Tucson Development Thread


With $8.6M of infrastructure work already underway, the first phase of the proposed Arizona Bioscience Park may be graduate student housing:


AZBioscienceParksiteplan.jpg




UA Bioscience Park ready to sign apartments agreement
Deal negotiated for graduate students, others

by Becky Pallack
Arizona Daily Star
May 2, 2010

The new Arizona Bioscience Park is close to signing a development deal for graduate student apartments. The park is negotiating the business terms with a developer, said Bruce Wright, who heads the University of Arizona's research parks. He declined to name the developer, citing a non-disclosure agreement. The company is designing an complex with 1- to 3-bedroom apartments and a total of 330 beds. The site is 2.5 miles south of the UA campus near South Kino Parkway and East 36th Street. The target residents would be graduate students, married students and junior faculty, Wright said. The plan could be ready for the Arizona Board of Regents' approval in August. The project could open in 2012.

The park consulted with UA's Residence Life department, which rents to grad students at an apartment complex on the west side of campus. However, the new project will be private and not leased through the UA, Wright said. On-site housing someday will be a great feature of the park for grad students who will work and learn there, said Jim Van Arsdel, residence life director. Many students who work on campus won't want to make the drive, he said. For the project to succeed, the price will have to be right for students, namely low or subsidized rent, said Art Wadlund, a partner with the Tucson office of Hendricks & Partners, an apartment sales firm.

Roadways and utilities are under construction at the Arizona Bioscience Park. The work is being done by Tucson-based SQP Construction under a $4.7 million federal-stimulus grant. Low construction costs mean the park could have about $1 million in grant money left. The UA is asking to use the money for more road work, landscaping and storm-water drainage. The master plan for the park includes a high school, labs, offices and a hotel.
 
The ongoing sales of numerous properties in the eclectic Warehouse Arts District is signaling an inevitable uptick in tenant rents and raising concerns of gentrification:


CitizensWarehouse.jpg

The Citizens Transfer and Storage warehouse on Sixth Street west of Stone Avenue.
(photo: Samantha Sais)


Funky or Gentrified?
Optimism reigns as Warehouse District properties change hands—but not everyone is happy

by Dave Devine
Tucson Weekly
May 6, 2010

Many politicians and property owners forecast a promising future for downtown's historic Warehouse Arts District. But not everyone shares that sentiment. "I'm not optimistic about the district," reflects painter Joe Hatton, who has leased studio space in the old Citizens Transfer and Storage warehouse, on Sixth Street west of Stone Avenue, since 2006. "I'd really like to see it be workspace for artists," Hatton continues, "but I'm 90 percent certain that even if the warehouses stay as artist space, they'll be more expensive than now and will probably be out of my price range in five years." That outcome wouldn't follow the philosophy established by the City Council when it adopted a plan for the area in 2004. It states: "This plan's goal is to develop the Tucson Historic Warehouse Arts District as a center for incubation, production and exhibition of the arts, with artists at its heart." Hatton presently pays 50 cents per square foot monthly for space with natural light, and he knows that's "very fair." But he's located in a building the city of Tucson has said is "in disrepair, with numerous signs of deferred maintenance, inadequate heating and cooling capabilities and inadequate restroom facilities."

Now controlled by the city, the building for the past few decades has been owned by the Arizona Department of Transportation (ADOT) and leased out to artists at very affordable rates. City Hall, however, is in the process of identifying a nonprofit, arts-related master leaseholder to manage the building under a five-year agreement. Last week, proposals were due to the city to oversee the Citizens building. (For more information, see "Good Citizens.") In addition, purchase offers for the historic Steinfeld Warehouse on West Sixth Street and a structure at Toole and Sixth avenues long occupied by artist studios were also solicited. The proposals submitted by the April 29 deadline included a proposal on each property from the Warehouse Arts Management Organization (WAMO). A recommendation is expected to go to the City Council this month or next month. The city may require the chosen organization to make "numerous upgrades, structural improvements and ADA (Americans with Disabilities Act) compliance" to the Citizens building. "They've told the artists (in the building) that the rent won't go up, or it will be just a minor increase," Hatton says about some of the nonprofit groups interested in managing the building. But because of several problems with his space, he notes: "If (rent) does go up, I'm seriously considering Steve Fenton's offer."

