Tucson Development Thread


courthouse.jpg


Whoever suggested building the thing above I seriously question your architectural taste :). That is a Federal courthouse planned for downtown Salt Lake City where it has earned the fitting nickname "The Borg Cube." Many of us in SLC would rather see it built elsewhere as it has atrocious street interaction (its more of a concrete fortress at street level, I guess we have Oklahoma City bomber types to blame for that), plus it is replacing a couple of our most beloved historic buildings, and we have few left.

I like Tuscon and agree that it has loads of potential. Cool compact downtown, narrow pedestrian friendly streets, and plenty of historic architecture to see. I'd live in Tuscon any day over Phoenix.
 
Finally, a render and construction photo of the new Fire Dept. headquarters being built at Cushing and Granada near the convention center. The current headquarters will subsequently be remodeled into a new space for Tucson MOCA (Museum of Contemporary Art).


FireStation-render.jpg
FireStation-constr-1.jpg

(render: WSM Architects; photo: Benjie Sanders)



About 150 construction workers are building Fire Central
ARIZONA DAILY STAR
03.12.2009

About 150 people are working today to build Fire Central, the Tucson Fire Department's new headquarters Downtown. That number includes workers for Sundt Construction, the general contractor, and those working for 19 subcontractors, says Sundt spokesman Charlie Boyd. The contract value to Sundt is $29.7 million, he says. The 65,000-square-foot structure, going in on the south side of Cushing Street near Granada Avenue, is scheduled to be finished in September.
 
Last edited:
The design of the convention center Sheraton gets one more tweak before final approval by the City Council:



TCC-Sheratonrender3.jpg

The newest feature proposed on the downtown Rio Nuevo hotel
is a wedge-shaped bar and restaurant on the 26th floor.
(render: DLR Group)



Modified downtown hotel would have rooftop restaurant
By Nicholas Smith
Inside Tucson Business
March 13, 2009

A wedge-shaped rooftop bar and restaurant would crown a 26-story, 525-room downtown hotel under a revised proposal. The modified plan was unveiled March 9 by architects and city officials at the final public meeting on the project. Construction of the Sheraton-branded hotel would be coupled with an expansion and remodeling of the Tucson Convention Center. The hope is to begin construction early next year. Initial estimates for the project were $150 million but Rio Nuevo Director Greg Shelko said the ultimate cost will be determined by the Tucson City Council. “The goal is to build the biggest hotel that we can afford,” Shelko said, adding that he expected a cost estimate to be ready March 23.

City leaders maintain the shift of priorities downtown toward construction of revenue generating projects, such as the hotel and an arena, will spur subsequent growth and development because it will give people a reason to go downtown. The site for the planned hotel is near the corner of Congress Street and Granada Avenue. If all goes as planned on the funding side, the project should break ground in early 2010 and be completed by June 2012, about the same time as remodeling of the convention center should be finished. A four-story parking garage, capable of holding 1,000 vehicles, is also planned. It would be built on the west side of the convention center in what is now a parking lot.

Like other projects planned for downtown, construction of the hotel and convention center improvements could be jeopardized by state legislators’ threats to pull revenues coming from state sales taxes in the Rio Nuevo district. Funding for the Rio Nuevo downtown is ultimately still in the Arizona Legislature’s hands. As the state looks to shore up a $3 billion budget shortfall, the sales tax money designated for downtown revitalization could be taken away. Much of the funds come from a tax increment financing model, which gives Tucson a certain cut of the sales tax generated by local businesses. About $55.5 million has already been collected by Tucson since the funding began in July 2003. If the money does get cut, it will likely mean the end of the hotel, convention center expansion and the arena projects. Several options of keeping the funding in place have been discussed, including establishment an oversight committee that would keep tabs on how the money is used.
 
Last edited:
I like the idea of a rooftop spot for the public or guests to patronize. Though on a small scale, I think it would be a positive additional draw to downtown Tucson, especially in the evenings. Much like the Compass Room here in Phoenix (though obviously, it has the added sparkle of also being a rotating restaurant).

Side note: Considering this hotel's urban/downtown location, I'm not a fan of those large street level setbacks. But overall, it is a decent design.
 
