Tucson Development Thread


^Tucson is just following in the footsteps of where Phoenix was with a metro population of about 1M. (Not that Phoenix is any shining example of urbanism.) So for Arizona, fairly par for the course....
 
^Tucson is just following in the footsteps of where Phoenix was with a metro population of about 1M. (Not that Phoenix is any shining example of urbanism.) So for Arizona, fairly par for the course....

You would think Tucson might actually learn from Phoenix's mistakes to become a decent looking city. Tucson's elected officials are completely incompetent. If Tucson allows the bypass to the west, Tucson will actually look like the Detroit of the Southwest.

Why does everything in Tucson take decades to study, only to never actually materialize. I am only 23 and am not sure I'll still be alive when Tucson starts to look like a respectable city. :shrug:
 
If this Daily Star investigative report holds water, the UofA has been as loose with its pocketbook as Rio Nuevo, shelling out big dollars for various designs of their new science center over the past few years:



newUAScienceCenterrender.jpg

This new conceptual design shows the planned UA science center at left, with a planetarium dome;
Arizona State Museum at right; and a three-story Imax theater in a middle plaza.
(courtesy: Rafael Viñoly Architects)



UA outlay for science center near $13 million
City taxpayers foot big bills for travel, scrapped designs

By Rob O'Dell
ARIZONA DAILY STAR
12.07.2008

The University of Arizona has spent nearly $13 million designing a new science center for Rio Nuevo — including notable expenses for travel, meals and architectural designs that have been discarded, according to an investigation by the Arizona Daily Star. Pitched to voters in 1999 as a $30 million item, science-center costs ballooned to $350 million with the proposed addition of a Rainbow Bridge across Interstate 10 before settling back down to about $130 million in a joint development with the Arizona State Museum. With the project poised to move ahead with its third and final building design, a database created by the Star gives taxpayers their first detailed look at what's been spent since mid-2004.

Combing through more than 2,700 paper receipts provided by the UA, the Star found:
● $4.86 million to architect Rafael Viñoly, about two-thirds of which was for the Rainbow Bridge and other designs that were scrapped. Viñoly is still working on a scaled-back science center.
● More than $355,000 in travel expenses for consultants and personnel, including trips to Rio de Janeiro, Brazil; Acapulco, Mexico; The Hague, Netherlands; and various locations around Italy. Much of the travel money was spent bringing consultants to Tucson for meetings, evidenced by more than $40,000 spent on plane tickets.
● $63,000 wired to a Russian bank so a software company called Softomate could develop an Internet Explorer Toolbar add-on. UA officials said they wired the money to Russia because that office does different work than the company's office in Washington state.
● More than $1 million to outside consultants for exhibit design, although the UA is doing most of the exhibit design itself.
● $112,000 for state-of-the-art computers, laptops and electronic equipment for the university, including $7,000 to purchase 12 iPhones. The UA received few bulk discounts on the equipment.
● More than $250,000 in rent, furniture and installation for a new office in the Unisource Tower, so the university would have a presence Downtown.
● $173,000 for public relations.
● $43,000 for local catering and for meals throughout the country, including New York.
● The UA billed city taxpayers nearly $1.75 million in salaries for university employees who worked on the project.

University defends spending
The university defended the expenses on travel, meals, technology and architecture, saying it pared back spending as much as possible when the city reduced its funding for the science center. Bob Smith, the UA's director of facilities, design and construction, said the payments to Viñoly are "well within the normal parameters of architectural, engineering and specialty consultant costs" for a complex project such as the science center. Smith said 75 percent of the meal costs were catering for community meetings or working meetings that contributed to the development of programs, exhibit concepts and design. He defended the travel spending because he said the university flew many experts to Tucson for their opinions rather than paying them consulting fees. But a Star review of the receipts found that only a handful of the experts fit that description. A vast majority of the travel was for paid consultants or staff members. "I think we are getting a heck of a deal," Smith said of the travel. "We're getting some of the best minds in the world for the cost of flying them out here."

Of those reimbursed the most for travel, only Columbia University's Peter Eisenberger, a longtime colleague of Flandrau Science Center Director Alexis Faust, directly fit Smith's description. He was reimbursed more than $52,000 for travel. "A lot of the concepts we are using came from Peter," Faust said, adding that he spent thousands of hours on the project and never charged a fee. Much of the international travel, Smith said, was for conferences where the UA made presentations, including one in Rio de Janeiro where he gave a presentation on how to properly engage the community when building a science center.

Faust said the iPhones were needed because smartphones will be integral to the experience at the center and they are being used in exhibit prototypes. She said the UA needs many of the laptops for exhibit prototypes as well as community outreach, adding that any furniture or electronic equipment bought will be transferred to the science center at Rio Nuevo when it is built. The Russian contractor Softomate was selected for its expertise in developing custom toolbars for Internet Explorer and other Web browsers, along with its in-depth knowledge of "spidering" — intelligent Internet searches that add content to a Web site. Faust said every contractor was "the best in the business or had specialized expertise that made us pick them."

