Tucson Development Thread


The City Council is feeling the heat this summer--especially from the AZ legislature--and may actually make some decisions on Wednesday to speed up Rio Nuevo and hold onto their TIF dollars:



Tucson rushes to jump-start Rio Nuevo
Legislative threats to yank funding spur costly action

By Rob O'Dell
ARIZONA DAILY STAR
08.03.08

Tucson is hurriedly assembling plans to construct several of Rio Nuevo's centerpiece projects — but at a previously unexpected cost of as much as $300 million in debt and $180 million in interest. The extra cost means the city would have to postpone one of the signature Downtown projects for at least several years. The new plans to bond against future Rio Nuevo sales-tax funding came just days after the Arizona Daily Star revealed the city has already spent $77 million on Rio Nuevo, had nearly zero in the bank for it as of June 1, and state lawmakers are threatening to pull the project's funding.

Although one council member said the change in course is unrelated, several Downtown leaders said the Legislature's threat is behind city officials' sudden urgency. Tucson must move quickly to show the Legislature it is making progress so the state doesn't consider yanking the money, said Steve Lynn, board member of the Downtown Tucson Partnership. "The clock is ticking," Lynn said. "The threat of losing the funding mechanism is a real threat."

Before the Star's audit of the Rio Nuevo spending, the city had been considering a smaller bond package of $72 million that would have been backed by the city's general fund budget. Instead the city began pushing plans last week to incur debt against the future revenues of the project's tax-increment financing, or TIF, district, which is funded by sales taxes diverted from the state budget. The maximum bonding plans could pay for several — but not all — of Rio Nuevo's major projects, giving the City Council a difficult political decision to determine which projects will move forward now and which will have to wait.

The major Rio Nuevo projects planned are:

● $102 million for a new arena, hotel and convention center.
● $130 million for a University of Arizona science center and state museum.
● $100 million for infrastructure and streetscape.
● $45 million for an Arizona Historical Society museum.
● $70 million for parking.
● $27.5 million to re-create the Mission San Agustín, built here by Spaniards in the late 1700s.

Several financing options will be presented to the council on Wednesday. It's also possible the city could do a smaller bond now and a larger one in 2009, several city officials said. If the council opts against bonding, it would fund projects as the sales tax money comes in from the state. But the Star's audit revealed the city only had $29,000 left in the bank on June 1, meaning it would be waiting for years to fund major construction.

The Rio Nuevo district is expected to generate a total of $800 million in sales taxes before it expires in 2025. Inflation will eat up a chunk, however, making the district actually worth $575 million in today's dollars. That means the maximum bonding package would take up the lion's share of Rio Nuevo money available for the next 10 years — unless the city makes smart investments that dramatically increase sales taxes over that time.

As financing costs run about $60 million per $100 million bonded, City Manager Mike Hein said "the more you bond upfront the less you have for the future." The key is to bond for projects ready for construction right now and wait for others, Hein said. It is unclear whether he plans to give recommendations on specific projects Wednesday. Because it is a special taxing district, voters do not have to approve the bonds, which are likely to run for 15 years, or until the district expires in 2025, said Jaret Barr, Hein's assistant.

Reversing course

Tucson Republican state Rep. Jonathan Paton said two recent events have momentum going against the city: the failed push by some council members in late June to fire Hein and the Star's audit of Rio Nuevo. "Those are two huge issues," Paton said. He warned that legislators "keep saying we could have used that $77 million to balance the (state) budget," which could face another deficit next year. "It's not a joke."

Paton said Hein was a large factor in persuading the Legislature to expand Rio Nuevo funding in 2006. "A lot of people in Phoenix signed onto this because they believed in him," Paton said. "He's very credible. The attitude about some of the council members is not the same." But Councilwoman Nina Trasoff said the council has planned to get options from its staff for two months. "It's not in response to anything," Trasoff said, referring to the state's threats and the Star's audit.

Broad support

There's broad support on the council and among Downtown boosters to bond against the district's revenues to start paying for major projects. The questions are how much and for which projects. Trasoff has said for months that August's council meeting would show voters Rio Nuevo "is real and is actually happening." She said she won't make any decisions until Wednesday. Larry Hecker, a Downtown Partnership board member, said bonding "makes good financial sense and good community sense." "By bonding you can accelerate the availability of the benefits," Hecker said of Downtown progress. "You'll have money available sooner." The decision to go with revenue bonds was a "last-minute reversal," said Councilwoman Regina Romero, who said she supported it. "We should definitely go out for as much money as we can," Romero added.

Councilman Rodney Glassman, though, contends a plan to bond $300 million as soon as possible is tantamount to a "Ready, Fire, Aim" plan to revitalize Downtown. He said he's not against bonding per se, but wants a clear plan for what the money would accomplish. "I want to see a complete picture of what we're planning to do Downtown," Glassman said. "I'm not prepared to check out of the grocery store before we finish packing the cart."

East vs. west

The fact that some projects will be pushed back could lead to a revival of a long-standing Rio Nuevo debate: Should the city spend more money on the east side arena, hotel and refurbished convention center Downtown, or on a museum and cultural district on the west side? Glassman said he favors such projects as the arena and the hotel. "We have to put a greater focus on revenue-generating projects. That has been noticeably absent so far," he said.

The city should try to build the projects that are ready now, said Glenn Lyons, chief executive officer of the Downtown Partnership. He said that could include the arena, the UA Science Center and the Mission San Agustín. "That's $300 million right there," he said. The projects that will generate the most sales tax for the district are the arena, the hotel and the convention center, Lyons said, adding, "That package is the real economic driver." Romero agreed the city should fund "what's ready to go," and said that includes the UA Science Center on the West Side. Construction could start next year if the city gives the UA $130 million, she said, adding the city needs to be equitable between Downtown and the West Side. "We need to be shovel-ready," Romero said.




Rio Nuevo-area project is up for vote
City to weigh development plan for 400 homes, hotel, businesses


MercadoDistrict7-08.jpg

This view from Sentinel Peak shows the 15-acre parcel (the beige-colored vacant area)
in the Mercado District proposed for a mixed-use development by the Gadsden Co.
(photo: Tucson Artisan Builders)


By Rob O'Dell
ARIZONA DAILY STAR
08.04.2008

An agreement for a Tucson developer to build 400 housing units, retail space and a boutique hotel on the West Side could be approved by the City Council on Wednesday. The agreement would be with the Tucson-based Gadsden Co. to develop 15 acres bounded by the Santa Cruz River, Congress Street and two new roads: the north-south Avenida del Convento and the east-west extension of Cushing Street. The property is just north of the planned Tucson Origins Heritage Park and several museums proposed for the West Side. It is directly east of the Mercado at Menlo Park, a mixed-use project now being built by Rio Development Co., which is run by Justin Dixon, the son of Jerry Dixon, of the Gadsden Co.

The Mercado at Menlo Park is hoping to finish construction of a shopping area at the corner of Avenida del Convento and Congress Street, and to have a full slate of tenants by the time the Tucson Gem, Mineral & Fossil Showcase comes to town in February, the elder Dixon said. For the new development, Dixon said the company is hiring an engineering firm to do the infrastructure work and hopes to submit its plans to the city by January for permits.

Gadsden's proposal includes 400 homes — 17.5 percent of which will be affordable housing and 17.5 percent "work force housing" — and a 125-room boutique hotel, along with commercial development, including restaurants, stores, office space and medical office space. "Affordable housing" is housing available to those making up to 80 percent of the area's median income, and "work force housing" is available to those making up to 125 percent of the area's median income.