Fenton recently purchased three warehouses near Toole and Stone avenues from ADOT. He's shown space to Hatton, who calls the requested rent "pretty reasonable." Fenton says he's made some improvements to his buildings, and he's had lots of people look at 15-19 E. Toole. "They'll still have affordable rents," Fenton says about the buildings now under his ownership, "plus the buildings will be maintained in better condition." However, there are potential issues with the spaces, Fenton observes. "Parking is the No. 1 problem," he lists. The other, he says, is Pima County's long-delayed plans to build a consolidated courthouse just across Toole. "The development of the courthouse site is huge," Fenton comments. "Right now, it's an unsightly lot, but with a new building with new bodies (in it), it would bring activity to the area." Patricia Schwabe of Peach Properties has purchased two warehouses on Toole from ADOT. She agrees the proposed courthouse is important, especially because of the additional public parking it would provide. However, Schwabe says the decision to place the proposed new building's parking garage one block away from Toole hurts. According to Pima County's Reid Spaulding, that choice was made in order to allow the over-budget courthouse to be built in phases. Due to a lack of funding, it could be several years before any construction work begins on the courthouse.

Another change is also in the works for the Warehouse District. A tailor-made land-use overlay zone is being prepared for much of the area. A meeting was held last week to discuss the possibilities for property south of the railroad tracks that split the Warehouse District. Architect Corky Poster, who is coordinating the land-use effort, invited those in attendance: "Please write your own zoning ordinance." Not surprisingly, parking was one of the major issues discussed by the 30 or so people participating. The affordability of the rental space in the district, however, apparently wasn't mentioned by anyone.

Councilwoman Regina Romero participated in the gathering and says that she hopes the Warehouse District remains "funky" despite all of the change. That "funky" ambiance has been created over the years by the combination of old buildings in need of repairs, and artists seeking cheap rental rates who are willing to put up with inconveniences. "We have some really cool investors," Romero says about the new owners who have bought property in the district. Schwabe concurs. "It can remain funky," she says, "and doesn't have to transform into gentrification." However, Hatton disagrees with those optimistic projections. "I don't think the district will remain funky," Hatton says. "I see it changing already. Some artists have left, and its funkiness may be extinct in the future because of more rules and regulations."
 
The pre-construction phase has begun downtown for the streetcar line, as the recent USDOT TIGER grant stipulates that the project must be completed by Feb., 2012:


Nighttime streetcar work will close some streets
Downtown Tucsonan
May 10, 2010

Construction alert from the Tucson Department of Transportation:

NIGHT WORK – Monday, May 10 through Friday, May 14

Potholing for underground utilities will take place nightly Monday through Friday along Broadway Boulevard in the downtown area. One through lane will be maintained at all times. All work will take place between 7 p.m. and 5 a.m. the following morning:

Monday, May 10
• The right lane of eastbound Broadway Blvd. will be closed between Stone and Church Ave.

Tuesday, May 11
• The right lane of eastbound Broadway Blvd. will be closed between Stone and Church Ave.

• Northbound Scott Ave. will be closed between Jackson and Broadway.

Wednesday, May 12
• The right lane of eastbound Broadway will be closed between Scott and 6th Ave.

Thursday, May 13
• The right lane of eastbound Broadway will be closed between 6th Ave. and Arizona Ave.

Friday, May 14
• The right lane of eastbound Broadway Blvd. between Arizona Ave. and 5th Ave.

This work is in preparation for the Tucson Modern Streetcar Project. Prior to placing rail and constructing streetcar stops, construction crews will be potholing for underground utilities. This is the first in a series of construction alerts that will be issued throughout the pre-construction phase of the Tucson Modern Streetcar Project. These alerts will announce detour and closure information as it affects traffic. Motorists are asked to obey all posted speed limit signs within the construction area and be alert for construction crews and personnel working in the area.