Numbers analyzed
Sheila Grinell, who founded and developed the Arizona Science Center in Phoenix and wrote a book on how to build a new science center, analyzed the Star's database and said none of the spending strikes her as "outrageous." Given that the university hired people from New York, she said, "If you are going to work with them, you have to fly them." She said designers Viñoly and Ralph Appelbaum cost a lot.

But Bob Vint, a local architect who is working on preserving the Mission San Xavier del Bac, criticized the time and money spent on the now-discarded Rainbow Bridge version of the science center, saying it was "absurd" that the UA fell for the idea, and that the city and the university need to start learning from their mistakes. "We fall for these nonsensical, grandiose visions and throw millions of dollars at them. It's just dumb," Vint said.

However, it's not just UA money being spent. As part of the agreement to scrap the Rainbow Bridge design, the city agreed to pay half the UA's design cost, meaning city taxpayers split a $12.8 million expense. When asked whether the city reviewed and approved the expenses, the city released a short statement from City Manager Mike Hein stating: "The city is only following the terms and conditions of the agreement. If the university approves the expenditure and pays for it, then we are obligated to reimburse one-half the amount."

A new beginning
Although university officials showed the Star the new design for the joint science center and Arizona State Museum, Smith said it was two to three weeks premature to make the plan public. However, late Friday, Faust e-mailed the design plans to science center "supporters." The design shows visitors entering from the west, with a large plaza in the middle containing a three-story IMAX theater. The science center with its planetarium dome is to the left and the museum to the right. A dome-shaped telescope is located at the southeast corner of the building.

Smith said the final schematic design will be completed soon, with the more intensive design and engineering work to be completed next year. An optimistic timetable for starting construction is in mid-2009, with the center opening by 2012. At the same time, staff for the Flandrau is developing exhibits for the science center. The centerpiece is an interface that will allow visitors to swipe either an electronic card or a smartphone at the entrance to the museum and at all exhibits.

Faust said the interface — a program called ZoneBee the UA has spent $750,000 on — will transfer content from the exhibits to cell phones and home computers and allow visitors to experience the center after they've left. The museum would also create a specialized Web site for visitors and continually update users with new science and Flandrau information. To help create ZoneBee, the UA hired New York-based employee Giovanni Battistini for nearly $150,000, and has reimbursed him more than $78,000 for travel, meals and cell-phone use in the past several years. Faust said Battistini would make much more in the private sector. Battistini also has an agreement with the UA to try to develop ZoneBee commercially. The agreement calls for the UA to have a "substantial" investment with Battistini in the product, but the amount is confidential under the terms of the contract. UA President Robert Shelton said ZoneBee is a good concept with the potential to be engaging for museum visitors. Shelton said he did not look at the Star's numbers, and delegated the budget and planning for the science center to those under him.

Reactions of support, anger
Tucson City Council members defended the university and its spending. Councilwoman Regina Romero, who represents the West Side, said the university is the expert, and she has faith in it to "plan, design and deliver" the science center. Mayor Bob Walkup said the spending amounts "sound about right to me." He said the city will soon conduct an audit to see how the UA has spent the money, even though the city has already paid the UA most of its $6.4 million share.

Some community members were more critical. Downtown business owner Margo Susco said she was appalled by what she called the extravagance of the UA's spending: $16,000 at the Arizona Inn, $40,000 on plane flights, and meals at some of Tucson's finest establishments. "As a taxpaying small business owner Downtown, I think it's ridiculous," Susco said. "They are just flagrantly spending. It's just not right."

Developer Richard Studwell said the UA spent money on whatever it thought it needed with no regard to cost. "This is indicative of Rio Nuevo: It's not run in a business-like fashion," Studwell said, adding there's little appreciation shown for the taxpayer's money. "They fire the football coach if he loses too many games. These guys are spending millions of dollars and nothing is said."



Timeline of the University of Arizona Science Center

• June 1998: Discussions of a possible $100 million "Sonoran Science Center" museum district on the West Side include a relocated Flandrau Science Center.
• November 1999: Prop. 400, diverting $60 million in state sales taxes for Rio Nuevo, is approved by 62 percent of Tucson voters. The science center is included in the plan.
• May 2003: Preliminary drawings by designer Ralph Appelbaum show a cluster of buildings and two pedestrian bridges spanning Interstate 10 and the Santa Cruz River.
• July 2003: A UA study says a $100 million science center can bring in enough money to pay for itself. The city is asked for $20 million to get construction started by 2006.
• September 2003: The Arizona Board of Regents unanimously approves $73 million for a "world class" science center on the West Side.
• May 2004: The UA selects Rafael Viñoly as the architect.
• August 2005: Viñoly says his Rainbow Bridge design will cost $200 million — double what was approved. By December the cost estimate hits $350 million.
• May 2006: The Arizona Legislature approves a $600 million 12-year extension of the Rio Nuevo special taxing district.
• July 2006: City officials refuse to put up more than $40 million for the Rainbow Bridge.
• August 2006: New UA President Robert Shelton drops the Rainbow Bridge plan, citing a lack of money and community consensus.
• September 2006: The city agrees to pay half the UA's planning and design costs for the science center, provided the Rainbow Bridge concept is scrapped.
• May 2007: The City Council approves a $100 million Science Center combined with a $30 million Arizona State Museum, with the city footing the entire bill. The Board of Regents approves it three months later.
• Dec. 2008: With the final design almost done, UA officials hope to have the Science Center open by Arizona's state centennial in 2012, if the city can sell $65 million in bonds to start construction soon.
 