In addition, the westernmost station of a planned streetcar connecting the University of Arizona with the west side of Rio Nuevo, the city's Downtown revitalization project, will be located on the site. The elder Dixon said the streetcar is key to making the site a place for affordable living. In addition, Gadsden will build some of the streetcar line on its property and be reimbursed for the work, which Dixon said will help sell the streetcar plan to the Federal Transit Administration as a public-private partnership, a key component of getting federal funding for the streetcar.

The city put out a request for bids in early 2007 for developers interested in building there. Three developers submitted proposals in late June 2007, with the Gadsden Co. and Portland, Ore.-based Williams and Dame chosen as finalists in August. Williams and Dame withdrew.

City Councilwoman Regina Romero, who represents the area, said the Gadsden development would be a welcome addition to the area, especially given the low-income and work force housing proposed there. In addition, Romero said the developer agreed to have a 1 percent deed-restricted transfer fee on most units, which is expected to generate $1.3 million for the city's affordable-housing trust fund after the initial round of sales. That is on top of the $250,000 the developer has already pledged to the trust fund, which Romero said was "amazing."
 
Last edited:
The institute of " Biological Diversity" should be called The institute of

Biological
"' STUPIDITY " :uhh: :uhh: :uhh:



Just in case you missed it. This Whack-job institute is trying to step on the already downward spiraled real estate market, by

suggesting that a particular "SNAKE" be listed as an endangered species. This however will require hundreds of square miles of land between

Tucson & Phoenix and also in and around the cities to be off limits to development, which is where they claim the snake to have its habitat.



This story also came out recently in the Tucson citizen paper. & To add to this, ARIZONA TITLE LOANS HAS SHUT ITS DOORS, and now

at least 100 or so people are out of a job. And now this brainless institute want to add more insult by trying to list a particular snake as an

endangered species. Keep in mind, this is the same group that had delayed construction of a high school ( IRONWOOD RIDGE) all for the sake

a bird (Pygmy owl). Was this bird going to bring people AN EDUCATION OR JOBS,

Likewise, is this snake going to REVIVE THE ARIZONA ECONOMY.

Its no wonder why this whack job institute has SHIT FOR BRAINS:

They dont even value education for crying out loud.:koko: :koko: :koko:


Now Im all for some kind of open space ( kind of like the way development in the Catalina foothills has turned out to be which consists of large

patches of Desert between strips of homes), or the protection of mountain ranges from a rich guy buying the land that immediately surrounds

them. But to shut off just about everypiece of open space in what called "THE GOLDEN CORRIDOR" is absurd. The economy of Arizona is mostly

based on "new growth". We cant become stagnant (no growth) and expect more jobs to come on the market or expect the local economy

to improve soon. I believe in Growing Smarter but not SHUTTING OFF GROWTH COMPLETELY, which is what this STUPID ASS biological institue

is trying to do. What a bunch of recluse, wack-job, foul smelling, gap toothed idiots, who would rather
see people

get" SNAKE-BITTEN" than to see the local ecomomy improve. The economy is fueled partly by "new growth", which requires " LAND".
 
Last edited:
Facing the potential loss of state-approved TIF money, Wednesday was a day of action for the City Council, as they decided to fund all the major Rio Nuevo projects (at least partially) by selling over $453M in bonds over the next several years. However, nearly 40% of that amount won't be available until 2014. (Of course, the big question is whether this significant long-term commitment by the city will stimulate substantial private development downtown in the near future to complement these civic improvements.)



Rio Nuevo to receive $453.5M in bonds
City Council vote aimed at pleasing state, public

By Rob O'Dell
ARIZONA DAILY STAR
08.07.2008

Pushing to make Rio Nuevo Downtown redevelopment a reality, the City Council on Wednesday unanimously approved nearly $454 million in bonds — to be sold over the next six years. It is anticipated the money would fund all of Rio Nuevo's planned major projects. Almost $277 million would be funded in two or three bonds sales between now and 2010. The remainder of the bonds, which would be repaid from Rio Nuevo's special sales tax receipts, would be sold in 2014. City financial planners estimate interest on the bonds will be about $302 million. Even with the interest payments, they calculate Rio Nuevo will have $190 million left over after the bonds are sold.

Although it has long been estimated Rio Nuevo's special taxing district would bring in about $600 million, the financial advisers said that figure is based on current dollar values. With inflation through 2025, when the taxing district expires, they say the actual take will be closer to $961 million. Rio Nuevo Director Greg Shelko said the bond approval should show the Legislature the city has "made serious progress" with Rio Nuevo, and it is doing everything it can to make Downtown redevelopment happen. There have been rumblings from members of the Legislature about taking back the money diverted from the state budget for Rio Nuevo because of the city's lack of progress.

The mood was celebratory in the council chambers after the vote. Calling the council's approval to go out for the bonds "magical," Councilman Steve Leal said the council should meet with Pima County legislators soon so "clouds are displaced permanently" over Rio Nuevo's future. During the two-hour discussion, several officials defended the city's expenditure of more than $77 million on Rio Nuevo since 1999, which critics contend is a high price for a small amount of progress. "It's clear to all of us the city has and can account for every penny of Rio Nuevo money spent to date," Shelko said. "The money is accounted for, and the money is going to good things." He noted, "We all feel urgency," but said people have to realize it takes decades and not years to revitalize a Downtown. Despite growing community pessimism toward Rio Nuevo, Shelko said the city can start to change the public mind-set if it delivers a more positive message from Wednesday's action.

Councilwoman Regina Romero said much of the money went to remediate a former landfill on the West Side. Others, including Mayor Bob Walkup, said the city's $77 million has drawn private investment Downtown. "One of the things this doesn't reflect is private investment," Walkup said. "That would leave you to believe this ($77 million) is the whole thing, when it's not."

The city's bonding plan allows for construction of all the major Rio Nuevo projects — a new arena, a University of Arizona Science Center, the Arizona Historical Society Museum and the re-creation of Tucson's birthplace, the Mission San Agustín — by staggering the funding over several years for each project. The science center would get $65 million in 2009 and $60 million in 2014, and the arena would get $10 million in 2009, $50 million in 2010 and $40 million in 2014. The mission is to receive payments of $3 million in 2008, $11 million in 2009 and $11 million in 2010, and the Historical Society would get $3 million in 2008, $2 million in 2009 and $40 million in 2014. Other major projects, including a publicly financed convention center hotel and refurbishing the Tucson Convention Center, would get $10 million each. Shelko said the convention hotel would also be funded with separate bonds based just on revenues from the proposed 700-room hostelry.

Councilwoman Nina Trasoff said partners in the non-city projects must find a way to create a "bridge" between the city's subsidies to make the financing for their projects work. "Bridging allows us to do virtually everything we want to do," Trasoff said. "I'm really pleased with how it is being sequenced." Shelko said spreading the payments over time "allows us to do everything. We don't have to say no to anyone."





A Tucson Citizen article notes that TIF district revenues will need to increase fourfold by 2025 to cover costs for the Rio Nuevo projects approved for funding by the City Council:


Rio Nuevo work banks on big revenue hike
by TEYA VITU
Tucson Citizen
08.07.2008

The Rio Nuevo plan to bond for $453 million to revitalize downtown depends on sales tax revenue quadrupling by 2025 in downtown, along Broadway and at Park Place and El Con malls. Financial adviser Shawn Dralle projects that Rio Nuevo tax increment financing, which is based on sales taxes, will grow from $16 million this year to $64 million in 2025, which would raise a projected $650 million for Rio Nuevo in the next 17 years.