The Modern Streetcar will be a 3.9 mile, high-capacity line connecting The University of Arizona, Arizona Health Sciences Center, University Main Gate Business District, 4th Avenue Business District, Congress Shopping and Entertainment District, Downtown Tucson, and the Downtown redevelopment area west of I-10.
 
There is currently a lot of confusion about the completion date required by the TIGER grant. February 2012 is not necessarily correct.
 
There is currently a lot of confusion about the completion date required by the TIGER grant. February 2012 is not necessarily correct.

That date is what has been reported in the local media, but if you have more accurate information and sources, please share them with us.
 
As Providence Service Corp. moves its headquarters into the downtown this week, it has plans to occupy two adjacent buildings for 50 additional employees and also enliven Broadway with new retailers:


ProvidenceServiceHQ.jpg

(photo: Downtown Tucsonan)


Providence already sets sights on expansion Downtown
by Teya Vitu
Downtown Tucsonan
May 11, 2010

Tucson-based Providence Service Corp. plans to open its new Downtown headquarters office the week of May 10, CEO Fletcher McCusker said, but may be expanding farther along Broadway in the future. The national provider of behavioral and education services is moving into a historic building at 64 E. Broadway into a 1909-19 structure rechristened The Scott. McCusker said the $1 billion company had outgrown its space at Craycroft Road and Fifth Street. McCusker said he also has an option to lease the neighboring 57 E. Broadway, also owned by Peach Properties, and he said he put in an offer to buy the former federal courthouse annex at 44 E. Broadway. That is the four-story building, owned by Bank of the West, with the entire front wall removed. Bank of the West spokesman John Stafford did not confirm or deny Providence’s offer. “We have received some offers and are entertaining bids,” Stafford said.

The company will bring about 50 of its 350 Tucson employees into The Scott building. The Scott last year underwent a façade renovation funded with $125,000 from the city’s Façade Improvement Program and matched by the building’s owners, Peach Properties. In part, the new façade attracted McCusker Downtown. “I think that’s some of the best money the city has spent,” McCusker said. Acquiring access 57 and 44 E. Broadway would allow Providence to move 50 more employees Downtown, McCusker said.

McCusker noted once UniSource Energy/Tucson Electric Power builds its new corporate headquarters building across Scott Avenue there will be two publicly traded companies across the street from each other. He said he plans to add retail on Broadway, as will TEP. “In the next couple years, Broadway should be a pedestrian corridor,” McCusker said. “There is unbelievable energy going on Downtown. The private sector is spending our own money.”
 
Rio Nuevo to wait 2-3 weeks on hotel call
New board evaluating feasibility

by Rob O'Dell
Arizona Daily Star
May 14, 2010

The new Rio Nuevo board will spend two to three more weeks evaluating feasibility projections for a $192 million hotel adjacent to Tucson Convention Center before deciding whether to go ahead and build it. The board spent six hours Thursday listening to reports on the hotel's potential occupancy and market, economic impact and financing.

Keri Silvyn, the board's lawyer, said Rio Nuevo can cancel its contract with developer Garfield Traub if the hotel isn't economically feasible or because of legal roadblocks, and have to pay the developer only for work that has already been done. However, if the board cancels the contract for no cause, it could owe Garfield Traub 60 percent of its remaining fee. The company is supposed to collect 3.5 percent of the total hotel contract if all the work is done. Board Chairman Jeff DiGregorio said he is comfortable with the projections in the three reports. Some board members, however, such as Alan Willenbrock, questioned many of the numbers and assumptions in the reports. Once the financial plan is approved, it will be difficult to pull the plug on the hotel without a large payout to Garfield Traub, because, Silvyn said, "there's some argument you made some acceptance."