Richard Oseran's success at Hotel Congress bodes well for his new market and restaurant that are replacing the ill-fated Central Bistro at the train depot:


MaynardsMarket.jpg

Maynards Market & Kitchen opens in the Historic Train Depot this week.
(photo: Tucson Citizen)


Market and restaurant to open in downtown train depot
by TEYA VITU
Tucson Citizen
12.08.2008

The brains behind the popular Hotel Congress the past 23 years are about to see if downtown lightning will strike twice at their new Maynards Market & Kitchen. Maynards opens Friday in the east half of the city-owned Historic Depot, 400 E. Toole Ave. The restaurant is getting a head start on the market, which should open by Jan. 1. Hotel Congress owners Richard and Shana Oseran and partner Ross Rulney have transformed the space once occupied by Central Bistro into a simpler railroad-themed eatery. They are filling half the depot lobby with the market. "People won't recognize it," Richard Oseran said.

The Central Bistro entrance is now part of the kitchen expansion, the bar was moved to the back and carpet gave way to the ground-and-polished concrete floor. Black and gray are the dominant colors in the restaurant except for the colorful ceiling, and an industrial railroad theme provides the look. Shana Oseran describes the food offerings as "homemade food you'd find at your neighborhood restaurant.". Maynards will serve breakfast from 7 to 11 a.m., lunch from 11 a.m. to 4 p.m. and dinner from 5 to 10 p.m. A late-night pizza menu from 10 p.m. till midnight will be offered Thursdays, Fridays and Saturdays. "Everything is a la carte," said Shana Oseran, who devised the restaurant concept. "You decide what you want." Breakfast includes egg frittata. Lunch features seven kinds of pizza and sandwiches such as hot brisket or Mediterranean tuna on multi-grain breads or baguettes. Dinner includes fish, meat or chicken entrees. For breakfast and lunch, you order at the market counter (even when the market is closed). Then you pick a seat next door, on the train platform or in the market, where there is an 18-seat table crafted from a tree burned on Mount Lemmon in the 2003 fire. Dinner has seated menu service. "This is a hybrid system we're trying to pull off," Richard Oseran said.

Even with Central Bistro's failure and Fourth Avenue underpass construction next to the depot, Oseran decided to take a chance directly across the street from his Hotel Congress. "We believe if you build something authentic and original, that will bring people downtown," Oseran said. "All I could really alter (about downtown development) was what I had the power to do myself. We have 130 people, people who hire on with us and stay on. They don't leave. We can do something for the community, and we're giving people an opportunity to move up in management."

The city gave Oseran a rent-free lease for the restaurant space until May 2011, but Oseran is paying $200 a month for the lobby and platform area, according to the lease agreement. Starting in March 2011, rent would be $7,010 per month. A year ago, Deputy City Manager Mike Letcher said the three-plus years of free rent would take the place of the city paying for tenant improvements in the city-owned depot. Oseran said building the restaurant and market cost about $750,000, about twice as much as he expected. The encaustic tile ceiling above the bar, espresso station and lounge gives the only color relief to the black-gray at human level. Colored tile in hues of amber, white, Sag Harbor gray and Georgian brick depict a Cuban floral motive that Sonoma, Calif.-based designer Rory McCarthy thought would fit the early 20th century setting of the depot. "The essence of it is we wanted to respond to the context of the depot but we didn't want to do (the Maynards renovation) in a traditional way," said McCarthy, who lived in Tucson from 1966 to 1989. "It's an industrial aesthetic, a celebration of the machine. In this case it's the railroad." His interiors can still be found at Etherton Gallery and the Roadrunner Grill.Maynards Market & Kitchen opens in the Historic Train Depot this week.
 
City Council approves $78 million bond for Rio Nuevo work
by TEYA VITU
Tucson Citizen
12.10.2008

The City Council approved a roughly $78 million Rio Nuevo revenue bond Monday to fund portions of 14 downtown projects. The council action will allow underwriters to shop for investors next week with the intention of having the bond funded by Dec. 30, said Shawn Dralle, a financial adviser at RBC Capital Markets. She anticipates an interest rate between 5 percent and 6.5 percent. "The underwriters have been premarketing the bond," Dralle said. "We have a good sense there are investors out there." The proposed bond last week got a credit rating of A-minus from Fitch Ratings and A2 from Moody's Investor Service. Dralle described them as "very solid, good ratings." "These ratings really allow us to sell the bond," she said.

Technically, the Rio Nuevo Multipurpose Facilities District Board last week authorized the sale of a bond not to exceed $80 million. The council action provides "city stand-by" money if sales tax revenues and the one-year debt service reserve fund built into the bond fall short of meeting a year's debt service. The provision creates a dedicated avenue where the city can channel its required 50 percent match of every Rio Nuevo Tax Increment Financing dollar spent, said Jaret Barr, an assistant to City Manager Mike Hein.