I love the design concept of this building. The top floor bar and restaurant is a great idea with Tucson's beautiful natural surroundings. Oliveurban is correct that it would be a draw to downtown. Downtown is in dire need of a new hotel and new addition to its skyline. I can only hope that this gets built.:fingerscrossed:
 
I just don't understand the concept of something like this being built with public money. Perhaps in these times, a LOAN of public money could be required, but not the public as developer putting its own money at risk. It seems to me if there's a market for something like this, a private hotel developer should want to build it with financing he arranges. If not, how does an empty or underutilized hotel stimulate downtown activity?

I've lived near Tucson part of the year for 7 years now and what I keep seeing and hearing is a determined resistance to building high density housing near downtown which is the one thing that could revive it. You don't get an active downtown by having an arena here and a science center there, all of which are driven to and from by the overwhelming number of users. You get an active downtown by having people living there and using nearby shopping, restaurants and so on--that they can walk to.

Which brings up my agreement with oliveurban. If they want this hotel to contribute in any way to downtown life, design it more to invite people to walk outside to a nearby business. As it is, it is designed to facilitate what most people will do--drive their rental car from the airport into it's underground garage, attend the convention or meeting they came for and drive back out again, never seeing downtown Tucson.
 
^There are relatively few cities where private developers are willing to finance a convention center hotel. In truth, most of them know that if a city wants such a hotel bad enough, they'll end up financing it themselves or at least cough up huge subsidies to a developer, believing those extra rooms are essential to attract more business and make their expensive convention center expansions pay off. And that scenario has played out in numerous cities across the country, including Phoenix, Baltimore and Denver, with Dallas and Portland currently debating the issue. (Apparently, Portland has been waiting for a new convention center hotel since 1989.)

Politicians generally love these big projects, as new convention centers and hotels are often touted as an economic panacea for moribund downtowns and a way to improve their city's visibility and image. However, statistics suggest that such publicly financed projects are often money losers, in spite of these municipalities' own financial projections to the contrary. This financing dilemma is particularly challenging for second- or third-tier cities that have rather meager dining, entertainment, and other attractions near their convention centers, as the repeat business is crucial to their success. (I'm sure more than a few conventioneers that end up wandering around Phoenix' downtown are asking themselves "Is that all there is?" And at this point, Tucson's downtown has even less to offer.)

Of course, Tucson officials have been naively optimistic about how quickly downtown can be revitalized. If Rio Nuevo were being built according to plan, the cultural plaza west of I-10 with its numerous museums and attractions would all be up and running by the time a new arena, hotel, and convention center expansion were finished in 2012, surrounded by new condos, apartments, restaurants, retail stores, and a vibrant street scene, all connected by expanded mass transit. In actuality, such massive redevelopment generally takes many years--if not decades--to achieve, even in the best of economic conditions and with the most visionary and competent leadership.

Tucson is further challenged since it has few corporate headquarters or regional offices, meaning an unusually small number of employees in the downtown area that would attract more residential development. As has been discussed before, it's a chicken-and-egg conundrum between an urban center's amenities and a sufficient number of residents to support them--and at this juncture, downtown Tucson has precious few of either.

The one ray of hope I see in this picture is the new streetcar line, which will actually pass right by the new TCC hotel (assuming both projects get built). Then, at least conventioneers and locals could hop on the train to visit the new mercado at the west terminus, or head east to the clubs on Congress St., the shops on 4th Ave., or perhaps a ballgame at the UofA. And hopefully, developers will be offered adequate incentives to build more TOD along the whole route, creating some semblance of density and a more urban vibe. But knowing Tucson, that could take a long, long time.
 
Last edited:
The design of the convention center Sheraton gets one more tweak before final approval by the City Council:



TCC-Sheratonrender3.jpg

The newest feature proposed on the downtown Rio Nuevo hotel
is a wedge-shaped bar and restaurant on the 26th floor.
(render: DLR Group)



Modified downtown hotel would have rooftop restaurant
By Nicholas Smith
Inside Tucson Business
March 13, 2009

A wedge-shaped rooftop bar and restaurant would crown a 26-story, 525-room downtown hotel under a revised proposal. The modified plan was unveiled March 9 by architects and city officials at the final public meeting on the project. Construction of the Sheraton-branded hotel would be coupled with an expansion and remodeling of the Tucson Convention Center. The hope is to begin construction early next year. Initial estimates for the project were $150 million but Rio Nuevo Director Greg Shelko said the ultimate cost will be determined by the Tucson City Council. “The goal is to build the biggest hotel that we can afford,” Shelko said, adding that he expected a cost estimate to be ready March 23.