Dralle also estimates $128 million in Rio Nuevo construction sales taxes through 2025 and $183 million in new TIF revenue from Rio Nuevo projects.
These revenues allow for issuing six bonds in 2008, 2009, 2010 and 2014 to fund $453 million in downtown projects. They would incur $303 million in interest payments. "(These projections) are meant to show what are the possibilities in the district," Dralle said. The largest bond amount, $125 million, would go to the University of Arizona Science Center/Arizona State Museum, with another $100 million dedicated to the city's new arena.

The big caveat is that half the funding for the science center and much of the bond money earmarked for the Arizona History Museum and the Tucson Children's Museum won't be available until 2014. If those entities can find their own money, they can start building whenever they want and will be reimbursed in 2014, said Jaret Barr, assistant to City Manager Mike Hein. Rio Nuevo director Greg Shelko said the partial funding was a "way of not saying no to anyone." "We have to find a way to carry our debt (for the arena) to 2014," Shelko said. "We're all going to work hard to get some bridge funding."

Council members were relieved to see a funding plan, but they were frustrated that the community doesn't understand how $77 million has been spent with no grand monuments to show for it. Councilwoman Regina Romero pointed out that nearly $20 million was spent on landfill removal and archaeological work at the Tucson Origins site on the West Side.


BOND PLANS
The city is looking to issue six Rio Nuevo bonds between now and 2014 for a combined $453 million

Series 2008 bond for $73.175 million
• $10 million for the Cushing Street Bridge to Tucson Origins
• $9 million for the Clark Street freeway underpass
• $5.4 million for Tucson Origins archaeology, landfill removal and flood control
• $3 million for Mission Gardens
• $17.3 million for Tucson Origins garage
• $3 million for construction drawings for Arizona History Museum
• $1.2 million for construction drawings for Tucson Children's Museum
• $7 million for downtown infrastructure
• $13.6 million for Depot Plaza garage
• $3.635 million to refund the Fox Theatre bond

Series 2009 bond for $112.5 million
• $65 million for half the cost of the University of Arizona Science Center/Arizona State Museum
• $2 million for construction drawing for Arizona History Museum
• $2 million for infrastructure work in Barrio Sin Nombre neighborhood along Grande Avenue
• $11 million for Mission San Agustín
• $500,000 for a West Side library inside the Arizona History Museum
• $10 million for construction drawings for the Tucson Arena
• $10 million for construction drawings for Tucson Convention Center renovations and hotel
• $2 million for Barrio Viejo flood mitigation.
• $10 million for downtown infrastructure

Series 2010A bond for $80 million
• $10 million for TCC renovation and hotel work
• $50 million for Tucson Arena construction
• $10 million for parking and infrastructure improvements at TCC
• $10 million for downtown infrastructure

Series 2010B for $11 million
• $11 million for Mission San Agustín

Series 2014A bond for $64 million
• $40 million for Tucson Arena construction
• $10 million for parking garage
• $12 million for downtown infrastructure
• $2 million for Tucson Museum of Art parking

Series 2014B bond for $113.3 million
• $60 million for UA Science Center/Arizona State Museum construction
• $40 million for Arizona History Museum construction
• $8.8 million for Tucson Children's Museum construction
• $4.5 million for a West Side library

Source: City of Tucson
 
Last edited:
As expected, the City Council green-lighted a $3.3M sale of 14.3 acres in the Mercado District west of I-10 to the Gadsden Co. for a $300M mixed-use development, along with specific performance requirements:



GadsdenColot.png



Downtown land sale OK'd for hotel, offices, 400 homes
Fourteen acres to be sold for $3.3 million to build $300 million eight-block community

by TEYA VITU
Tucson Citizen
08.07.2008

The City Council on Wednesday agreed to sell 14.3 acres of prime vacant West Side land to The Gadsden Co. for $3.3 million to build a $300 million eight-block community with 400 homes, a hotel, retail and offices. The plot is the final city-owned property on a 62-acre rough landscape just south of Congress Street and west of Interstate 10. The area includes the proposed Tucson Origins museum complex and the 99-home Mercado District of Menlo Park, which is being developed by the same Tucson-area family behind The Gadsden Co.

The development agreement between Gadsden and the city calls for the developer to build about 400 homes with 70 priced as affordable housing (for people earning less than 80 percent of median income) and 70 priced as work force housing (for people earning between 80 and 125 percent of median income). Affordable housing applies to people making 80 percent or less of the city's median income, which is $29,000 for one person and $45,000 for a family of four.

Gadsden, headed by Jerry Dixon, may acquire the land in four phases over about five years with a March 31, 2009, deadline to buy the first of eight parcels. Each phase also comes with required progress with construction. City Manager Mike Hein late last year insisted on adding precise financial penalties if development milestones are not met by defined dates. The Town West development agreement for the El Mirador condo-hotel proposal near Sixth Street and Stone Avenue was the first to include rigid deadlines. Gadsden is required to pay for a $250,000 performance bond when buying the first phase of the 14.3 acres and an additional $250,000 bond for the second phase purchase, which must close by March 31, 2011. "This bond will be at risk until the last block of real estate is conveyed," Hein wrote in his memo to the City Council. "These deposits are to ensure the project is built out in conformance with the approved plans . . . and that it is done in a timely manner."

Along with the 400 homes, Gadsden plans to build a 125-room boutique hotel, a specialty grocery store and a public market that would include a six-screen theater, said Adam Weinstein, a Gadsden partner. The plan is to build the entire project in five to six years, though economic conditions could hamper the project, Weinstein said.
 
Last edited:
Although approved for a one-year extension, the city is imposing additional costs on Town West for delaying the site purchase for their El Mirador condo/hotel project on downtown's north side:


ElMiradorsite.png



Developer gets 1-year extension on condos
City could get $200K; parking garage is part El Mirador hotel deal

by TEYA VITU
Tucson Citizen
08.07.2008

Town West Design Development may pay as much as $200,000 for an extra 12 months to close on the purchase of city-owned land to build its three-tower El Mirador condo-hotel complex at the north edge of downtown. A development agreement with the city called for Town West to buy 3.6 acres near Sixth Street and Stone Avenue for $700,000 by June 2009, but the developer asked for 12 additional months because of "current unfavorable market conditions."

The City Council on Wednesday agreed to the delay in exchange for Town West adding $100,000 to the $1.6 million it had pledged toward Steinfeld Warehouse renovations and adding $100,000 to the $250,000 Town West would have to pay if Steinfeld renovations are not completed within four years. Steinfeld is across Ninth Avenue from the proposed El Mirador. "We wanted to make sure, them asking for 12 months, we get something in return," said Councilwoman Regina Romero, whose ward includes the El Mirador site. Town West plans to build three joined towers rising seven, 11 and 15 stories between Ninth Avenue and Stone, and a separate building west of Ninth that steps up from two to three to five stories. The developers propose about 220 hotel rooms, 150 condos and a brewpub operated by Nimbus Brewing Co.

Romero primarily brought the development agreement to the City Council to nail down a parking garage agreement with Town West. The city would build a parking garage with about 625 spaces and Town West would lease 220 spaces for hotel employees and guests for $30,000 a year. The council approved charging condo residents $58 per month for one space and $80 per month for a second space. "They wanted the city to subsidize two parking spaces (with condo tenants paying) $58 each," Romero said.

The development agreement calls for El Mirador to be finished by November 2012 - or November 2013 if two permitted six-month extensions are used. This 12-month extension is separate from the six-month extensions spelled out in the development agreement, City Attorney Mike Rankin said. The agreement spells out a series of design and construction deadlines, each requiring a $15,000 bond from Town West. The developer will have to make bond payments for as much as $390,000 to guarantee completion of El Mirador. The first $15,000 deadline comes Aug. 27 when conceptual architectural and development plans are due.
 