Council members spoke favorably about the bond in the Monday afternoon study session. "It's our own economic stimulus package," Mayor Bob Walkup said. This bond will be the first of six planned Rio Nuevo bonds through 2014 to raise a projected $453 million to largely pay for Tucson Origins projects on the West Side and Tucson Convention Center and Tucson Arena work downtown. "We're going out for a reasonable amount of money and money we're ready to spend," Councilwoman Nina Trasoff said. This first bond will pay for design work for the Tucson Arena, the University of Arizona Science Center/Arizona State Museum, Arizona History Museum and Tucson Children's Museum as well as construction at the Depot Plaza parking garage and Clark Street freeway underpass.


What the bond will pay for

The full allocation is as follows:
• $11.6 million - Depot Plaza garage (under construction)
• $10 million - Tucson Arena design work
• $9 million - Clark Street freeway underpass
• $6.8 million - repayment of city loan
• $6 million - downtown infrastructure
• $5.4 million - mission landfill and archaeology
• $3 million - Mission Gardens
• $3 million - Arizona History Museum design
• $2 million - UA Science Center/State Museum design
• $2 million - Barrio Viejo infrastructure
• $2 million - Barrio Sin Nombre infrastructure
• $1.6 million - Cushing Street bridge and road design
• $1.4 million - Depot Plaza public improvements
• $1.2 million - Tucson Children's Museum design
• About $4 million for interest payment
• About $7.7 million in reserve as a debt service guarantee
 
With the new streetcar line under construction, apparently Portland developer Williiams and Dame sees the opportunity in downtown Tucson, and has gathered a few local partners to make the city a most interesting proposal:



Venture plans major work Downtown
Pledges to shoulder $12M in upfront costs on 75 acres; city appears ready to OK deal

By Rob O'Dell
ARIZONA DAILY STAR
12.11.2008

A team of high-profile Tucson business leaders wants the city to give it the right to plan and develop a large swath of Downtown's east side and has offered to invest nearly $12 million upfront as a show of good faith. The group includes Tucson developer Jim Campbell; Portland, Ore., development firm Williams and Dame, which has built a high-profile project in Tucson; financier Scott Stiteler; and restaurateur Kwang C. An, who has agreed to open a new restaurant next to the Rialto Theatre.

The group's pre-development agreement with the city includes money for some of the City Council's favored causes, including affordable housing, the Warehouse Arts District and the Skrappy's youth club. The council is set to consider the agreement on Tuesday. In return for its investment in infrastructure, planning and land, the investment group would receive options on several prime Downtown land parcels in addition to the ones it already controls.

Details of the agreement include:
● $650,000 to plan and design infrastructure in the 75-acre district created by this proposal, which consists of much of the eastern portion of Downtown and straddles the Union Pacific railroad to include much of the historic Warehouse District.
● $1.8 million to pay for zoning, development standards and design guidelines for all parcels in the 75-acre district, including land the group doesn't own or have options on.
● $500,000 for the Warehouse Arts Management Organization, or WAMO, to conduct assessment of the aging structures there.
● $2 million in a revolving line of credit for artists in the Warehouse District to fix up the buildings and help get them tenants.
● $250,000 in either a rent subsidy or building improvements for Skrappy's, and a pledge to find the youth club a permanent home in the district within a year. Until then, Skrappy's would move back into its old home on East Broadway.
● $1.5 million to fix up the Rialto Theatre by upgrading restrooms and a bar downstairs, adding restrooms and a lounge upstairs, and adding a merchandise area as well as a green room for the acts who play there.
● $3.5 million to upgrade the Rialto block and bring tenants to it, including An (pronounced "On"), who has agreed to open a 20,000-square-foot restaurant there named An Congress, a play on words and his name. An currently owns the Great Wall of China restaurant and formerly owned Sakura, where he was known for his commercials with former Diamondbacks slugger Luis Gonzalez.
● In exchange for the money they put up, the developers agree to develop land they already own, which includes the former Greyhound Bus Station site, the Rialto block and the entire southern portion of the 200 block of East Congress, as well as the former Martin Luther King Jr. housing project, which is now called One North Fifth.
● The developers would also get options on several prime parcels Downtown or near it, including the Ronstadt Transit Center, the vacant land next to the Historic Train Depot, 6 acres of vacant land within the Warehouse District and the city-owned former Broadway Volvo site at East Broadway and Euclid Avenue.
● The city is required to complete the modern streetcar planned along Congress Street by 2012. If it does not, the city would have to reimburse the developers for some of their pre-development costs.

The agreement, which the city and the developers have been talking about for months, has been moving on the fast track, as a number of Downtown interests and organizations already have lent their support. After initial criticism from Downtown interests that the deal was a "giveaway" because people thought the development company would get the warehouses, many groups have now signed off, including the Warehouse Arts Management Organization, the Rialto Theatre Foundation and the executive committee of the Downtown Tucson Partnership.