City leaders maintain the shift of priorities downtown toward construction of revenue generating projects, such as the hotel and an arena, will spur subsequent growth and development because it will give people a reason to go downtown. The site for the planned hotel is near the corner of Congress Street and Granada Avenue. If all goes as planned on the funding side, the project should break ground in early 2010 and be completed by June 2012, about the same time as remodeling of the convention center should be finished. A four-story parking garage, capable of holding 1,000 vehicles, is also planned. It would be built on the west side of the convention center in what is now a parking lot.

Like other projects planned for downtown, construction of the hotel and convention center improvements could be jeopardized by state legislators’ threats to pull revenues coming from state sales taxes in the Rio Nuevo district. Funding for the Rio Nuevo downtown is ultimately still in the Arizona Legislature’s hands. As the state looks to shore up a $3 billion budget shortfall, the sales tax money designated for downtown revitalization could be taken away. Much of the funds come from a tax increment financing model, which gives Tucson a certain cut of the sales tax generated by local businesses. About $55.5 million has already been collected by Tucson since the funding began in July 2003. If the money does get cut, it will likely mean the end of the hotel, convention center expansion and the arena projects. Several options of keeping the funding in place have been discussed, including establishment an oversight committee that would keep tabs on how the money is used.

Did I hear 26 stories? and the top will be a restaurant? Wow......they better build this. This project is raising more and more eyebrows. So if there is a restaurant at or near the top what are we looking at as far as height for this building. I would like to see this bad boy top 350FT. Design is a whole lot better than from a couple of years ago. Build it!:tup:
 
Did I hear 26 stories? and the top will be a restaurant? Wow......they better build this. This project is raising more and more eyebrows. So if there is a restaurant at or near the top what are we looking at as far as height for this building. I would like to see this bad boy top 350FT. Design is a whole lot better than from a couple of years ago. Build it!:tup:

Using the downtown Phoenix Sheraton for comparison, it tops out at 360' with 31 stories (per SSP's Phoenix diagram). So if the Tucson Sheraton will be five stories less, and using approx. 9-10' per floor, it will probably be in the range of 310-320'--not a new tallest for Tucson, as the Unisource Tower is 330'.

Of course, the City Council could ultimately choose to build less than 26 stories, depending on the architect's final cost estimate. And if the legislature decides to kill Rio Nuevo's funding--end of story.
 
It doesn't have to be a new tallest...but somewhere near 325' would be suffice to me. And given it's standout design for a downtown building. I would be happy to see this built. Besides this thing fluxuated between 30 stories to a scaled down 23 story version and now it's back up to 26 stories. I just want to see it built.
 
^ agreed. who really cares about a new tallest (though would be nice and not that hard to do lol) when tucson hasn't had a new tall building since friggin' 1986!!! still, i'd be very surprised if anything ever gets built in tucson again. ever.
 
MissionGardensWall.jpg

Leonardo Enriquez, foreground, of Cox Masonry lays bricks at the project site for Mission Gardens
on the bank of the Santa Cruz River. The gardens will be part of the replication of the Mission San Agustín
complex, an important part of Rio Nuevo's projects on the west side of Downtown.
(photo: James Gregg)


Rio Nuevo's mission gardens on the way
By Rob O'Dell
Arizona Daily Star
03.17.2009

What is it?
Mission Gardens is an agricultural area along the bank of the Santa Cruz River associated with the Mission San Agustín — Tucson's cultural birthplace. Rio Nuevo is re-creating the gardens as part of its replication of the mission complex, which included a two-story convento, a granary and other buildings.

What will it cost?
The estimated cost is $3 million, to come from Rio Nuevo funds.

When will it be done?
The project was originally slated for completion in 2010, but city officials now believe it will be done within months.
 
A 50% drop in TIF revenues and threats from the state legislature have forced city officials to focus their Rio Nuevo efforts solely on the convention center expansion, hotel and arena. (Also, Tucson state Rep. Frank Antenori has promised to derail Rio Nuevo completely if they try to spent TIF monies on anything else.)