While Tucson twiddles its thumbs, its northwest suburbs are aggressively courting its cultural attractions--Marana is contemplating a new MLB spring training complex, while Oro Valley could snag a Tucson Museum of Art satellite:



Maranaspringtrainingsite.png
Maranagravelpitsite.jpg

A 600-acre parcel now dominated by two gravel pits is the proposed site for a mixed-use development that would include a new baseball complex for spring training.
(photo: Jim Davis / Arizona Daily Star)



Site of 2 gravel pits in Marana area proposed for spring-training complex
Development could have 2-team stadium, 16-field practice facility, hotel, golf course

By Brian J. Pedersen
ARIZONA DAILY STAR
08.07.2008

The impending departure of the Chicago White Sox has left spring training baseball in Tucson in a hole. But a local developer is proposing to use an actual hole in the ground to stop the major-league migration out of town by building a new baseball complex on the Northwest Side. A 600-acre parcel west of Interstate 10, between Orange Grove and Sunset roads — now dominated by two gravel pits — could be the perfect spot for a mixed-use development that would include a two-team baseball stadium and a 16-field practice facility, developer David Graham said he believes. The development would also include a resort hotel and an 18-hole golf course built into a pit that is still being mined by property owner CPC Southwest Materials Inc.

Local officials and community leaders would like to recruit more teams to Tucson, but their efforts have been hampered by the lack of facilities. "I'm a great believer in turning something ugly into something beautiful," said Graham, who is operating under the name of Orange Sunset Management LLC. "Both of those pits are not the nicest things to look at. The owners would like to do something with those two holes in the ground. " Graham, who was the creative force behind converting a former gravel pit at Continental Ranch into what is now the Pines Golf Club at Marana, said building baseball fields in a 20-foot-deep pit will allow the slopes of the pit to be incorporated into the design as natural viewing areas for spectators.

The site is on land currently within Marana, unincorporated Pima County and Tucson, going from north to south respectively. Graham said he believes this is a plus for the project because it would require all three entities to be involved in the planning. "This is a regional problem that requires a regional solution," said Graham, noting he has had informal discussions with officials from each government. "All three jurisdictions are aware of this project at varying levels," he said.

A regional effort to keep spring-training baseball alive in Southern Arizona has been under way since November 2006, when the White Sox announced they were breaking their lease at Tucson Electric Park to move into a new two-team complex in Glendale in 2009 or 2010. In April, the Pima County Board of Supervisors approved the formation of the Pima County Sports and Tourism Authority. The group, made up of local business and community leaders, has been looking for ways to keep the Arizona Diamondbacks and the Colorado Rockies from following the White Sox out of town, in addition to seeking additional major-league teams to train here. That group is trying to get the state Legislature to pass a bill authorizing a county election on a sales tax to fund renovations to TEP and Hi Corbett Field and for the construction of new facilities.

A bill was introduced late in the last legislative session but was not brought up for a vote. The gravel pit location is the second potential stadium site proposed by private developers. The first, identified in March, was suggested for northwest of the I-10/Tangerine Road interchange on land owned by Colorado-based MSP Properties, though owner Marcus Palkowitsch said no formal plans for a stadium exist. "We haven't put any pen to paper," Palkowitsch said. Although both proposed sites fall either partially or entirely within Marana, that doesn't mean Marana is the only place with options for a new stadium, Sports and Tourism Authority Chairman Tom Tracy said. It just means private landowners in that area have been the first to come forward with ideas.

"At some point, after our funding is in place, we're going to reach out to any and all people who would like to make a proposal," said Tracy, who spoke to the Marana Town Council Tuesday night during a special meeting to discuss spring training. "We are excited that Marana wants to be a part of the solution." Marana's extensive freeway frontage, much of which is still undeveloped, makes the town an ideal spot for a baseball complex, Marana Mayor Ed Honea said. "It's really about location," Honea said. "Spring training teams like the idea of being on I-10. You can drive from Tempe to Tangerine Road in an hour and 15 minutes." The Orange Grove/Sunset project could be done as early as 2011, Graham said, assuming all agreements needed for the development were in place by the end of this year or early in 2009. That includes getting the Regional Transportation Authority to move up its timetable for extending Sunset west from I-10 to Silverbell Road and building a bridge over the Santa Cruz River. That project is currently slated to begin no earlier than 2017.

Graham's development would also likely require bank protection work to be done on parts of the Santa Cruz and Rillito rivers and the Cañada del Oro Wash, all of which run through the property. Graham said no formal talks have occurred on that subject. "That's one of the items on the list," he said. The county is aware of the gravel pit idea, but no formal presentation has been made to county officials, County Administrator Chuck Huckelberry said. Huckelberry said he doesn't know whether the project is a viable option. "Anything is possible," Huckelberry said. "I just view it as another development proposal right now." City of Tucson officials did not return calls made by the Star for comment.




Oro Valley courts Tucson Museum of Art
By Lourdes Medrano
ARIZONA DAILY STAR
08.07.2008

Oro Valley officials are working on an incentive package that might entice the Tucson Museum of Art to expand to the town. "We've identified six sites, some public, some private," said Town Manager David Andrews, who declined to divulge the locations. "We just need to look at the feasibility of those and determine what the museum of art's level of interest might be." On Friday, Mayor Paul Loomis, Andrews, other town officials and area business leaders met with Robert Knight, the museum's executive director. Knight plans to make a formal presentation to the Town Council at its Sept. 3 regular meeting, said Oro Valley spokeswoman Mary Davis.

Museum officials also have visited Marana, but the town does not have a proposal in the works, said spokesman Rodney Campbell. Although it's premature to talk about specific plans to attract the museum, Andrews said, one option may be for the town to provide land to the museum while the private sector makes its own contribution. "It could be that the private sector might want to put together some funding and then buy a private parcel," he said. The museum would be a great community entity and a boost to preservation arts projects such as Steam Pump Ranch, he said. The private sector would benefit, he said, because the more amenities a community has, the greater its chances of recruiting and retaining employees.

Knight was traveling and could not be reached to comment. But museum spokeswoman Meredith Hayes said Oro Valley is one of several sites museum officials are considering. The museum has outgrown its Downtown location, where parking and directional signs have been long-standing concerns, Hayes said. "What we've been doing is looking at expansion opportunities," she said. "We've got opportunities with a number of major collections that could be given to the museum, and we need space to display those."

Hayes said that in May the museum's board of trustees directed Knight to continue working with the city to resolve some of the issues affecting the Downtown location, as well as look toward long-term expansion. "There could be even a satellite location out there," she said of expanding to the Northwest Side. No immediate decisions are expected in September, when Knight reports his findings to the board, she said. "We've got so many options on the table that it behooves us to really look at each one of those options and find out what is best for the museum and for the community as a whole," Hayes said.
 
^ It should be an absolute no-brainer, keeping the art museum Downtown. Or, at least somewhere in central Tucson. Considering places like Oro Valley or Marana is simply ridiculous and stupid to me, especially for a facility/ institution like that.

Does anyone truly advocate for downtown Tucson down there? You know, people with some teeth? Instead of trying to construct $300 million skybridge museums, spanning the interstates, why not start with something a little more realistic in the meantime?
 
^ It should be an absolute no-brainer, keeping the art museum Downtown. Or, at least somewhere in central Tucson. Considering places like Oro Valley or Marana is simply ridiculous and stupid to me, especially for a facility/ institution like that.

Does anyone truly advocate for downtown Tucson down there? You know, people with some teeth? Instead of trying to construct $300 million skybridge museums, spanning the interstates, why not start with something a little more realistic in the meantime?