Marvin Shaver, WAMO's president, said the group signed off after receiving assurances that the $2 million line of credit will be zero-interest. He said the organization will decide "how and when the warehouses will be renovated," which will include putting up its own money and finding other funds, such as new market tax credits. "It basically preserves the buildings and lets WAMO take the lead," Shaver said. Doug Biggers, the Rialto Theatre Foundation executive director, said he supports the deal, adding, "If not this, how could it ever work?" Michael Crawford of the Downtown Tucson Partnership said the deal is "the kind of public-private partnership we've been dying for here." One Downtown interest who didn't give approval was Hotel Congress owner Richard Oseran, who voted against the agreement at the Downtown Tucson Partnership meeting. He declined on Wednesday to say why.

City officials are high on the development proposal as well. "This is an unbelievable opportunity in a difficult market to see revitalization take place in a magnitude few thought could or would happen," City Manager Mike Hein said. Council members Regina Romero and Nina Trasoff both said they support the agreement. "I presume it's a good deal for them; I know it's a good deal for the city," Trasoff said, adding that moving Skrappy's back to Downtown was "gravy." Representatives from Skrappy's couldn't be reached for comment Wednesday.

Campbell, Stiteler, and Williams and Dame have pooled their investments into one development company called the Downtown Tucson Development Co. Stiteler, who has developed and financed several projects in Tucson, said he and rest of the team are committed to revitalizing Downtown and are willing to take on the risks to do it. "There's nothing in there that's unrealistic," he said. "There are things in there that are going to be difficult."

An, whose new restaurant would be a combination of a sports bar like the ESPN Zone and a restaurant like the Yard House, said it also will have a rooftop deck with views. "Everybody's been talking about Downtown for 20 years, and it's all talk, talk, talk," An said. "Somebody needs to step in, and others will follow. . . . This will be good for me, good for the developers, good for the city and good for Tucson's people." Campbell, who noted that the developers would not get options to the land until they meet requirements, said a large developer who will take the risk is needed Downtown. "Downtown Tucson is not going to happen until somebody steps up and takes a chance," Campbell said. "That's what we're doing."
 
As someone new in Tucson, does anyone have a rundown of the projects that are happening downtown as well as the streetcar route?
 
^There's a streetcar map on page 25 of the following link:

http://www.dot.ci.tucson.az.us/hottopics/pdfs/Tucson Draft EA 1.18.08.pdf


To date there is no development project list for Tucson. Off the top of my head, the biggest projects going right now are the $500M Ritz-Carlton resort in Marana and the $200M widening of I-10. Other than that, the few downtown projects under construction include the 4th Ave. underpass, the Depot Plaza parking garage, and the Mercado San Agustin just west of I-10. And there are too many stalled or "on hold" projects to mention here.

The best bet for a new high-rise in Tucson is probably the Sheraton convention center hotel, which probably won't happen until the convention center remodel and new arena are further along; and the hotel will need its own bond issue by the city to get funded. (Also, see the list a few posts back of some upcoming Rio Nuevo projects to receive bond funding.)

Maybe after the first of the year I'll pull together a more comprehensive list for the metro area.
 
Last edited:
MOCA Tucson may have a new home in the fire department headquarters building:


newMOCAbldg.jpg

This artist's drawing shows what the art museum would look like after the Fire Department moves out next year.
(render: courtesy of Wedge Studio)


Art museum only bidder for TFD headquarters
Building at 265 S. Church Ave erected in 1971

by TEYA VITU
Tucson Citizen
12.11.2008

The Museum of Contemporary Art Tucson turned in the only proposal to take over the Tucson Fire Department headquarters, 265 S. Church Ave., once the department moves out next autumn. The deadline was Dec. 4 for proposals to lease the building, said Lou Ginsberg, the city's real estate program director. The selection committee is evaluating the museum's proposal and will send a recommendation to City Manager Mike Hein in January, Ginsberg said. City Council approval would be sought in April or May. The two-story, 19,289-square-foot building was built in 1971. The Fire Department plans to move to a new structure in fall 2009 near Cushing Street and Granada Avenue.

The museum leases space in another city-owned building at 149 N. Stone Ave., next to the Joel D. Valdez Main Library, but must move out by the end of the year. The fire headquarters would come with a five-year lease. "We plan to reactivate that building by operating a world-class contemporary art museum," said Randi Dorman, president of the museum's board of directors. She said the museum envisions quickly opening a gallery in the large open area where fire engines sit now and then improving smaller rooms for other gallery and studio space.

The city selection committee includes Ginsberg and Tim Murphy, both from the city real estate program; Tony Larrivee of the city Facilities Management Division; Tucson police Capt. George Stoner; and Glenn Lyons of the Downtown Tucson Partnership.
 
Although the city selected Garfield Traub's proposal for the convention center hotel in June, it will now hold three open houses to get public input on the final design of the new Sheraton, now scheduled to begin construction in 2010:

RioNuevochanges.png

The Science Center will be west of Interstate 10; the arena and hotel will be east of the freeway



Rio Nuevo projects finally on their way
Public's input wanted on TCC hotel design

by TEYA VITU
Tucson Citizen
12.12.2008

There's been a lot of talk for many years, plenty of false starts, endless chapters of public discord. No construction cranes currently fill downtown, but two major Rio Nuevo projects have quietly reached milestones, with real start dates on the horizon. Construction is set to start in the summer on the $130 million University of Arizona Science Center/Arizona State Museum just west of Interstate 10. Formal design work will start next week on the hotel for the Tucson Convention Center following a Monday open house where public input will be sought for the hotel's look. The public can play a role in designing the Sheraton Tucson Convention Center Hotel, which will add a 25- to 28-story landmark to the downtown skyline. Those who show up for the 5-7 p.m. open house Monday at the TCC Grand Lobby (west entrance on Granada Avenue) can weigh in on what they want the hotel to look like. Parking is free.