Board member Jodi Bain said she wants more information about the legal clauses in the contract before moving ahead, while David Jones said that from his perspective the board wasn't ready to make any approval or acceptance of the financing plan. DiGregorio said one of the reasons he's comfortable with the numbers is that the city's $4.5 million contribution to the project would come from construction taxes for the project that the city otherwise wouldn't have. The capital plan also calls for Rio Nuevo to put up $1.5 million a year and possibly more, and the city would also have to guarantee the bonds with its credit, as well as pledge most of the new taxes generated by the project to make the hotel work. DiGregorio said, "$4.5 million from money you do not have anyway to get $37 million in economic impact, as a taxpayer to me that seems like a good investment." The $37 million is the estimated annual economic impact of the new hotel and an expansion of the TCC. But Willenbrock had a different take. "We're pledging money that doesn't exist yet."
 
RTA to co-manage streetcar with city
Federal agency wanted 'unique' partnership

by Andrea Kelly
Arizona Daily Star
May 14, 2010

The Regional Transportation Authority plans to co-manage Tucson's modern streetcar project and be included in all major decisions on the $182 million project. The management agreement has yet to be formalized between the Transportation Authority and Tucson's City Council, but both parties say it is expected to be included in the contract being written this week. "We wanted to establish that the RTA is definitely a co-partner in this project," said Dan Sullivan, an RTA consultant. Sullivan is writing the contract with Richard Miranda, Tucson deputy city manager. The two said they expect to have most issues ironed out by the end of the week.

This management agreement hasn't been required of any other Regional Transportation Authority-funded projects, but the Federal Transit Administration asked the RTA to partner with the city, and the RTA is the primary investor in the project, said Gary Hayes, executive director of the RTA. "We're the primary investor in the project, and the general attitude of the board is that they want to make sure our investment is protected," Hayes said. "Until the TIGER grant was announced in February, there was a lot of concern about whether the project was going to move at all." (TIGER is a federal grant program called Transportation Investment Generating Economic Recovery.)

Construction was estimated to cost $157 million. The plan was to use federal funds and RTA sales-tax money for construction of the streetcar line from the University of Arizona to Tucson's west side. The revenue sources have included $75 million in RTA sales taxes and $63 million TIGER funding, which comes from federal stimulus money. The additional cost will come from $4.6 million in unspecified city grants, another $25 million in other federal funding, $11 million from utility companies, and $3.2 million from the The Gadsden Co., said Shellie Ginn, Tucson's streetcar project manager. Part of the budget is $14 million set aside for contingency required by the federal government on federally funded projects, Ginn said Thursday. "The FTA is very pleased we are an active partner. This is unique," Hayes said.

The city has to carefully word the contract to make sure it doesn't violate the city's charter for contracts, Miranda said. Tucson officials gave a progress report Thursday to the Regional Transportation Authority Governing Board in response to previous questions about the management, schedule and cost of the project. One concern was the amount of money being used for management of the project. At 18 percent, it seemed high, Hayes said. It's higher than an average road project, but "right on line" with similar transit projects, said Jim Glock, Tucson transportation director.
 
There may soon be more copper mining in metro Tucson's future--in addition to the nearly $1B Rosemont mine proposed to begin next year in the Santa Ritas, Freeport McMoRan has bought 4,000 additional acres adjacent to the shuttered Twin Buttes mine it purchased in January:


Freeport mining company buys 4,000 acres near Sahuarita
By Tim Steller
Arizona Daily Star
May 17, 2010

The plan to add 15,000 homes in a 4,000-acre development west of Sahuarita has apparently died, now that mining company Freeport McMoRan Copper & Gold has bought the land. Mission Peaks 4000 LLC sold the property May 6 for $24 million in cash to Freeport, which had opposed the housing development. Freeport spokesman Richard Peterson had not yet answered questions about the mining company's plans for the site as of mid-afternoon Monday, but Sahuarita Town Manager Jim Stahle said the meaning is clear. "Freeport has indicated no interest at all in having houses there," he said. He called American Nevada's development plans "moot."

In late 2008, the town approved a redesignation of the land in question to allow for residential development, over the objections of Freeport and of some area residents who wondered where the water and infrastructure would come from. In October that year, Lyn Harry White of Freeport, said homes will hamper future mining operations that include blasting and disposal of mine residue in the mounds and ponds of tailings. In January this year, Freeport bought the mothballed Twin Buttes mine, which neighbors the property that American Nevada wanted to develop.
 
