Tucson Development Thread


Why doesn't TEP just buy out the area where the post was supposed to be built and put their headquarters there? You could have ground floor retail or something. Leave the Santa Rita as is....fix that bad boy up. The post is just wasted space and it's in a space that you could probably build a taller building (13 floors too much?). Also, you can use that space where the volvo dealership used to be on broadway. Make that a nice 8-9 story tower heading into downtown.
 
There is also that very long space right next to the County Building that could be made into something. I wouldn't mind seeing a broad 20 story building that tapers near the top. It's weird though that as many parking lots as there are downtown, there doesn't seem to be enough space to work with. Unless they destroy something.
 
A dressed-up five blocks on S. Scott Ave. reopen tomorrow, featuring wide sidewalks, new landscaping, lighting, and benches, and some interesting artwork:


ScottAveGriffin.jpg

A statue in the shape of a griffin is on a pedestal in the construction site
on South Scott Avenue and East Ochoa Street on Tuesday.
(photo: A.E. Araiza)


Downtown Tucson's newest public art: A 12-foot orange griffin
ARIZONA DAILY STAR
05.19.2009

A 12-foot-tall griffin is the artistic centerpiece for the city’s total overhaul of South Scott Avenue. Most of the estimated $6.1 million for the project — including $31,500 for the orange steel griffin — came from the Rio Nuevo downtown redevelopment project, with Tucson Water kicking in a portion of the cost. The griffin, a mythological half eagle-half lion creature, has red lights in its rib cage, which will turn on when the streetlights turn on. It highlights a street improvement that includes wider sidewalks, a narrower street, upgraded utilities, lighting and benches for pedestrians, and a number of other artistic elements along the stretch between East Broadway and Fourteenth Street.

Local artist Joe O’Connell made the sculpture. He owns the Tucson company Creative Machines Inc. and has also made public art for the Wheeler Taft Library in Marana. The road is scheduled to open Wednesday. The griffin will be officially unveiled at 6:30 Wednesday on Scott Avenue at Corral Street.
 
Looks like the Santa Rita is coming down according to today's Daily Star:


PERMIT TO DEMOLISH IS ISSUED

The city has issued a permit to demolish the Santa Rita Hotel, a longtime Downtown landmark. The permit was issued late Monday, said Development Services Director Ernie Duarte, and it is good for 180 days. BCS Enterprises Inc. of Mesa was the applicant for the demolition permit. BCS is tearing the building down for owner Humberto Lopez of HSL Properties. Lopez and representatives of Tucson Electric Power, which is considering the site for a new office building, confirmed last week that there is a sale contract for the property, which has been vacant for more than three years.
 
what is the significance of the griffin? It seems sort of random...

...they figured $2M+ for a flying jellyfish was too much to spend. ;)

Griffins are often thought to be protectors and guardians, so maybe it will protect the city from the influence of that menacing mythical bird to the north....who knows.
 
Thanks for the clarification on the Santa Rita--even perusing some marketing photos taken by the hotel a few years back, it certainly looks as though parts of the structure predate 1972.

And speaking of Henry Trost, it was only a few years ago that I discovered that my grandparent's former long-time residence in Bisbee was a Trost design, which was thankfully bought and restored by architectural restorer/sculptor Rob Boucher (http://www.rwboucher.com/Portfolio01/index.html), who has also worked on numerous projects in Tucson and southern Arizona.

That's really cool. Trost's houses are always so distinctive. I love the ones on University and around downtown.

Sadly it looks like the Santa Rita is doomed. I'm really disheartened that there was not so much as a wimper about its loss from preservationists or in the public. The press coverage has been rather lacking or downright misleading. I sure hope this does not turn into another Post fiasco where the site will lay vacant for years and years. There were significant buildings on that site too but they had false facades covering up the original designs. There was little notice of this fact in the press and of course not by the developed until they were tumbling down.

Its typical that the city goes and spends so much fixing up Scott Ave and then turns around and immediately allows the demolition of one of the most historically and architecturally (if restored) significant buildings on the street!!! :koko:
 
Unfortunately, most of the people in Tucson aren't giving two Shyts about the Santa Rita Hotel. It's been sitting isolated for a long long time. The second they mentioned possible restoration, it seemed like they had no money to do so. No real effort was made to save this Hotel. While I would have loved to have seen this hotel saved....a new building would be nice for downtown. If TEP was smart...they'd make this building fairly tall and stunning. If this thing turns out to be a bland building, there will surely be an uproar.
 
Two new UA dorms will house 1,000 students
Posted: May 21, 2009 08:52 PM
Updated: May 21, 2009 08:52 PM
Posted by Brian White (KOLD)

The construction of new residence halls at The University of Arizona will result in more than 1,500 jobs and will generate more than $13 million in tax revenues, according to an analysis by the UA Economic and Business Research Center.

The $116 million project will provide on-campus housing for more than 1,000 students when the halls open at the beginning of the fall 2011 semester.

Two new residence halls will be built along Sixth Street - one at Euclid Avenue, south of Coronado Hall, and the other at Highland Avenue, north of Apache-Santa Cruz Hall.

The project is expected to have a direct employment impact of 1097 jobs, which are expected to last one year. Direct jobs are positions that are primarily spent working on the design, engineering and construction. An additional 294 indirect jobs - in areas such as warehousing, transportation and other areas - will be created.

"When these workers spend their incomes in the state, they generate another 430 (construction) jobs," said Alberta H. Charney, UA senior research economist and author of the report.

The construction project will generate more than $93 million in labor income and more than $214 million in sales revenue - once indirect and induced impacts are considered.