The hotel will be the signature piece of a project that includes building a new Tucson Arena and expanding the convention center. Construction is expected to start on all three projects after the 2010 gem shows, Rio Nuevo director Greg Shelko said. The Garfield Traub Development/Sheraton design team will take public comments and use them as a basis for their design vision. They will return with a design at a second open house in late January, Shelko said. "We have no preconceived idea what it will look like," Shelko said. "We will ask people what they want it to be in sense of look, design and feel of the building. The whole thing is not to foist a design on the community."

Garfield Traub/Sheraton has determined the hotel will sit at the edge of the TCC Grand Lobby, filling a curved space now used as a drop-off area. The hotel, TCC and other nearby buildings will be presented as unadorned blocks at the open house, giving the public a chance to say what they should look like. The designers will then show a variety of hotel designs elsewhere, as well as material palettes to give people a sense of different looks. "People can express some preference for tower designs," Shelko said. "Do they like glass, metal or stone materials?"

Garfield Traub/Sheraton won the development agreement in June over three other development teams offering Hyatt, Hilton and Marriott hotels. The four hotel designs were played up earlier this year, but Shelko said they were just window dressing. The city and selection committee were more concerned with hotel operations and financial details. "They were ideas. They were just concepts," Shelko said of the earlier designs. "They meant something at the time, where their heads are at, but we didn't buy a design. The most important thing about all this is we have the hotel operator."

The hotel will be built with a $150 million revenue bond that will be paid back with hotel revenue. The bond is independent of the six proposed Rio Nuevo bonds that will be issued between now and 2014 to raise an estimated $453 million, Shelko said. Shelko plans to take the hotel design to the City Council in April, after a third open house in late March. When the council approves the design, Rio Nuevo will try to sell the bond. The recent downturn in the economy is not expected to be a factor, said Bill Hicks, Rio Nuevo's legal counsel. "There are always people with money to invest if we have a credit-worthy project," Hicks said. Shelko anticipates starting hotel construction soon after the 2010 gem shows and having it open in 2012. He expects construction of a $130 million Tucson Arena and the TCC expansion to start about the same time.

A pre-submittal meeting Dec. 4 for arena design/build teams drew 140 to 150 people from 25 to 30 companies. TCC Interim Director Tommy Obermaier didn't expect that large a turnout. "It tells me the project is pretty exciting and a lot of people are paying attention to this, and, of course, there is the economy," Obermaier said. He will post a request for qualifications later in December for "construction managers at risk" to lead the design/build team. The CMAR concept means the team will complete the project for a guaranteed maximum price, in this case $130 million.

Obermaier is negotiating with two prospective arena operators and expects to have an operator in place by the end of the year. The operator will serve as a nonvoting adviser as the city weighs replies to requests for qualifications to design/build firms. The replies are due in late January. He estimates design work will take 18 months and construction will take 18 months. He's shooting to open the arena in fall 2012. The arena will be located just south of Congress Street along the freeway frontage road. The design/build team will work with established parameters such as 12,500 seats, 22 suites, an ice floor to accommodate hockey and facilities to handle modern-day touring events such as rock concerts and circuses, and to do it all with $130 million in Rio Nuevo bond funds.

UA Science Center to use 'open source technology'
How do you get the most out of $130 million to build a big-city science center? Utilize open-source technology. Science centers routinely cost $200 million to $300 million or more to build, but the City Council drew the line at $130 million for a combined University of Arizona Science Center/Arizona State Museum at Tucson Origins on the West Side. So the Flandrau: The University of Arizona Science Center team brainstormed to come up with an innovative concept to furnish a science center on the cheap. The answer was open-source technology. That is technology available at no cost that can be used or altered, as long as the user offers the alterations to others at no charge.

The Flandrau team will tap into such technology to create 26 variations of intelligent, interactive exhibit modules that will let you do anything from becoming a virtual brain surgeon to designing your own Mars Lander. "We don't know anybody doing this in the science center community," said Alexis Faust, Flandrau's executive director. Visitors will use a Smart Ticket included with admission that will allow them to personalize a science center visit as more personal information gets loaded onto the plastic card, which is digitally connected to all the exhibits. Visitors can also use the Smart Ticket to access the online version of the science center from home or school. "There is an online component for every exhibit experience," said Sean Fitzpatrick, a Flandrau special projects manager.

Depending on what's programmed onto your Smart Ticket, an exhibit may present information tailored to your interests. "It allows you to create your own experience," said Matthew Wenger, a graduate student working on exhibit prototypes. "Normally, you go to a science center, you do something and it's done. This allows visitors to continue the experience at school or home." Faust said the new science center will pioneer new ways of learning with the interactive technology. "The truth of the matter is we're creating new knowledge at such a rapid rate we have to learn how to better evaluate information," Faust said.