With the manufacture of the streetcars to take 27 months, plus six additional months for testing, the City Council's emergency meeting on Monday approved an agreement with the county's RTA to release funds needed to move ahead on a revised timetable, with a tentative opening now set for August, 2013:


streetcarroute2.jpg



Another streetcar delay pushes start date to 2013
by Rob O'Dell
Arizona Daily Star
May 18, 2010

The first run of the planned $182 million modern streetcar will be delayed by another year and a half, and is now scheduled for August 2013 at the earliest. For years, the city said the first run on the street would occur on 11/11/2011. This year, the date was pushed back to early 2012. However, Tucson transportation officials said Monday the first of the streetcars won't be delivered until the end of 2012, and the last ones won't get into town until spring of 2013. Given that the streetcars need at least six months of testing before they can be used, the city now estimates the first public rides will happen in August 2013 at the earliest, said Transportation Director Jim Glock and Streetcar Project Manager Shellie Ginn.

The new timeline was disclosed at a hastily called special meeting Monday, at which the Tucson City Council unanimously approved an agreement with the Regional Transportation Authority that allows the RTA to co-manage the $182 million modern-streetcar project with the city. The council's approval of the intergovernmental agreement clears the way for the city to immediately receive $46 million from the RTA so the city can put in orders for the streetcars and rail lines as well as finish the design for the streetcar. The money can flow to the city once the RTA approves the agreement as well. Councilman Steve Kozachik questioned the new timeline, given that the city was told the project needed to be finished by early 2012 when it received $63 million in federal stimulus money for the streetcar. Glock said the stimulus funding gave credit if the project was to be completed by early 2012 - which Tucson said it would at the time both when it applied for the funding and when it and received it. "We've subsequently learned that's not a requirement," Glock said. "That's not a hard and fast date we have to meet."

The delay is the second major setback for the city since it was awarded $63 million in stimulus money in February. In April, the city announced it was applying for $19 million more in federal money. That's because the price tag jumped from $157 million to $182 million, leaving the city short $20 million to $25 million. The city said the actual cost will come in lower than the $182 million estimate by a federal oversight consultant. Even if it gets the $19 million, the city would still be $6.5 million short of the federal estimate. And at the higher cost, the city and the RTA will have have no money for operating the modern streetcar, which would connect the University of Arizona to downtown and the west side.

Mayor Bob Walkup pushed the rest of the council for the special meeting, which occurred just a day before the regularly scheduled meeting today. He said he thought the streetcar would be substantially completed in early 2012, around the state's centennial on Valentine's Day - despite the fact the city predicts it won't even have the streetcars in town by then. Walkup said the city needed to have the special meeting on Monday and not wait until today because the streetcar contract couldn't wait. "We've been waiting for months," Walkup said. "We're ready to go. Let's go." Councilman Paul Cunningham, who didn't speak at the meeting, said afterward he voted for the intergovernmental agreement to move the project forward because it didn't make sense to hold up the agreement and wait another month for the $46 million to come from the RTA. The city needs the RTA money because it won't get the federal stimulus money until 2011. RTA Executive Director Gary Hayes said the RTA board will hold a special meeting soon to approve the intergovernmental agreement. He said the RTA wants to move forward quickly so the city can order track and the streetcars, which have long lead times.

Kozachik said agreeing to co-management with the RTA, which the city and the RTA have not done on any other projects, was about "kick-starting the cash" for the streetcar. He asked City Attorney Mike Rankin if the RTA and the city were at loggerheads without this agreement, and Rankin said yes. Several council members including Kozachik, Regina Romero, Karin Uhlich, Shirley Scott, and Richard Fimbres questioned who would actually be in charge if there were co-managers of the project. Rankin said when push comes to shove, the city has final approval, but noted that the RTA has the cash. "The whole concept of co-management is unique to this project," Rankin said. "Fundamentally the RTA's authority in this is cutting the checks."
 