I think the article inferred that TMA plans to keep the main museum downtown and look to add a satellite location elsewhere, as they have no room to expand at their downtown site. However, this is happening only because they couldn't work out a deal to use part of the nearby Pima County Courthouse.

As far as other downtown development, I think the bond measures passed by the City Council on Wednesday should get some major civic projects jump-started; however, given Rio Nuevo's history, don't hold your breath until actual construction begins.
 
"Facing the potential loss of state-approved TIF money, Wednesday was a day of action for the City Council, as they decided to fund all the major Rio Nuevo projects (at least partially) by selling over $453M in bonds over the next several years. However, nearly 40% of that amount won't be available until 2014."
Keep in mind that this is a plan to sell bonds-not the actual issuance thereof. Back in May 2007, the Mayor and Council approved a plan to fund the various downtown projects and obligate all the Rio Nuevo TIF money. That was essentially a pay as you go plan. Now that has been junked and they want to use revenue bonds instead. One has to wonder why last year's plan wasn't any good anymore and whether this one will last any longer. Its also interesting to note in the article how the UofA, which has 2 big projects on the drawing board, wasn't notified of this change. Makes one wonder.
 
The potential of the emerging Mercado District of Menlo Park west of I-10 is certainly intriguing: compact walkable neighborhoods with market-rate and affordable housing, lofts over retail space, a mercado featuring local merchants, significant commercial space, streetcar transportation to downtown and UofA, numerous upcoming cultural attractions within walking distance, etc.

That said, the Gadsden Co. has their work cut out for them to build 1.3M sq. ft. of the district. (Yes, they are adding significant private investment to downtown, but their most recent purchase of 14.3 city-owned acres for $230k per acre wasn't such a bad deal either.)



MercadoDistrictphoto8-08.jpg

First residences in the Mercado District as of August 1
(photo: Tucson Artisan Builders)


MonierBrickyardsrender.jpg

Rendering of proposed Monier Brickyard building to be finished by 2011.
(render: The Gadsden Co.)
http://www.gadsdencompany.com/index_pro_2a.html


Gadsden Rio Nuevo contract signals shift to private development funding
By Ed Egger
Inside Tucson Business
August 8, 2008

To date, the Rio Nuevo downtown redevelopment project has had primarily a public funding emphasis. The focus is on the brink of shifting into a private investment mode as well with last week’s decision by the Tucson City Council to award a development contract to the Gadsden Company for 14 acres west of downtown. The agreement, which includes performance stipulations, was awarded after input from the Menlo Park Neighborhood Association, whose members said they wanted to see the 14-acre tract include affordable housing, a public market, and a mixed-use development.

Council woman Regina Romero said the Gadsden development plan "has really hit the points the neighborhood wanted to see." This is the first time the city has put such a large piece of land within the Rio Nuevo area into the hands of a private company for development. Council woman Shirley Scott acknowledged the extensive public debate about the money spent to date in tax increment finance district monies for the Rio Nuevo project, but said it all was needed to build the groundwork so that private developers can step in. "The number of dollars being invested by private developers far outweighs what the city has put in," she said.

The Gadsden Company espouses a "smart growth" style of development known as "new urbanism," which incorporates walkability, connectivity, mixed use and diversity, mixed housing, quality architecture and urban design, traditional neighborhood structure, increased density, smart transportation, sustainability and quality of life. Adam Weinstein and his wife, Kira Dixon-Weinstein, are partners at Gadsden along with Kira’s father, Gerald Dixon. Weinstein said his company plans to invest over $300 million developing the 14-acre tract in a multi-phase construction approach. Components of the tract are as follows:

The lead-in project will be a mixed use development with 125 residential units — 17.5 percent affordable housing below Tucson market rates, another 17.5 percent for the downtown workforce and the remainder at market rates. This will include underground parking. Another component will feature 120,000 square feet of ground retail space. The next phase will feature a 125-room boutique hotel to be developed by Mexican hotel chain Quinta Real, which has 11 upscale hotels in several Mexican cities. This will be the company’s first hotel venture in the United States. It will have a Mexican look and feel that should draw tourists in its own right, but also will be just one streetcar stop away from the Tucson Convention Center. Weinstein said once the company begins work, the hotel should be finished in about 18 months.

Another phase of the Gadsden Company’s project will offer 170,000 square feet of office space. Weinstein said it is hoped this space can attract a major corporate headquarters to the downtown area. A parking garage will be built in the center of the tract to serve the development. Weinstein said the hope is to capture solar energy on the garage roof and harvest rainwater within the project.

Final steps will include a mixed-use 400-unit residential development with units available primarily at market rates. Around the housing, in the tract’s northwest corner, will be an enhanced Santa Cruz River promenade that will serve as a meeting and recreation point for residents there. "We’ll start with elements that are a little more independent of the marketplace," Weinstein said, pointing out that a great deal of private infrastructure work must be completed before actual building construction can begin. Greg Shelko, director of Rio Nuevo, said it will take a year to approve the planned area development, which must be done before any buildings can be constructed. The Gadsden Company already has two projects in the Mercado district, west of the 14-acre tract.

Work has begun on the Mercado San Agustín on the south side of West Congress Street. The Mercado is unusual in that the Mercado San Agustin Philanthropic Funds, in partnership with the United Way of Tucson and Southern Arizona and the Microbusiness Advancement Center, are helping potential small business owners gain the skills and resources needed to succeed as merchants in the Mercado.

Dixon-Weinstein created the Mercado concept after touring mercados in the United States, Europe and Mexico. She said Tucson’s Mercado will open in January, but before that will have a holiday market under a big tent with a series of events prior to the Mercado’s opening. Already lined up as tenants at the Mercado are Casa Marita Restaurante Argentino, Sonora Snow Cones, Floral Art, Urban Convenience Store, Coffee Shop, El Tutu Taqueria, Farmers’ COOP and Commercial Kitchen, a place for food vendors to prepare their food in a safe, clean, legal environment. In addition, the Mercado will have vendor stalls including Marisol’s Mexican Imports, El Salvadorian Cuisine and Dolce Pastello.

A second, larger project directly south of the Mercado will be the Monier Brickyard Building, which Weinstein said is scheduled to be open by 2011, when the new downtown streetcar system is expected to open. He said the 250,000-square-foot mixed-use building will feature underground parking, office space on the second level and residential rentals on the top level.

When adding up all development planned in the 14 acres east of the Mercado district, plus the Mercado San Agustín and the Monier Brickyard Building, Weinstein said the company will be creating 1.3 million square feet of new development. In response to recent issues over how the city has spent its Rio Nuevo tax increment finance money, Weinstein said much of the money is being spent to create public infrastructure that is essential before companies like his can move into private development.

While past downtown development efforts may have faltered, Weinstein said he sees "some intelligence now being put back into the equation" and that city officials are working hard to make things happen. "Things are just starting to happen at the next level," he said. "We cannot afford a failure. We have to stay steady at it until we get to the finish line."


For more info.: http://www.mercadodistrict.com/, http://www.mercadosanagustin.com/
 
Last edited:
Updates on a few local projects:



Halfway to the Home Stretch
Tucson’s Interstate 10 Widening Accelerates Forward

By Alan M. Petrillo
Southwest Contractor
August, 2008


I-10-Widening-18-08.jpg

The I-10 widening project is on track for a spring 2010 completion.
(Photo courtesy Kiewit/ADOT)


I-10-Widening-28-08.jpg

Seven new bridges are being built as part of the I-10 widening project in Tucson.
Each bridge is being built to allow for future expansion.
(Photo courtesy Kiewit/ADOT)


Just as Tucson's residents are acclimating to detours, the $200 million I-10 widening project reached the halfway milestone. The Interstate 10 widening project, a $200 million, 3.5-year reconstruction and renovation of the freeway flowing through the heart of Tucson, has passed the halfway point and continues on schedule and on budget. Linda Ritter, public information officer for the Arizona Department of Transportation, says the widening is the largest single highway transportation project in the state's history and will expand the highway from six to eight lanes between Prince Road and 29th Street. In the process, the project will build seven new bridges and underpasses at Grant Road, Speedway Blvd., St. Mary’s Road, Congress Street, Clark Street, 18th Street and 22nd Street.