The Flandrau team will substantially reduce costs by building and maintaining its own exhibits rather than hiring a firm to do the work, as is common among science centers, Faust said. One interactive model will be a 3-D Planner. This will be a table spanned with neoprene rubber and pixels underneath that can be programmed to push up the Catalina Mountains, for example, and an image of the mountains can be projected onto it. The 3-D Planner can be changed at will to respond to current events, Faust said.

Faust said $1 million has been raised toward the $60 million UA must raise in advance to build the pair of museums as it awaits compensation from a 2014 Rio Nuevo bond. The UA is expected to get $65 million in Rio Nuevo bond funds in summer 2009, which will fund construction through fall 2010, said Robert R. Smith, UA's vice president of facilities design and construction. UA previously received $5 million in Rio Nuevo funds for design costs. "We look at construction starting in earnest next summer," Smith said. "We want to have this open for February 2012 (the month of the state's centennial)." The science center will use $100 million of the $130 million in Rio Nuevo money, while the Arizona State Museum will use the other $30 million. The two museums will share a central lobby, Smith said.

additional information
IF YOU GO
TCC Hotel Open House
• When: 5 to 7 p.m. Monday
• Where: Tucson Convention Center, 260 S. Church Ave., Grand Lobby, Granada Avenue entrance
• Parking: Free in TCC lot off Granada
• What: Public input is sought for design features the Sheraton Tucson Convention Center Hotel should include.
 
City to get just $25M of $75M federal grant it expected for streetcar
by GARRY DUFFY
Tucson Citizen
12.13.2008

Tucson's modern streetcar project will receive $25 million through a federal grant instead of the $75 million that planners had expected. City Council members will hear an update Tuesday on the streetcar, which voters approved in 2006 as part of the $2.1 billion Regional Transportation Authority 20-year plan. The project would be built in phases and eventually run from Avenida de Convento downtown to near the Arizona Health Sciences Center off Campbell Avenue.

Since the RTA vote, city transportation officials have been working with Federal Transit Administration staffers to secure grant money to start and build the project. The $162 million streetcar system, to be completed in 2011, called for the RTA to fund $87.7 million of the cost. The remainder was anticipated to come from "up to $75 million" in federal transit Small Starts program grants. "We're going to continue to pursue federal funding in other areas," Shellie Gin, project manager for the Tucson Transportation Department, said Thursday. "The goal is to keep this project moving forward." Among the issues between federal staffers and city transit officials is whether the streetcar system meets required FTA cost-effectiveness criteria to qualify for up to $75 million in grants.

Mayor Bob Walkup and city transportation officials met with federal transit representatives in Washington, D.C., in June to discuss the funding. The mayor wrote a letter July 10 to U.S. Secretary of Transportation Mary Peters, stating local officials' belief that the city had met all requirements for the anticipated $75 million grant. The mayor followed up with a July 22 letter to FTA Administrator James S. Simpson, saying federal Small Starts evaluation methods do not "adequately nor accurately capture" the full benefits of streetcar investments." Federal transit staffers continue to disagree with Walkup's assessment.

The federal officials Thursday said the $25 million grant is being provided to the streetcar project under an exemption through a different grant category, New Starts. "The request is small enough so it doesn't have to meet the stringent requirements of the New Start process," Paul Griffo, an FTA spokesman, said Thursday. Griffo said the city can submit grant applications for later phases of the project.

At the council study session Tuesday, city transportation officials will provide an update on the anticipated release of the $25 million federal grant on Dec. 20. The streetcar project was a central feature of the 2006 Regional Transportation Plan. Backers cast it as both a mass transit amenity that would reduce traffic and air pollution, and an economic driver that would attract high-quality development along its almost 4-mile route.
 
The city's restoration program of historic buildings is bringing back downtown's sense of place:


FacadeRestorationProperties.png



ScreeningRoomFacade.jpg

LEFT: The look of The Screening Room. RIGHT: Proposed facade restoration and new marquee for The Screening Room


Wig-o-RamaFacade.jpg

A vacant office building at the intersection of Congress Street and Scott Avenue (LEFT), will be renovated to its original 1909 and 1919 look, (RIGHT).


Rialtoblockfacade.jpg

LEFT: The Rialto Block is boarded up. RIGHT: Proposed facade restoration for the Rialto Block brings back prismatic glass cubes above the storefronts.


64ECongressFacade.jpg

LEFT: 64 E. Broadway has one 1984 facade that covers two buildings. RIGHT: The proposed facade restoration will reveal both buildings with their original 1909 and 1919 facades.



Rialto Block, 3 other downtown buildings picked for facade makeovers

by TEYA VITU
Tucson Citizen
12.13.2008

Wig-O-Rama, the Rialto Block, The Screening Room and a vacant, historic office building at 64 E. Broadway will tap into Tucson's $520,000 fund to restore facades dating back to the 1910s. The four properties were chosen from eight finalists to take part in the city's facade restoration program for pre-1948 buildings. The program is funded with leftover downtown revolving loan funds from 1982, said Glenn Lyons, executive director of the Downtown Tucson Partnership. "If we would have had another $2 million, we could have had 30 building renovations in 2009," Lyons said Friday while making the announcement at the Rialto Theatre. The property owners must at least match the city contribution, Lyons said. The facade projects should be finished by the end of 2009 or early 2010.