The planned streetcar will probably extend to the Mercado District, but without any museums, cultural plaza, or convento on the horizon, it looks like the lone attractions at the western terminus will be the nearly completed Mercado San Agustin and perhaps the mission gardens. Quite an about face from just a few months ago.



Tucson Origins museums put on hold due to spiraling economy
by TEYA VITU
Tucson Citizen
03.18.2009

Dreams of celebrating the state centennial in 2012 with a collection of Tucson Origins museums have collapsed with the downward spiraling economy. All intentions to build Mission San Agustín, a University of Arizona Science Center/Arizona State Museum, Arizona History Museum and Tucson Children's Museum on the West Side have been delayed indefinitely, City Manager Mike Hein said. "It's not in my interest or desire to stall on this," Hein said. The worldwide economic straits have cut Rio Nuevo tax increment financing in half and made city leaders choose how to proceed with downtown revitalization.

The City Council in February told Hein to focus on the Tucson Convention Center expansion, a TCC hotel and a new Tucson Arena. They made no specific pronouncement about Tucson Origins, but UA President Robert N. Shelton the same day suspended work on the science center, which had been set to start in summer. "The science center goes to the back burner," Rio Nuevo director Greg Shelko said. "So does all that other work (with the other museums). They are not projects we can do today. What museums we are going to build and when we are gong to build them, that is a conversation for another day." In the next week, the city should receive the pro-forma report from Garfield Traub Development and DLR Group describing how large a revenue bond the the anticipated TCC Revenue could support. "Until we know how or when or if a hotel can be financed, it's hard to make other investment strategies," Hein said.

Annual Rio Nuevo tax increment financing has plummeted from a peak $16 million in 2006 to the present $8.6 million. The city issued an $80 million TIF-backed bond in December, already reshuffled the spending priorities once and now is reassigning those funds again, largely toward the TCC projects, Shelko said. Councilwoman Regina Romero, whose ward includes Origins, in February agreed with focusing on the convention center but is dismayed that Origins has dropped off the radar. "Nowhere in the (council) motion does it say we are going to put all the projects on the West Side on the back burner," Romero said. Romero added a clause to the February council motion to make sure infrastructure work continues to link Origins with the TCC. That primarily involves building a $12 million Cushing Street bridge across the Santa Cruz River.

The bridge in fall was allocated $10 million from the $80 million bond but in December that was reduced to $1.6 million for design and engineering. A 2009 bond would supply construction funds, but now no Rio Nuevo bonds are planned for this year. Hein said the city was looking for transportation funds and federal economic stimulus funds to build the Cushing Street bridge, which is planned to carry the streetcar to the West Side.
 
Pima County officially tops 1M population; Pinal County 2nd fastest-growing in nation

Arizona's rapid population growth has tapered off, but not completely. The Census Bureau's latest numbers for the fiscal year ended July 1, 2008 estimated the population of Pima County (metro Tucson) at 1,012,018--adding over 15,000 residents during the period. Pinal was the nation's second-fastest growing county during the year at 8.8%, with over 26,000 new residents. The Phoenix metro (Maricopa and Pinal counties) added 116,000 residents, ranking third in numeric growth behind Dallas and Houston.


http://www.census.gov/Press-Release/www/releases/archives/population/013426.html
 
If Rio Nuevo survives, one thing is for certain: there will be a lot more oversight and accountability, both of which have been sorely lacking since its inception.


TCCProjects.png




3 options offered on embattled Rio Nuevo
Fed-up legislators demand vast changes to original plan

By Daniel Scarpinato and Rob O'Dell
ARIZONA DAILY STAR
03.20.2009

PHOENIX — While final judgment may be months away, the future of Rio Nuevo has become a tug of war among three camps in the Legislature with wildly different ideas on how to save or kill the Downtown redevelopment district. One thing that is clear at this point is Rio Nuevo will be in for major changes because of the city of Tucson's failure to show significant progress remaking Downtown after 10 years and more than $100 million spent. State lawmakers are clearly frustrated by how Tucson has managed the tax increment financing district, which siphons off state sales taxes.

The three options currently being debated by the Legislature are:
• Continue funding Rio Nuevo but mandate all the money go to build an arena and hotel and expand the Tucson Convention Center — a significant departure from the original focus on museums, history and an aquarium.
• Continue funding the existing city plan, but with a local oversight board that must approve city funding requests and that has the power to audit the city.
• A permanent or temporary elimination of Rio Nuevo funding, above the $200 million that's already been spent or earmarked to pay off the bonds.