Rod Lane, senior resident engineer for ADOT, says part of the design concept meant raising the roadway because the new bridges are higher - 17 ft compared to 14 ft, plus or minus a few inches. And because the new bridges have been built at maximum span to allow for future expansion, they require a deeper beam. “Typically, the freeway is now raised about 5 ft higher along the southern end of the construction, but not so much on the northern end because the bridges are farther apart,” Lane says. Lane says that the Miracle Mile bridge north of Prince Road didn’t have to be touched because it had previously been constructed with the ultimate design of the roadway in mind.

The I-10 project is so large an undertaking that massive amounts of material must be moved and replaced, Lane says. For example, a total of 68,000 cu ft of Portland cement concrete pavement will be going down on the roadways. Underneath that will be 42,000 tons of base asphalt. The roadway excavation was a major undertaking, with 231,000 cu yds of material being moved, Lane says. “That’s a big hill,” he adds. Another 588,000 cu yds. of material, using fill coming from the roadway excavation, is going into the embankments.

A major hurdle faced by crews was allowing the major cross-streets a freer flow of traffic during the construction period, says Jody Schott, project manager for Kiewit-Sundt joint venture, the general contractor. Kiewit-Sundt was formed by the Phoenix office of Kiewit, which has the majority stake in the venture, and the Tempe, Ariz. office of Sundt Construction. “The cross-street traffic was a big deal and originally we were going to go to one lane in each direction,” Schott says. “But we found that plan wouldn’t allow the traffic capacity we wanted, so instead of a static traffic control setup we’ve done a lot more work by moving traffic through during the day and doing night and weekend closures of some of those streets. That’s been a big challenge and we’ve been successful with it.”

Besides traffic capacity, Tucson has a lot going on during the year, especially in the winter months, Schott adds. “We got caught a little off-guard with the Gem and Mineral Show and also the PGA golf tournament,” he says. “We had no idea how big the Gem and Mineral Show was, but we were able to work around the traffic and not interfere with the show by shifting some work from days to nights.” During the golf tournament, “pretty much everything stopped,” Schott says. “We had to remove some concrete barriers and barricades and shut the project down, but everyone on the job handled it well.”

Schott says the project has a lot of architectural work in the concrete - on cast-in-place walls, bridge columns and abutment walls - making it challenging to have all the artwork blend perfectly. “A lot of time and effort is going into that artwork,” he says. “Originally, we were doing fabrication for the artwork in the field, but changed to a central location, which helped us be more successful. We have rubber form liner shapes made off-site and shipped here, where we pour a sample of each form and provide it to the architect. There have only been a couple of modifications that way.”

Bob Brittain, vice president of HDR Engineering in Tucson, says his firm designed two of the three sections of the project - the northern section from Prince Road to Grant Road and the southern one from Congress Street to 29th Street. Parsons Brinkerhoff of Tucson designed the middle section. “Our biggest challenge was how to maintain the traffic while providing space to build the new part of the road,” Brittain says. “We were completely trashing the old highway and building a new one.” Complicating the design was the necessity to rebuild all the bridges on a longer span, making them deeper and raising the roadway. “The bridge reconstruction has gone very well,” Brittain says. “Contractors have asked us to design a couple of detours to allow them more space on the project, especially in the Interstate 19 area.”

Brittain says the traffic switchover was completed in May, putting two westbound and two eastbound lanes between Prince Road and St. Mary’s Road on the new concrete pavement. “That was originally scheduled to be done in September and the crew was able to accomplish it in May,” he adds. Brittain says the construction team is happy with how smoothly the traffic has been moving on the frontage roads, which were reconfigured to three lanes in each direction. “The fears were that the business driveways would be gridlocked, but many of the businesses have told us the traffic moves well and they like the drop-in business from the higher volume,” he adds.

Key Players
Owner: Arizona Dept. of Transportation
Design: HDR Engineering; PB
General Contractor: Kiewit-Sundt joint venture
Subcontractors/Suppliers: A-Core; Bob's Barricades; Case Foundation; Cemex; Rinker Materials; RMI; Combs Construction; Consolidated Rebar; Contractors West; E.R. Hawkins; Tpac; Schnabel Foundation

Useful Sources
For more project information, visit the ADOT website at www.i10tucsondistrict.com/29toP.html




With Fire Dept.'s parking structure addition, cost of new headquarters jumps to $38.5M
By Rob O'Dell
ARIZONA DAILY STAR
08.10.2008

The price tag for Downtown's new Fire Headquarters has ballooned more than 48 percent to $38.5 million since early 2006. The headquarters, now under construction on the south side of Cushing Street near Granada Avenue, was estimated to cost $26 million when the City Council approved the project in March 2006. City officials said the $26 million figure was based simply on conceptual drawings and the scope of the project has changed since it was first approved, in large measure because of an underground parking structure added to the project that will cost nearly $3.2 million.

The other cost increases result from a $4 million contingency fund for cost overruns, $500,000 for flood control work to prevent flooding in Barrio Viejo, $600,000 to run chilled water lines from the Tucson Convention Center to cool the building, and $800,000 for soil stabilization around the fire station and a nearby sewer line
, Deputy Fire Chief Joe Gulotta said. Gulotta said the 176-space underground parking garage was needed because surface parking for firefighters and the public would be insufficient on the site. Given that a new hotel and city arena could be constructed nearby, the Fire Department can't plan to park at the TCC, and it doesn't want to park in the surrounding neighborhoods, he said. Although running the chilled water from the TCC will cost the Fire Department upfront, it will save the department money each month on energy bills, Gulotta said. The new headquarters should be finished by July 2010, he said.

Councilwoman Nina Trasoff said the station will be a "modern, state-of-the-art fire central" that is "sensitive to the surrounding neighborhoods." The budget had reached $38 million "before we broke ground," she said. At the time the council approved the fire headquarters, City Manager Mike Hein said $26 million was just a rough estimate because there was no blueprint yet for the building.

Councilwoman Regina Romero said she didn't know the cost of the fire station had risen to that level, adding that she would like to see a report on the reasons. But she said the fire headquarters is a good project. The current fire headquarters is next to the Downtown Police Headquarters at 270 S. Stone Ave. Police officials said they would either move some of their functions into the old fire headquarters or knock down the building to expand current police headquarters into that space. The new fire headquarters will house fire administration, Fire Station No. 1 and the department's fire prevention bureau.

The construction cost will be paid for with certificates of participation — which are similar to bonds but don't require voter approval — that will be repaid over 15 years from the money saved from the city's turning its half of the regional library system over to Pima County. Deputy City Manager Mike Letcher said the council approved $26 million in certificate of participation bonds in May 2006 and another $7.5 million in such bonds in January 2007. The city still has to sell more bonds to finish construction, he said.
 
:previous:

Does anyone know what the new fire headquarters will look like? Is there anywhere online to see the plans?
 
Although developer Garfield Traub was selected in a 2007 RFP process to build a new 700-room Sheraton convention center hotel, the project is anything but a done deal, as the city awaits a financial feasibility study which isn't expected until December. (Additionally, the city council's recently approved bond sale did not include any amounts for the hotel, which apparently would be funded later with a separate bond measure.)