Wig-O-Rama, 98-110 E. Congress St., will get $120,000 from the city fund for an estimated $240,000 effort to remove stucco sheeting from 1948-49 to restore the original 1904 look. "It's the ugliest corner that downtown has with the biggest opportunity to be rejuvenated," said architect Rob Paulus, whose firm is designing the facades for Wig-O-Rama and the Rialto Block, 300-320 E. Congress St. "We will unfrost the cake and see what we have to work with." The Rialto project was allocated $125,000 from the city fund for a $500,000 project that will be on street level. Glass storefronts will be restored, as will small cubes of prismatic glass that originally were above the storefronts in the 1919-21 structure that attaches to the Rialto Theatre at the east end.

The vacant office building at 64 E. Broadway, until recently occupied by Southern Arizona Legal Aid, will lose its 1984 facade. Architect Robert Bailey will use the $125,000 forgivable city loan for a $500,000 project to reveal two separate facades from 1909 and 1919. The Broadway-Scott corner had a brick facade that "doesn't have a lot of style," but the adjoining building's facade on Scott Avenue had Prairie-style brick, Bailey, of Robert Bailey & Stephen Grede Inc. said. "We have the original corners of the original blueprints," Bailey said. "We were really fortunate they were found in the building. They are just scraps of blueprint." Bailey's project will likely include a sidewalk cafe on the 8-foot-wide sidewalk that will be part of the Scott Avenue infrastructure project that started last week. The Rialto Block proposal also includes sidewalk dining on Fifth Avenue and both the proposals include awnings to provide sidewalk shade.

The main thrust of the effort at The Screening Room, 127 E. Congress St., will be a triangle marquee jutting over the sidewalk. Architects from Ibarra Rosano Design Architects were out of town Friday. The Screening Room will get $63,000 in city funds for a $126,000 project.

If any of the selected projects fails to come up with the matching funds, the downtown partnership's selection committee will award the money to one of the four facade proposals not selected, Lyons said. They are the W.A. Julian Building, 111-121 E. Congress; 256-278 E. Congress; Beowulf Alley Theatre, 11 S. Sixth Ave.; and ArtFare The Muse, 51 N. Sixth Ave. Lyons said the partnership is working to raise more money to award a fifth facade project and possibly more. The selection committee that picked the four proposals consisted of Lyons and Teresa Bommarito from the partnership; Fran La Sala and Nicole Ewing-Gavin from the city manager's office; Brooks Jeffery, associate dean of the architecture school at the University of Arizona; Demion Clinco of the Tucson-Pima County Historical Commission; developer Phil Lipman; Mary Lou Focht, owner of Old Town Artisans; and Jonathan Mabry, the city's historic preservation officer.
 
K - thanks for always posting the great info and updates on Tucson.
it all sounds so promising; i can't wait to see results.
i really like that program to restore historic facades. i hope they find/raise more money.
also, hopefully Obama's transportation funding/economy stimulating project will get more money to tucson for the streetcar.
ps - what is the picture of in your avatar?
 
I like the idea of the facade restorations going on in Tucson.

I have several in mind up here in Phoenix that I wish they'd tackle.
 
ps - what is the picture of in your avatar?


^Although I've mentioned it previously, it's a photo from several years back of snow on 13,800-ft. Mauna Kea, on Hawaii's Big Island. After an unusually cold winter storm, it snowed down to the 8,000 ft. level, although it only lasted for a day or two. To see it in person is rather astonishing--almost looks like the Rockies (albeit it with coconut palms in the foreground).
 
These latest facade restoration projects are great, especially with the earlier announcement that the old Montgomery Ward/Walgreens building will be restored. I hope more funds can be found for such projects. There are a lot more surviving historic buildings downtown than most people realize, they are just all covered by later renovations.

These facade improvement projects really should have been a primary focus for Rio Nuevo from day one. Just think, by now most of the historic commercial buildings downtown would have been restored. These would have been tangible signs for progress and people would not think Rio Nuevo is a total bust/cash cow.

Congress Street rather than the west side of I-10 is where I think the greatest opportunity to revitalize downtown lies. We are very fortunate to have 2 historic theatres framing the street - that combined with more relatively low cost restorations would give the street a character that could attract infill development once the economy recovers.

My dream projects would be if someone restored the exterior of the Pioneer Hotel at Stone and Pennigton and the remaining wing of the old Santa Rita Hotel - combined here with some sort of new construction on the site of the demolished portion of the original hotel - hopefully better designed than the last proposal for that site.
 
Last edited:
My dream projects would be if someone restored the exterior of the Pioneer Hotel at Stone and Pennigton...

Holualoa Companies bought the Pioneer for $7.8M about four years ago and promptly said they were interested in restoring its original facade. However, I haven't heard anything since, so those plans are probably on hold until the downtown office market picks up again (see more info. on post #88).
 
Thanks - I thought I might have heard something along those lines. Hopefully it will come to pass... the current appearance of the building is so odd.
 