The three options are not mutually exclusive, and some could be combined. Formed by Tucson voters in 1999 and extended by the Legislature in 2006, Rio Nuevo is estimated to receive $600 million in state sales taxes by the time it expires in 2025. About $200 million has either been spent, is in the bank or is earmarked to pay off the interest from a December bond sale. City Manager Mike Hein said it was in the council's purview to decide what concessions the city is willing to make on Rio Nuevo. Several council members recited talking points while sidestepping questions about the Legislative proposals. "The question is, do you want to totally flush it down the drain or do you want to salvage something out of this effort and at least give the city a chance to get back some of its reputation?" said state Rep. Frank Antenori, R-Tucson.

A new focus needed
Antenori, one of Rio Nuevo's loudest critics, is leading the effort to direct all funding toward a consolidated cluster of revenue-generating projects: a Downtown hotel, Convention Center expansion and arena. Antenori and others, including Sen. Al Melvin, R-Tucson, say that's the only way the Legislature might agree to continued funding — even if it's not what voters approved in 1999. While Antenori and other lawmakers have criticized Rio Nuevo for drifting from its original purpose, what he's suggesting is almost a complete departure from what was on the ballot. A new arena wasn't in the mix presented to voters at all. The TCC was earmarked $800,000 for a new box office — included only because the law required the district include a facility such as the TCC arena. The only money for a hotel was $8 million for parking and public improvements aimed at attracting a private developer. If the whole package went back to voters, Antenori said it's likely they would cut the funds.

Councilwoman Regina Romero, who represents the West Side and has backed projects planned there, wouldn't comment directly on the Legislature taking control, saying only that she supports infrastructure projects that draw in private development. She noted the council earmarked much of the $41 million from its December bond sale to the hotel and TCC. Mayor Bob Walkup said the legislative proposals are too "speculative" to comment on directly. But Antenori says the two have met together and Walkup was receptive to his idea. Local Republican lawmakers have had some success selling the new vision for Rio Nuevo. Just last week, Senate President Bob Burns, R-Peoria, took a tour of Downtown Tucson with Walkup and said he was impressed by the activity he saw. "I don't think I'm the problem," said Burns, who would like other legislators to take the tour. "There's some angst there among the members."

A new oversight board
Sen. Jonathan Paton, R-Tucson, is leading the push to let Rio Nuevo continue under city direction, but with an independent oversight board controlling the purse strings. Paton is trying to hammer out details on how exactly it would work, who would be on it and what powers it would have. At a minimum, he said the board could veto spending and audit Rio Nuevo's books. "We want to create an oversight committee that would have some real power — veto power — over the rainbow bridges of the future," Paton said. All Southern Arizona Republicans are on board, Paton said, adding the oversight board would report to a legislative committee with subpoena power, and members would need to be from Southern Arizona and not be politicians.

One option is to have the House, Senate and governor appoint four people each to the existing four-member Rio Nuevo Multipurpose board that is supposed to oversee spending, he said. It currently has two members from Tucson and two from South Tucson. Another is to form a completely new board. Walkup said he is "agreeable" to mild reforms, including the oversight committee and a requirement to post Rio Nuevo expenses and receipts online. Romero said she supports accountability but wouldn't say specifically what that meant. "I believe the Legislature and the public vigorously demand oversight," she said.

"Needs to be euthanized"
Despite the best efforts of Tucson lawmakers, there's still strong opposition to continued funding among veteran Republicans negotiating the budget. After a city presentation last month, the now-dead "Rainbow Bridge" over Interstate 10 became a symbol at the Capitol of what legislators see as mismanagement by Tucson's City Council. Lawmakers dubbed it "the bridge to nowhere," since planning for the never-built science center that would have been housed in the bridge cost a total of $13 million and is on hold. "I have heard so many bad things about Rio Nuevo that, frankly, I think Rio Nuevo needs to be euthanized," said Rep. John Kavanagh, R-Fountain Hills, chair of the House Appropriations Committee. Rio Nuevo could be salvaged, he conceded. "It wouldn't be the first time the paramedics shock something back to life, but that's not always successful." Sen. Jim Waring, R-Phoenix, chairman of the Senate Finance Committee, says legally all the money can't be taken since some pays for already-issued bonds.