Can someone tell me why they are talking about financial risk now when they knew that the Sheraton hotel would be considerably expensive years back? I mean didnt they see this whole dilemma back before all the design and pre-construction stuff happened.
 
Can someone tell me why they are talking about financial risk now when they knew that the Sheraton hotel would be considerably expensive years back? I mean didnt they see this whole dilemma back before all the design and pre-construction stuff happened.

I don't think there was ever any doubt that a new convention center hotel wouldn't require publicly-backed financing, as has been the case across the country for the past few decades. The difference now, however, is that there have been some significant shifts in the political and economic climate over the past few years that are demanding a closer analysis of that arrangement and its associated risks.


1. Political changes When the state decided to take control of the long-mismanaged Rio Nuevo TIF district last year, it shifted the whole direction and focus of the project, requiring a much higher level of transparency and accountability. Although a new board is now in place and preparing for an upcoming financial audit of prior expenditures, all decisions going forward are under a microscope, and they are undoubtedly feeling the pressure of high dissatisfaction with Rio Nuevo's past performance and the need to be conservative in committing the district's limited resources to the projects mandated by the state. (Currently, there are insufficient TIF revenues to cover any costs of the convention center expansion and new hotel.)


2. Economic changes With a robust economy and revenues projected to rise, municipalities have less concern about issuing publicly-financed bonds for civic projects such as convention centers and their hotels. However, as this deep recession has required unprecedented budget cuts and the prospects for any immediate recovery rather questionable, the timing for the city to be adding significant potential risk and liability could hardly be worse. Additionally, the financial projections of hospitality consultants HVS are being questioned, as many of their revenue estimates for projects in other cities have not panned out. (Listen to this informative four-part interview from a local radio station).

As with so many things, timing is crucial, and with the current storm clouds on the horizon, the city council may decide that financing the convention center expansion and new hotel may be too much to take on at the moment. Unfortunately, that decision will only keep the TCC as a small and outdated facility that cannot compete for future convention business--a mostly empty white elephant that continues to lose money.
 
Last edited:
City agrees to negotiate sales of warehouses to WAMO
by Teya Vitu
Downtown Tucsonan
May 18, 2010

The city will negotiate to sell three Downtown warehouses to partnerships headed by the Warehouse Arts Management Organization. These include the Steinfeld Warehouse, 101 W. Sixth Ave., which artists occupied until the Arizona Department of Transportation evicted them in 2006; and the adjoining warehouses at 191 E. Toole Ave. (occupied by Skrappy’s) and 197 E. Toole (occupied by the Toole Shed Artists Cooperative). The City Council on May 18 also approved negotiating with WAMO to become the master leaseholder of the 1929 Citizen’s Warehouse, 44 W. Sixth St., where Bicycle Inter-Community Art and Salvage is the primary tenant. WAMO would lease Citizen’s for $5,000 per year. All these warehouse deals follow the goals of the 2004 Tucson Historic Warehouse Arts District master plan. It was that plan that created WAMO, which has goals to keep affordable arts spaces in the warehouse district even as other warehouses are sold to the private sector. “We want to make sure some of the buildings stay in with nonprofits so we continue to have affordable arts spaces,” WAMO President Marvin Shaver said.

WAMO offered $250,000 for the Steinfeld Warehouse. Shaver said prior Steinfeld tenants will be invited to return and eight residential units may be built into the 1907 warehouse. WAMO entered into a nonprofit joint venture with Toole Shed Artists Collaborative and Skrappy’s to form Toole Shed LLC, to purchase, develop and operate the blue warehouse at 197 E. Toole. Toole Shed LLC offered $160,000 for the 1947 structure. Next door at 191 E. Toole, Skrappy’s/Tucson Youth Collective offered $91,000 to buy the 1927 warehouse the youth center has occupied since 2008.

