo's former Citizens Advisory Committee. "Many of these audits say positive things, outline successes, and have a few areas of concern," Willenbrock said. "This one is almost completely opposite. … As these things go, it's pretty scathing."

Only two completed projects
Of the 15 projects originally listed on the ballot, only two have been completed more than 10 years after voters created the district, the audit found. Those two were Fox Theatre and the Presidio wall. But the Fox Theatre later had to be taken over by the city to avoid bankruptcy and the city spent nearly triple the original budget of $4.2 million. In addition, the theater still owes the city $7.5 million, which it will unlikely be able to repay.

Because the district spent so much money on an assortment of projects - many with only tenuous ties to the redevelopment - the district "was spread too widely and too thin" and missed the economic leveraging tools to bring more money into the district. "As a result, 10 years later the city is left still without an economic catalyst that is designed to bring in outsiders, in a way to inject the historic core of Tucson with new money," the audit said.

Lax financial control
The audit found the city's Rio Nuevo financial data to be incomplete and confusing. "Other than generally using the same project names, this information does not track one report to the next," it said. This "deficiency of detail and lack of continuity" continued until August 2008, just after the Star published the first installment of its Rio Nuevo investigation, in which more than 100,000 records were scrutinized to create the first detailed account of how Rio Nuevo money was spent.

Noncompliant projects
The audit identified five Rio Nuevo projects it contends were, or could be, noncompliant with state laws. Those projects include three that were outside the district and had tenuous ties to its mission: a roundabout on South Grande Avenue and infrastructure projects in Barrio Viejo and Barrio Sin Nombre. The report also said two other projects were noncompliant. One was a housing project by developer Don Bourn. It was never built, despite Rio Nuevo spending $900,000 and the razing of a 100-year-old building. The audit said housing was not a purpose of the district under state law. It also criticized a land purchase made in north downtown, where the Rio Nuevo later built the Presidio wall, so the city could complete a land swap with the Downtown Development Corporation.

UA reimbursement
Reimbursements to the UA for expenses for computers, salaries, iPhones, phone service, travel to Italy, subscriptions, food and conferences were questionable and not allowed by state law, the audit said. These expenses were highlighted by a Star investigation into the spending for a proposed science center project with the UA that was ultimately scrapped.

Excessive interest
The city charged the Rio Nuevo district excessive interest rates on the money it owed the city, the audit found. It estimates the city overcharged Rio Nuevo about $450,000. The audit recommends the city pay back the money. The amount could be much larger if the excessively low interest rates of the previous decade were used to calculate the interest owed, the audit said. The city simply charged the interest rate at which it borrowed, City Finance Director Kelly Gottschalk said. Rio Nuevo still owes the city $1.7 million, she added.

Rio Nuevo Board's failures
The strongest criticism from the audit was directed at the Rio Nuevo board that governed the district through 2009. It found the board's "lack of strategic oversight and management" resulted in a "disjointed use" of Rio Nuevo money for "subordinate projects or for funding non-sustainable major projects only tangentially related to the district's mandates." The board didn't meet for a year and started meeting again only after the first installment of the Star's Rio Nuevo audit in 2008. "In essence, the district was treated as an extension or department of the city," the audit said. "The pre-2010 district board lacked essential fiscal and project-specific management reports and relied heavily on oral reports from city staff to oversee and administer funds in which (the) District had fiduciary responsibility."


For more info:

Arizona Illustrated interview with City Manager Mike Letcher: http://www.azpm.org/news/story/2010/10/29/1412-what-now/

Inside Arizona Business article: http://www.azbiz.com/articles/2010/10/29/news/doc4ccb12f3ef56a900455645.txt
 
Tucson Architecture

I'm a forward looking guy and hate to constantly remember past mistakes ( referring to the Rio Nuevo debacle ) ... life is too short . I found this site via google .

I hope the city would refer to this site as a reference on what needs to be done with regards to upgrading Tucson from it's old barrio mentality. Tucson really needs to move forward with regards to it's architecture. Tucson seems obsessed in building this barrio and that barrio. We're in the 21st century not the 19th century.

If Tucson needs to build a barrio, at least make it look like a 21st century barrio not a museum artifact.
 
I totally agree:tup: Not only along Broadway, but better yet Grant road as well. It runs through the heart of the city and would make going from the eastside to the northwestside alot quicker.

Grant Rd. crosstown freeway was put up to vote around 01-02, it was turned down by the voters. Yeah, Grant Rd. would be perfect for a freeway due to it's proximity at the UA and TMC. In fact, Kolb-Grant-1st Ave would make a good snaked crosstown freeway.
 