What happens to the rest of the money could depend on the city reversing the disastrous impression Rio Nuevo Director Greg Shelko made at the Legislature in February. In particular, Waring wants to hear from City Council members, who have so far steered clear of the Legislature and relied on their lobbyists. Another problem, he said, is every e-mail he's received from Tucsonans blasted Rio Nuevo. "Realistically, if your behavior has been what it's been for eight or nine years, it's hard for me to justify to the taxpayers, especially in this economic climate, 'We're going to trust you now and just move forward,' " Waring said. "But I am willing to listen."
 
Last edited:
Sports authority proposes new baseball stadium in Marana
By Erica Meltzer
ARIZONA DAILY STAR
03.30.2009

In a bid to keep the Arizona Diamondbacks and the Colorado Rockies from leaving the Tucson area, the Pima County Sports and Tourism Authority have proposed building a three-team, $125 million baseball stadium in Marana. The sports authority developed the plan in response to a request for proposals from the Arizona Diamondbacks for a new stadium. The team currently trains at Pima County’s Tucson Electric Park. The plan would leave both TEP and the city’s Hi-Corbett Field without a home team but calls for all the teams based in Marana to play games at Hi-Corbett. The plan also includes significant renovations to both facilities to add amenities for fans and youth sports. The Sports Authority submitted the plan to the Diamondbacks at 5 p.m. Friday and released the plan to the public Monday.

Attracting more teams to improve the level of competition here and reducing travel times to Phoenix will be key to preserving spring training in Tucson, Sports Authority Chairman Tom Tracy said. In addition to trying to keep the Diamondbacks and Rockies in town, Tracy said the authority has been talking to several teams that train in Florida. One team has been receptive to moving to Tucson, another has been willing to meet and three others say they are willing to talk, Tracy said, but he would not name the teams. The authority also is in talks with two Japanese teams to train at TEP against American teams. The authority has received permission from Major League Baseball to admit the Japanese teams into the Cactus League.

The plan depends both on the Legislature passing a bill that would allow the Sports Authority to levy taxes on hotel rooms, car rentals, restaurant and bar bills and retail sales and on Pima County voters approving that tax. The county’s Bond Advisory Committee recently decided not to go forward with a planned 2009 bond package because many committee members believe it wouldn’t pass in this economic environment. Tracy said the authority is sensitive to the economic and political climate, but if a vote doesn’t occur before mid-2010, the Rockies and Diamondbacks almost certainly will go elsewhere. The teams also have asked for proposals from several communities in the Phoenix area, including the Gila River Indian Community. The authority estimates the taxes would bring in $15 million a year, enough to creating bonding authority to build the new stadium and pay for ongoing maintenance.

In addition to the new stadium in Marana, the proposal calls for $25 million in renovations to Hi-Corbett, with $15 million going for stadium renovations and $10 million to develop infrastructure around the stadium, including a parking deck and facilities for large youth tournaments. Authority representatives said the stadium is too old and too small to house a clubhouse with modern amenities for a Major League team, but the Midtown location is ideal for bringing fans to games. Each team based in Marana would play five games during the spring training season at Hi-Corbett, maintaining the existing schedule of 15 games. The Rockies have not yet seen the proposal.
 
I think it's good the Tucson area is making an effort to hold on to one of it's remaining pieces of the Cactus League pie. I guess I just wish it wasn't out in Marana.
 
^^same here.
i really wish Tucson/Pima Co could build a baseball stadium in or near downtown for cactus league teams and to help lure back a minor league team.
 
Janos Wilder's return will be a definite boost for downtown, but the confusion around the Congress St. upgrades for the streetcar line hints of more uncertainties surrounding Rio Nuevo's funding and the city manager's office:



StitelerproponCongress-1.jpg
CongressStclosure.png

Property that is owned by Scott Stiteler on East Congress Street is being eyed
by Janos Wilder for the noted local restaurateur's eventual return to Downtown.
(photo: Mamta Popat)



Congress St. will close for 6 months; Janos to move in
But May 8 start of project mysteriously put on hold

By Andrea Kelly
ARIZONA DAILY STAR
04.04.2009

Two days after city officials said they planned to shut down Congress through Downtown for six months for a major overhaul, the plan was mysteriously put on indefinite hold. City Manager Mike Hein and others were vague about why they put the brakes on and said there is no timetable for getting the project restarted. Fran LaSala, the project manager, said Monday that the street would shut down on May 8 for utility line relocations, streetcar track installation and sidewalk improvements. The date was requested by merchants, who wanted the closure during the slow summer months. Hein said funding, other street work in progress and the timeline for recruiting new businesses Downtown, like the return of Janos, are why it's impossible to predict when the project will go forward.