The partnerships of both warehouses will collaborate to create a viable entrance to the arts district. Shaver said there are plans to build a retail store at the front of the Skrappy’s building and an art gallery at the front of the Toole Shed. Peach Properties, which bought the warehouses at 1 E. Toole and 119 E. Toole, will manage the Citizen’s, Steinfeld and 197 E. Toole properties. Shaver said the Tucson Industrial Development Authority will lend money to purchase 197 E. Toole and will assist on Steinfeld. The International Sonoran Desert Alliance is an active player in all the properties for planning and securing financing.
 
Town West's option has expired to buy a city-owned parcel for their El Mirador project proposed in 2007, undoubtedly due to a lack of financing for the high-end condo/hotel development:


ElMiradorhotel-condorender.jpg

Rendering of the proposed El Mirador development
(render: Town West)


DOWNTOWN DELAYS
by Jim Nintzel and Dave Devine
Tucson Weekly
May 20, 2010

The City of Tucson and its Rio Nuevo project have been stung by plenty of criticism over giveaway development agreements for downtown projects that never materialized. Way back in 2007, when he was still running Rio Nuevo, Greg Shelko told the Tucson Citizen: "We will be more rigorous with our management to make sure they conform to the terms." A few months after Shelko made his vow, the City Council approved a development agreement for the El Mirador project on a city-owned lot at Stone Avenue and Franklin Street. The final plan called a high-rise complex that would include a hotel, condominiums and various commercial uses. The city was supposed to sell the land to Town West Design Development for $700,000 within 21 months, and both sides had performance obligations spelled out in the agreement.

Almost 30 months later, the city still owns the vacant parcel, and neither side appears to have lived up to its end of the bargain. Downtown watchdogs are now chattering about what happens next. City Attorney Mike Rankin says diplomatically: "The time frame for performance has expired, but technically, the agreement hasn't." Jim Horvath of Town West says the development agreement remains in place, and "we're working on different aspects of the project. ... We're working to make it more economically viable. Student housing is one possibility." Councilwoman Regina Romero said she wasn't impressed when that option was presented to her some time ago. Horvath says that selling any residential project on the site will be difficult as long as train whistles continue to ring out from nearby crossings. While the city has talked about a silent zone along the downtown tracks for some time, not much progress has been made.
 
UAScienceTechnologyPark.jpg

A four-story hotel will be joining the current 40 tenants at the UA Science and Technology Park.
(photo: UA Tech Parks)


Tech Park hotel on way
Bonds authorized; construction could begin early in 2011

by Dale Quinn
Arizona Daily Star
May 20, 2010

A hotel at the UA Science and Technology Park on Tucson's southeast side could be under construction at the beginning of next year. The Tech Park, 9070 S. Rita Road, has been authorized to sell $23 million in bonds to pay for the project, though the actual construction cost could be lower, said Bruce Wright, associate vice president of University of Arizona Research Parks. Sales on the bonds could begin in October, subject to final approval from the Arizona Board or Regents, Wright said. Designs call for the hotel to have four stories, roughly 130 rooms and 8,000 square feet of conference space. Wright said Tech Park officials are in final negotiations with a major hotel brand, but he could not disclose the name because of confidentiality agreements. The brand would operate the hotel for the Tech Park but wouldn't own it. Securing a major brand name was an important step, Wright said: "It really enhances the economic feasibility of the hotel."

While the bond money was designated more than a year ago, Tech Park officials were waiting for the bond market to improve and hotel occupancy rates to increase. Low construction costs also provided incentive to move forward on the project, Wright said. Discussions are under way with a contractor to finalize the design phase and settle on a maximum price to determine how many bonds need to be sold. Wright said tenants at the Tech Park initially sparked interest in having a hotel there. "We've been here for 15 years working closely with our tenants and they have repeated that it would be advantageous to have a hotel on or near the Tech Park," he said.

The hotel will target business travelers and provide amenities for guests requiring an extended stay. Many of the companies at the Tech Park have international customers and management teams flying in from overseas, said Sandra Garcia, a spokeswoman for Dilas Diode Laser Inc. As a German-based company, Dilas often has managers visiting who need a place to stay and there aren't too many options on the southeast side, Garcia said. She said closer accommodations for those managers and any international clients will make it easier to conduct business. "If it really pans out the way it's planned, it should be great for the park," Garcia said.
 