I will not stop talking about the rainbow until it happens!!! As a citizen of Tucson i truly want a landmark and Rainbow bridge is the best!!! Look at how landmarks have done to other cities


The Gateway Arch of St. Louis:costing $13 million ($89,638,095 today) Gives St. Louis A lot of tourism.


Las Vegas : The Los Vegas sign is very simple but is an icon for Las Vegas.


Seattle: The Space Needle; it was built for the 1962 World's Fair, during which time nearly 20,000 people a day used the elevators, with over 2.3 million visitors in all for the World Fair.


Toronto Canada: Cn tower: The tallest freestanding structure in the world.



All of these cities have benefited because of these structures. Most also got hotel towers to follow. So why can't Tucson have one? besides if we don't Phoenix or New York will steal it!!!

Please don't stop! I could imagine myself eating a breakfast burro w/ espresso staring at that bridge on a fine sunday morning.
 
tucson is in trouble because there are too many people running it.

There should be 1 mayor who gets stuff done

3 city council members to inform the mayor of the city's needs and wants

1 treasurer

nothing gets done with too many people running a city. Problems we have now
1. we never get anything done due to our weak mayor system.

2. too many people with too many opinions prevent anything to happen

3. while the council members have meetings about skyscrapers,bridges,neighborhoods ect; they are getting paid and wasting tax payer money.

the new plan would allow...


1. the mayor would have more power


2. the city would have more money


3.decisions wont waste too much tax payer money


4. tucson will be on (more) maps


Same with rio nuevo. the only place the tax money is going to is the rio nuevo employees wallets. there are too many people in rio nuevo. there should be a leader, a treasurer and 2 others. even so rio nuevo should tax the whole city or nothing at all.in this economy i think there should be nothing at all. maybe in 2015 when the economy is hopefully better the city could be taxed. but now is a bad time.
 
we should write a letter to the city council about this bridge.

Help yourself. I've already sent a handful of ideas to one of the council members among them is a biosphere park, plaza by the convention center that's extended over a bridge to the west side with our own 'spanish steps' on each end of the bridge, the convention center double as an art gallery, a tower, a grocery store etc.. I even requested something far out such as extending the light rail all the way to mt. lemon.

I hate to see a convention center building empty at least half the time, so might as well double it as an art museum. The plaza would come in handy for Tucson's outside events such as county fair, tucson meet yourself, UA spring fling, gem show etc... The rainbow bridge might come in handy right by the plaza.

Other stuff I suggested was a real top of the line IMAX theatre, cafes and restaurants facing the plaza and convention center with chairs/tables in between and of course, more apts with at least 5 floors.

I might add, I suggested to develop the convention center into phases. Each phase initiated per $$ available instead of one big project. We can start out with the open plaza and a small or upgraded convention center. As funds get generated, go to next phase such as a bigger new world class convention center and so forth.
 
Help yourself. I've already sent a handful of ideas to one of the council members among them is a biosphere park, plaza by the convention center that's extended over a bridge to the west side with our own 'spanish steps' on each end of the bridge, the convention center double as an art gallery, a tower, a grocery store etc.. I even requested something far out such as extending the light rail all the way to mt. lemon.

I hate to see a convention center building empty at least half the time, so might as well double it as an art museum. The plaza would come in handy for Tucson's outside events such as county fair, tucson meet yourself, UA spring fling, gem show etc... The rainbow bridge might come in handy right by the plaza.

Other stuff I suggested was a real top of the line IMAX theatre, cafes and restaurants facing the plaza and convention center with chairs/tables in between and of course, more apts with at least 5 floors.

I might add, I suggested to develop the convention center into phases. Each phase initiated per $$ available instead of one big project. We can start out with the open plaza and a small or upgraded convention center. As funds get generated, go to next phase such as a bigger new world class convention center and so forth.

We need an aquarium and pandas at the zoo. we also need ant eaters around the city to eat all of the ants. i was at toys r u on broadway yesterday and there was like 2000 ants
 
Grant Rd. crosstown freeway was put up to vote around 01-02, it was turned down by the voters. Yeah, Grant Rd. would be perfect for a freeway due to it's proximity at the UA and TMC. In fact, Kolb-Grant-1st Ave would make a good snaked crosstown freeway.

Yeah Grant/Kolb would work perfectly. Has anyone ever been to this site? http://www.arizonaroads.com/urban/index.html

2mqwb50.gif
 
Downtown renovation expert

Here's a link from a downtown renovation expert ... in case anyone is interested.
I sent this link few years back to one of the city council members. This expert favors building lots of affordable housing downtown to renovate.
And she prefers renovating downtown primarily for the needs of the surrounding community ( tourism comes secondary ).
 


Back
Top