Sheratonhotelrender.jpg

The City Council may throw $200 million toward the construction of a
downtown Sheraton Hotel despite opinions that it's just not viable.
(rendering: Garfield Traub)


Rooms Not Yet Available
Competition and uncertainty surround the proposed downtown convention-center hotel

By DAVE DEVINE
Tucson Weekly
July 10, 2008

The City Council may throw $200 million toward the construction of a downtown Sheraton Hotel despite opinions that it's just not viable. Tourists seeking a room downtown shouldn't plan on staying at a brand-new convention-center hotel just yet. At this point, the Tucson city manager's office isn't even certain the project makes monetary sense.

The City Council has approved the construction of a $200 million, 707-room, municipally owned Sheraton Hotel to be partially paid for with funds from the Rio Nuevo redevelopment district. The new hotel would serve a renovated convention center and potentially produce significant revenue to help finance a new arena to be built nearby.

Some downtown investors, however, have serious doubts about the financial viability of the proposed hotel project. "I became convinced four years ago that 300 to 400 new rooms could be absorbed downtown. ... That's a substantial number, and trying to absorb more rooms could be a real potential problem," says Tom Tracy. Based on that philosophy, Tracy, of the Tucson-based The Lodging Company, joined forces with developer Roger Karber and Humberto Lopez, owner of downtown's Hotel Arizona. They proposed renovating the 307-room existing facility, located next to the convention center, and constructing an additional 400 rooms close by.

The city, however, later decided to pursue a competitive process for a new convention-center hotel and eventually selected the Sheraton proposal. While the council at one point investigated purchasing the Hotel Arizona as part of the Sheraton deal, because of disputes between the parties, that prospect now appears to be on life support. Because of that, Tracy says of a rehabilitated Hotel Arizona: "We're moving on and will either redevelop or sell (the hotel). I think it can kick their ass in a competitive market, and there's nothing they can do to mitigate that." Believing the 35-year-old Hotel Arizona can be renovated to first-class standards much more cheaply than a new hotel can be built, Tracy and Karber think a refurbished Hotel Arizona would have a substantial competitive advantage in room-rate charges.

Two years ago--before their recent flare-up with the city--Karber and Tracy hired the C.H. Johnson consulting company of Chicago to look at their 707-room proposal. That report found it to be economically feasible. The city then employed Johnson to review a generic 700-room concept, and the firm similarly concluded it would be practical. (See "The Risks of Revitalization," Jan. 10.) In his June 2007 report to the city, Johnson also states: "At this juncture of analysis, it is assumed that the existing 307-room Hotel Arizona will be part of the solution." This latter report is the only financial-feasibility study on the convention-center hotel that's been publicly released, and it doesn't address the Sheraton proposal specifically.

Jaret Barr, assistant to City Manager Mike Hein, reports that a financial study on the Sheraton by the Chicago office of the HVS International consulting group won't be completed until December. "It absolutely may say (the hotel) won't work," Barr says of this pending study. "It will determine if the project makes sense." Both Tracy and Karber say they are dumbfounded by the city's hotel-development process to date. "I find it amazing that one year after the city issued a request for proposals for development of a convention-center hotel, they are just now trying to analyze its feasibility. The process should have been reversed," Tracy says.

For his part, Barr believes the city's report from Johnson fulfills that requirement. He adds that the upcoming study by HVS will include a look at a range of options for the size of the Sheraton hotel. This study, Barr continues, will recommend a room number for the new hotel which makes the most sense. "I'm not an, 'If you build it, they will come,' kind of person," Barr says. "I want to see all the data." So far, the working assumption at City Hall has been that the convention-center hotel would turn a substantial profit. That conclusion is based on Johnson's earlier work, which shows the new hotel having an occupancy rate in its first year of 65 percent at an average room rate of almost $145. Whether such rates are feasible remains to be seen.
 
NATL GEOGRAPHIC Calls Tucson the best town for Cycling

Not so much development news but good stuff about Tucson.

News article from TucsonCitizen.com

Lots of new adventures found around Old Pueblo
Tucson Citizen
[email protected]
National Geographic Adventure magazine has named Tucson one of the 50 "next great adventure towns" in which to live and play.
The magazine lists the Old Pueblo as Best for Cycling and notes that, "Thanks to an aggressive transportation program, this Sonoran Desert oasis is quickly becoming the Amsterdam of Arizona, with more than 500 miles of pedal-pusher routes linking 128 city parks." The magazine also highlights the Coronado National Forest (Santa Catalina Mountains) on the Northeast edge of town, Mount Lemmon not only as a great winter ski destination but also a rock climbing-hiking-mountain biking magnet in the summer.
The complete list is featured in the September issue that hit newsstands Aug. 12. For the complete online feature, visit www.nationalgeographic.com/adventur...en for the Southwest...maybe even the nation.
 
A redesigned luxury loft complex and an affordable condo conversion project should inject some life into a dreary stretch of Broadway downtown:


44broadway-new.jpg
44Broadway-constr.jpg

A new look for the 44 Broadway lofts, and the former federal courthouse annex under construction
(rendering: 44broadway.com, photo: Tucson Citizen)


JulianDrewFlats-5thAveView.jpg

The Flats condo conversion on the Julian Drew block
(rendering: Rob Paulus)


New housing to give downtown a boost
by TEYA VITU
Tucson Citizen
08.18.2008

Broadway east of Stone Avenue downtown resembles pre-1989 East Berlin with a dispirited jumble of eight surface parking lots, a closed hotel, a few isolated and generally vacant business buildings scattered about, not a single retail shop and a dearth of foot traffic. Downtown's busiest street serves little purpose except for eastbound motorists bound for suburbia. The East Berlin exclamation point is the former federal courthouse annex at 44 E. Broadway, its entire front and back walls stripped away, evoking a postwar ruin more than 21st-century chic.

Yet that very building is on the verge of bringing more modernity than downtown housing has ever seen. At 44 Broadway Lofts, owner James LeBeau and business partner John Dunn are transforming a former courthouse into a $14.1 million luxury lofts complex with a four-story glass wall facing Broadway. A few blocks to the east, Ross Rulney is working with the 1917 western neoclassical revival Julian-Drew Building, 178-188 E. Broadway, and behind it a carriage house and the Tiburon Apartments, to reshape the block as The Flats at Julian Drew Block with condos selling in the low- to mid-$100,000s.

Both projects are represented by Long Realty. Both are opening sales offices Aug. 22. Both developers believe they can bring a diverse socioeconomic crowd to live downtown for as little as $100,000 at the Flats to as much as $1.35 million for a penthouse atop 44 Broadway. Both are bringing European and Asian influences to their designs that could rile some locals but Dunn says Southwest design is "just overdone here." "If we do it right, we'll get a modern street," said Glenn Lyons, chief executive of the Downtown Tucson Partnership. "East of Scott, there's nothing to speak of (now on Broadway). You walk down there and it looks like we tore something down."

Each of those surface parking lots needs a building. Broadway should be a string of buildings on both sides of the street. Lyons himself is working to convert one of the surface parking lots - the county-owned lot behind Chicago Store - into an office building, market or maybe student housing. Rulney does not resort to words of bleakness in describing Broadway, even the surface parking lot across from his Julian-Drew Building. "It's a very unique opportunity," Rulney said. "Today it just screams opportunity."