More details on the new Casino del Sol Hotel & Convention Center now under construction:


PascuaYaquicasino.jpg
SolCasinosHotelConventionCenter.jpg

The new 10-story hotel tower and conference center at Casino Del Sol in Tucson.
(renders: Leo A Daly)


Here Comes the Sun
Pascua Yaqui Tribe Starts Work on Sol Casinos Expansion

By Alan M. Petrillo
Southwest Contractor
May 01, 2010

The Pascua Yaqui Tribe in Southern Arizona is expanding its Casino Del Sol in Tucson with a $98-million Sol Casinos Hotel and Convention Center. The Pascua Yaqui tribe chose Leo A Daly to design the new 10-story hotel tower and conference center at Casino Del Sol in Tucson. The tribe worked with both the architect and project general contractor McCarthy Building Cos. on the original phases of the casino complex. The Pascua Yaqui tribe chose Leo A Daly to design the new 10-story hotel tower and conference center at Casino Del Sol in Tucson. The tribe worked with both the architect and project general contractor McCarthy Building Cos. on the original phases of the casino complex.

The expansion will add 215 luxury hotel rooms and a conference center that will be able to accommodate 1,500 people in performance and theatrical configurations or up to 800 for dining upon opening in fall 2011. In addition, the facility will feature a fine-dining steakhouse with seating for up to 100 people; an international buffet with seating up to 250; lobby lounge and bar; exercise facility with full-service spa; outdoor pool and sundeck; and 1,120 car, multilevel protected parking structure. Construction started in March with McCarthy Building Cos. of Tempe as general contractor. Leo A Daly of Phoenix is the project architect.

Kurt Nyberg, McCarthy’s project manager, says the project consists of four major components — the 10-story, cast-in-place concrete, post-tensioned hotel tower; the cast-in-place parking garage, with approximately 90,000-sq-ft per floor and three floors above ground and one below; the single-story steel construction convention center with a 14,000-sq-ft ballroom; and a warehouse and laundry facility on a single level of approximately 15,000 sq ft. “The challenge to this project is the multiple phases, building the significant major components and working around the existing facility without interrupting any operations,” Nyberg says. “The expansion abuts the existing casino and makes a seamless transition between the two.”

Nyberg adds that one of the differences in working with a tribe is the existence of the Tribal Employment Rights Office. “It’s our obligation to benefit as many in the tribal community as possible, and the focus of our team is to involve as many qualified tribal members in construction jobs throughout the trades,” he says. Nyberg points out that McCarthy has worked on a number of tribal projects, including those for the Sandia Pueblo and Santa Anna Pueblo in New Mexico and the San Carlos Apaches in Arizona.

McCarthy also built the previous phase, the $70-million Casino Del Sol, in 2001. The project was notable for its simulated sky above the casino interior. Wendell Long, chief executive officer of Sol Casinos, says the tourism slowdown after Sept. 11 led the tribe to postpone building the expansion until now. “We’ve thought out every element of this project many times, and it’s nice to have both McCarthy and Leo A Daly working on it,” Long says. “They’re both familiar with the project, know us and have some of the same people still working for them who worked on the first project a decade ago.” An advantage to working with tribes, Long points out, “is that tribes have good cash flow because of the casinos, which builders like because they know they will get paid.” Amy Clark, vice president and director of operations for Leo A Daly, says tribal projects are interesting architecturally. “The gaming projects have casinos, restaurants, bars, public and private spaces,” she says. “In a way, they’re small cities, which makes them great projects to work on. It’s also fulfilling to work with the tribal members.”


Useful Sources:

Visit www.casinodelsol.com

Key Players:

Owner: Pascua Yaqui Tribe
Architect: Leo A Daly
General Contractor: McCarthy Building Cos.
Engineers: Landa & Associates; PK Associates; Taylor Rymar Corp.; Wood, Patel & Associates
Landscape Design: Sage Landscape
 