A summary of total impacts for jobs, labor income and sales revenue is below:

* Direct Impact: 1,097 jobs; $59,132,940 in labor income; and $116,000,000 in sales revenue.
* Indirect Impact: 294 jobs; $12,962,064 in labor income; and $32,832,235 in sales revenue.
* Induced Impact: 571 jobs; $21,505,022 in labor income; and $66,163,302 in sales revenue.

According to the report, construction and design spending and salaries will generate additional tax revenue that will benefit city, county and state government, and communities outside of Tucson.

Nearly $2.7 million in direct tax revenues are expected to flow to the state of Arizona and more than $1.1 million will go to the city of Tucson. Pima County, the Pima Regional Transportation Authority and other cities and counties will receive additional tax revenues through construction of the residence halls.

A summary of direct, indirect and induced tax revenues is below:

* State of Arizona: $9,035,552
* City of Tucson: $1,988,522
* Pima County: $1,087,680
* Pima Regional Transportation Authority: $480,763
* Other Arizona Counties: $236,239
* Other Arizona Cities: $672,239
* Maricopa Association of Governments: $23,818
* Pima Association of Governments: $7,940

"Our efforts to stimulate the local economy are evidenced by the economic impact this project will have on the local community,' said Joel Valdez, UA senior vice president for business affairs.

Students, especially those who are new to the UA, will benefit from the significant expansion of the availability of on-campus housing.
 
what is the significance of the griffin? It seems sort of random...


Not to beat a dead bird, but from today's Daily Star, here's the artist's logic behind the griffin:


The 12-foot high, sparkly orange griffin that's perched on Scott Avenue Downtown is no newcomer to Tucson. He belongs there. In fact, says the artist, Joe O'Connell of Creative Machines Inc., the griffin is a sort of reincarnation of one of the four griffins who once guarded the 1901 Carnegie Library, which is now the Tucson Children's Museum. When the library burned in 1941, its half-eagle, half-lion griffin guardians were destroyed — except that in O'Connell's version one griffin bounded to the ground and fled.
 
University construction projects in jeopardy
Arizona Daily Star
THE ASSOCIATED PRESS
05.26.2009

PHOENIX — Although Arizona’s university system got approval to use state Lottery money to pay for $1 billion in construction projects, shovels have yet to hit the dirt and uncertainty about the state budget has caused many delays. That means students and faculty may have to endure worn-out facilities, while the universities can’t expand certain programs or keep up with enrollment growth for a while. “Everything is on hold,” said Joel Valdez, senior vice president for business affairs at the University of Arizona in Tucson. The same is true for Northern Arizona University in Flagstaff, while Tempe’s Arizona State University has only a small number of “critical-need” projects under way.

The Lottery-funded construction program, billed as a way to jump-start the economy, was signed into law about a year ago. The program includes classroom renovations and a new construction school at ASU, and an expansion of the UA medical school in Phoenix. The program is intended to generate several thousand jobs and has the backing of business and political leaders. But the program has run into challenges. Tension first surfaced last fall when a state legislative committee refused to review $167 million in construction projects, a required first step, citing concerns about spending large amounts when the economy was crashing. Some legislators wanted to preserve Lottery funds in case the state needed to shore up budget deficits.

While the committee later approved the projects, the state budget crisis caused university officials to hold off issuing bonds to cover construction costs. The officials are waiting until the 2009-10 budget is finalized because a pair of bills in the state Legislature could impact their spending authority and the amount of Lottery funds available. A Senate bill would eliminate the program, except for about $167 million in already-approved projects. A House bill would continue to use increased amounts of Lottery funds to help the state’s budget deficit. Passage of the House bill would affect how much universities get because they are last in line to receive Lottery funds, behind state services such as parks and transportation.

Lottery funds are due to start flowing to the universities in fiscal 2010. “Next year is going to be a tough one to predict,” said Karen Emery, deputy director of the Arizona Lottery. She said last year’s Lottery sales totaled $473 million, and Lottery officials expect to finish the year about 2 to 2› percent ahead of last year. An ASU projection shows the university system was anticipating $10.8 million in Lottery money for fiscal 2010, increasing to $33 million the following year. To fund the projects, the universities would issue bonds and cover 20 percent of debt service through university revenues. The state would pay the other 80 percent.

Members of the Arizona Board of Regents, which oversee the universities, remain hopeful. “But we’re also realistic,” said Ernest Calderon, incoming regents president. “We understand there are significant budget challenges ... We’re keeping (construction projects) on the back burner with the hope there will be some sort of breakthrough that will allow us to move ahead.” A handful of projects that aren’t part of the program are under way. They include two residence halls at UA and a $120 million complex for honors students at ASU.
 
TCC Sheraton Details

If built according to drawings in the Concept Design Agreement submitted to the city last month, the new TCC Sheraton will feature the following:


- 26 stories, with the penthouse/top floor jutting out over the lower floors with a large bar, including some outside seating (should become a popular place for drinks, with some of the best views in town).

- building height will be 274'--second highest in the city after the 330' UniSource Tower, and slightly taller than the 262' Bank of America Plaza.

- the "stone" facade on the south side of the hotel will actually be precast concrete panels of different shades with punched window openings.

- the hotel will be connected to the newly expanded convention center at numerous places, including a new 1,160-stall parking garage on the south side.

Granted, it's not the most striking design, but with a variety of textures and finishes, and hopefully without any mechanical structures poking above the roofline, it should be an attractive convention hotel (and heaps better than Phoenix's "Gumby Tombstone"). ;)


http://www.ci.tucson.az.us/rionuevo/docs/HotelConceptBook_FINAL.pdf
 
Are there any renderings with the hotel in the context of the other downtown buildings, like a skyline rendering?

Also...I always forget that you guys are getting a streetcar, the map on page 10 reminded me. When is service expected to begin? Hasn't construction already started?
 