LeBeau grabbed the opportunity at 44 E. Broadway 3 1/2 years ago and survived a series of partnerships to reconstruct the vacant courthouse building that accomplished nothing. Earlier this year, LeBeau partnered with Dunn, president of Jobax, a Phoenix general contractor now focusing more on Tucson. Dunn pulled LeBeau out of his funk and quickly assembled a new vision for the 44 Broadway project. By March, Dunn was tearing down the north and south walls, exposing all five floors to the elements. "When we took over, it was a nondescript building," Dunn said. "There's gotta be so much more that this building can be."

Dunn will make a former fortresslike structure hospitable by giving the 30 condos 18-foot floor-to-ceiling, wall-to-wall windows on one side. The split-level lofts will have living rooms with an 18-foot ceiling and a bedroom above the kitchen, a dining area and, in some units, a study. Dunn brought in Phoenix architectural designer Ed Keeney to add a penthouse level on the roof with a modern Asian curvilinear clamshell roofline that curves upward and downward. "This is not a look you've had before," Dunn said. "This is a totally new look. It's to bring a lifestyle that hasn't been here before. I call it a cosmopolitan lifestyle. The concept is to be able to see out of the building. You are in an environment that is part of the outside world." At street level, Craig Finfrock, leasing agent at Commercial Retail Advisors, is working with 3,800 square feet that could be a 120- to 150-seat all-day restaurant or a nighttime restaurant "like Barrio Grill or Cafe Poca Cosa" with a separate coffee shop for the daytime hours. There will be an outdoor deck with a swimming pool and outdoor dining area above the restaurant as well as sidewalk dining.

Melissa Black, associate broker at Long Realty, cites economic theory to back her confidence to sell $350,000 to $1.35 million condos in downtown Tucson during a major housing and overall economic slump. "It's based on supply and demand," Black says "There has been little to no supply of this type of offering. We've had interest from people in Boston, New York, the foothills. I've even had a call from a person in Dubai. The skeptics say downtown is a lost cause. It's really not. It's the new frontier."

Rulney had no grand vision when he bought the Tiburon Apartments, 128 S. Fifth Ave., eight years ago. He added the neighboring carriage house and Julian-Drew Building in March 2006 to create an 1-acre plot for what has become a $10 million vision. "It wasn't until I got really interested in revitalizing downtown that motivated me to look at these other properties," Rulney said. "I think the public will be pleasantly surprised sooner rather than later. I think certain projects such as this one have a very high probability for success because it leans toward redevelopment as opposed to projects that cost hundreds of millions of dollars that downtown is not ready to support."

Rulney and downtown architect Rob Paulus plan to spruce up a 1960s apartment complex into a modern condominium for young professionals or college students or empty nesters looking to downscale. They also plan to put a cafe into the carriage house that faces onto the alley that is Arizona Avenue. Paulus will strip out the apartments and give the new condo units wood flooring, much larger windows and modern wiring. "It's definitely a modern refiguring to be more functional and playful," Paulus said. Upper-level walkways will be detached from walls to allow more daylight to reach lower levels. These walkways will look onto the enclosed courtyard, which will have a swimming pool, desert landscaping and sun and shade areas.

Paulus was inspired by a trip to Zurich, Switzerland, for the exterior designs. The outer wall facing Fifth Avenue will have shadow boxes framing the windows and projecting outward 2 to 4 feet. The Arizona Avenue wall will have louvered panels at the edge of the balconies that can slide from side to side to block the late afternoon sun. They expect construction to start in early to mid-2009, based on a successful sales campaign, with condos potentially ready for residents by the end of 2009, Rulney said. "There's nothing like this in this price range downtown," Rulney said.

Two developers are committed to Broadway. Any more willing to make Broadway a signature street downtown rather than the remnant of East Berlin that it is? Glenn Lyons has a 90-space parking between Scott and Sixth avenues awaiting a developer.


For more info.: http://44broadway.com/home/, http://www.juliandrew.com/index.html
 
Last edited:
which bldg was built in 1917?
none look that old in the lower pix.
is there any historic preservation/restoration to this Julian Drew block proj.?
 
which bldg was built in 1917?
none look that old in the lower pix.
is there any historic preservation/restoration to this Julian Drew block proj.?

There was some historical info. on their website this morning when I included the link, but by this evening it had been deleted. You can see a small diagram of the site plan on the revised website, but from what I remember it said earlier, the Julian Drew building facing Broadway is the 1917 historic structure, subsequently converted to the Hotel Lewis in 1937.

The Flats shown in the render facing Fifth Ave. will be conversions of the Tiburon Apartments built in the 60's, and are behind the Julian Drew building and the carriage house. Hopefully, a revised history section of the website will be added back to explain all of this.
 
"Although developer Garfield Traub was selected in a 2007 RFP process to build a new 700-room Sheraton convention center hotel, the project is anything but a done deal, as the city awaits a financial feasibility study which isn't expected until December. (Additionally, the city council's recently approved bond sale did not include any amounts for the hotel, which apparently would be funded later with a separate bond measure.)"



Very good point. As with the arena, which was canceled for a new rfp, this is far from a done deal. Also, the council didn't approve a bond sale. It approved the concept of issuing bonds in the future for various developments. This is a complete turnaround from May 2007 when the then Council dedicated all the TIF revenue for the projects on a pay as you plan. Now its a bond plan. Next year....who knows.
 
Very good point. As with the arena, which was canceled for a new rfp, this is far from a done deal. Also, the council didn't approve a bond sale. It approved the concept of issuing bonds in the future for various developments. This is a complete turnaround from May 2007 when the then Council dedicated all the TIF revenue for the projects on a pay as you plan. Now its a bond plan. Next year....who knows.

I think the council decided to go the bond route for the following reasons: 1. with declining sales tax revenues due to a slowing economy combined with rising construction costs, they realized that significant TIF dollars to start some of these larger projects might not be available for years to come, and that inflation could make these projects prohibitively expensive in just a few years; 2. the council wanted to demonstrate to the state that they are making good-faith efforts to move Rio Nuevo along so as not to lose the TIF backing, and 3. to placate local residents, who see the glacially slow progress thus far with Rio Nuevo as unacceptable.

It also seems that the council has revisited the sequencing of the larger projects. Previously, the hotel had been scheduled first, and so the RFP was put out and a developer selected. This never made any sense to me, as I couldn't envision the new hotel making any money without an expanded convention center and the arena in place to fill those rooms. Now it seems that the TCC expansion and new arena will be built first, which would certainly enhance the new hotel's chances of profitability. However, the actual number of new hotel rooms needed remains to be seen, and will undoubtedly be addressed in the upcoming feasibility study. (Actually, Tucson should take note of how Phoenix got it right: plan for the new hotel and convention center expansion to be completed simultaneously, thus supporting each other.)
 
The $26M 4th Ave. underpass project is now halfway done, with a spring 2009 completion date:


4thAveunderpassconstr.jpg

Sundt workers begin pouring concrete on the upper deck of the North Fourth Avenue underpass.
(photo: Tucson Citizen)


Concrete poured for underpass work
Tucson Citizen
08.30.2008

About 1,000 cubic yards of concrete were poured Thursday night and Friday morning for a deck for a rebuilt Fourth Avenue underpass. The pour marks the halfway point for the $26 million project, which will result in a wider and taller underpass. After the deck pour, crews will shift temporary tracks for Union Pacific Railroad and begin demolition of the south side of the old underpass in November.

When completed in spring 2009, the new underpass will accommodate one lane of motor vehicle traffic in each direction, and tracks for the Old Pueblo Trolley into downtown and, eventually, for a modern streetcar. The underpass also will include lighted and elevated pedestrian walkways. Tucson Department of Transportation officials estimate that it would take about 100 truckloads of concrete to complete the pour.
 