The closure was to have extended from Sixth Avenue to Granada Avenue. LaSala, who is also Hein's assistant, said he doesn't know how much the work on Congress will cost. It is part of a larger $37 million Downtown improvement project in which the contractor gives the city a price as each piece of work comes up. LaSala said the project will be done but had no estimate when. "We just need to look at things a little closer and evaluate some other developments," LaSala said.

Beyond inconveniencing current merchants, the city is negotiating with Janos Wilder, owner of Janos and J-Bar restaurants in the Foothills, to reopen a location Downtown, where he operated until 1998. Wilder had hoped to open in November or December, after the construction was done. Starting in May would have meant the Congress closure overlapped with the closure of the Fourth Avenue Underpass on the east end of Downtown and the Interstate 10 project on the western end of Downtown, diverting traffic from three major projects on to smaller Downtown side streets. The Fourth Avenue Underpass is scheduled to open in August. The freeway widening from Prince Road to 29th Street is supposed to be done by December. All of the ramps from city streets to I-10 are now closed as part of the project.

When pressed for a reason for the delay and estimate when the work will now be done, Hein said, "I think it is in all parties' best interest to have absolutely every 'i' dotted and 't' crossed. "I do not want to give any misimpression to any member of the public through any media source, so I want to make absolutely certain before we announce timelines and schedules," he said. By Friday, merchants still hadn't been told the project was on hold. Glenn Lyons, chief executive officer for the Downtown Tucson Partnership, said the change was "news to me," since he had heard as recently as Thursday the work was still on track for May 8. He said he didn't want to speculate about the reasons, or the possible impact on merchants.

Wilder said Friday he didn't know the schedule had changed, but he is still interested in moving Downtown, although it might not be as soon as hoped. Congress is supposed to be the second phase of the Downtown improvement plan. South Scott Avenue work is underway, and similar work is planned for Broadway and Granada Avenue. The $37 million does not include streetcar tracks for a line that is to be paid for by the Regional Transportation Authority and a federal grant, which has yet to be approved. Hein did not respond directly to questions about whether payments to Phoenix contractor Archer Western, which has already done about $9 million worth of work Downtown, were a factor in the delay, saying only that Rio Nuevo bond money for the project will be available as soon as the council amends its capital-improvement plan. The city Finance Department did not provide requested public records on how much Archer Western has been paid, or if it has been paid.

There are also questions about whether the bidding process used by the city to hire Archer Western complies with Federal Transit Administration standards, which must be met for the city to receive federal funds to cover nearly half of the streetcar project. About $32 million of the streetcar's $162 million budget is to go toward tracks and the structure the streetcar needs to run, said Gary Hayes, executive director of the Regional Transportation Authority. He could not break down how much of that $32 million was to be spent on Congress Street versus the rest of the four-mile streetcar line. Hays said of the work on Congress, "It's all speculation on our part on whether it's reimbursable." The authority will analyze any bills that come in to determine if the work billed was for the streetcar or unrelated expenses, he said.

Work at the east end of Congress will also need to include installing a "switch" to help the streetcar turn at Fifth Avenue and Congress Street, City Transportation Director Jim Glock said. Glock said the tracks into Downtown were installed to allow the Old Pueblo Trolley to use the new Fourth Avenue Underpass. The switch will let the streetcar continue west on Congress or to turn left at Fifth to loop back toward Fourth Avenue. Glock said it wasn't installed when the tracks first went in because doing that work before federal funding for the streetcar is approved could have jeopardized the $75 million the city hopes to receive. The FTA doesn't reimburse for work done before it approves funding on a project, Glock said. The plans for the closure had been scheduled for presentation to the City Council next week but have been withdrawn. LaSala said they will eventually be presented to the council, but council approval is not required for the project.
 