Tucson Development Thread


Tucson Over A Millon People

TUCSON IS OVER A MILLON PEOPLE

BUT!!!!!!!! I dont think THE BRAINLESS NIMBY RECLUSES know that.

Currently Tucson doesnt really have an Identity yet, but a portion of the population has these BRAINLESS NIMBY RECLUSES who puts birds before education.
This doesnt really help Tucsons cause.

A little while ago there was this piece of land that a local school district wanted to build a new high school since conditions at the existing schools were over crowded.
BUT !!!!!!!!!!!! THEN COMES THE NIMBYS

who blocks the construction of that high school (IRONWOOD RIDGE HIGH) I believe, for at least two years because they claimed that there was an
endangered bird (PYGMY OWL) living on the property.


IF YOU GO TO APPLY FOR A JOB AT MOTOROLA OR EVEN THE PHOENIX CHAMBER OF COMMERCE, do you think you will get a high paying job by putting on your application


"I HAVE STUDIED THIS PYGMY OWL FOR SEVERAL YEARS AND HAS BROWN FEATHERS AND PISSES 3 TIMES A DAY AND EATS FLIES"

But yet that took priority over building a school for people to get

EDUCATED !!!!!!!!!!!!!!!!

ITS no wonder why Tucson is in the mess that it is in ( no identiy, little or no downtown life , no pro sports, current sports teams leaving town and NO NEW FREEWAYS) .

A city with a MILLION PEOPLE and only TWO FREEWAYS that dont really even service the main portion of the city is absolutely absurd.

However, you can thank those "BRAINLESS NIMBY RECLUSES" who have nothing better to do than oppose any vital progress and bitch about everything and everybody.

Unfortunately, Tucson is (for the most part )controlled by these idiots,

who wants Tucson to stay small, who dont want any freeways built, who hates or questions a vast amout of vital projects.

The Tucson government is scared of these idiots. Any time the NIMBY RECLUSES disagree with a project, THE GOVERNMENT LITERALLY QUIVERS.

BUT on the contrary I must confess that I kind of like PYGMY OWLS







BECAUSE THEY TASTE LIKE ROAST BEEF WHEN CLEANED AND FRIED !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! :cheers: :banana: :notacrook::yes:
 
/\ WTF?

Well, I tried looking up the Tucson light rail map, but all I found was some seriously outdated "fantasy" maps. Is there a official light rail map/route out there, assuming the thing actually finally gets funding?
 
btw this is a slow thread, whats up with that?!

All we snowbirds are gone for the summer. :cool:

Want me to bring one of these back with me?

898473530_d9db2a9f97_o.jpg

Photo by tyler82
 
Last edited:
^^The Tucson light rail website is another proposal altogether--the planned streetcar line is not light rail like Phoenix is building, but a less expensive alternative, similar to what is in Portland, OR.

Check out the following site for more details, including a map of the proposed streetcar line and stops:

http://www.tucsontransitstudy.com/
 
/\ that video simulation of the street car is really neat! i think it will definately compensate for tucsons highway system
 
A shopper's dream coming soon to Marana

since not a whole lot is going on in downtown right now. heres some news in marana.


A shopper's dream coming soon to Marana
Aug 9, 2007 07:08 PM MST
kvoa

The term "shop till you drop' will soon take on a whole new meaning. That's because plans to build two major shopping malls are in the works for the Marana area. They're expected to bring in big names, and big bucks to the economy.
One center, The Marana Spectrum, will be located east of I-10 and north of Camino De Manana. The 170 acre property should open in late 2009 or early 2010, with over one and a half million square feet of shopping space.
The second center is the Shops at Tangerine. It's a 240 acre property nestled on the west side of I-10 north of Tangerine Road. This will be a high end merchandise center, with 1.3 million square feet of shopping space opening in 2011 or 2012.
Kevin Kish, Marana's Planning Director, is looking forward to the new developments. There are rumors of some high end department stores coming, like Nordstroms. Kish says, "The ranking with the Tucson region hitting the million person mark, the Nordstrom type businesses for retail are now ones that would be looking at the Tucson market." Both shopping centers brag a number of attractions, including movie theatres.

So what are residents saying about the new additions.
Barbara McClure says, "I think it's a negative impact on the community because they need the land for other things."
Raquel Jones is thrilled about the idea of having two new shopping centers.
"I think that's a fabulous idea. I'm excited."
Lance Briere adds, "I'm not a big shopper. If it was up to me, I'd be by myself horseback in the wilderness, but the Town of Marana can use it."
Sharon Larkin says, "It's growing fast and I love it. I don't have to go far to get a lot of things I want to eat and shop."
 
ljbuild, your posts are like looking at a Dadaist collage from the 1920's. Knock it off and choose a font and size and stick with it.
 
ljbuild, your posts are like looking at a Dadaist collage from the 1920's. Knock it off and choose a font and size and stick with it.


If you dont like it DONT READ IT !!! and thats what I'm sticking with:tup:

This is no dam college grammar school.

I have 1 dad 1 mom and 1 boss and you sure as hell aint any of the three.:notacrook:

with that said quit your whining LIKE A DAM 3YR OLD PROBLEM CHILD:yuck:
 
furthermore

And furthermore to that at least I talk about growth issues or
"SKYSCRAPER ISSUES" !!!!!!!!!!! and any thing that pertains to them.
and maybe I"ll comment on some sports issues , BUTI dont sit here and whine like a cry "ME A RIVER" baby :yuck:

about whos posts have the best fonts or "choice words", or nonsense like that.

If you have trouble reading then invest in "READING GLASSES" or simply

DONT READ AT ALL !!!!!!!!!!
 
And furthermore to that at least I talk about growth issues or
"SKYSCRAPER ISSUES" !!!!!!!!!!! and any thing that pertains to them.
and maybe I"ll comment on some sports issues , BUTI dont sit here and whine like a cry "ME A RIVER" baby :yuck:

about whos posts have the best fonts or "choice words", or nonsense like that.

If you have trouble reading then invest in "READING GLASSES" or simply

DONT READ AT ALL !!!!!!!!!!


Please just get lost! If you feel your job is to troll around on other cities' boards and promote your garbage, you've done it - so move along.
 
D-THousingProjects8-07.png



Housing market hurts Rio Nuevo
Key projects promised Downtown are delayed by private developers

By Rob O'Dell
ARIZONA DAILY STAR
08.12.2007

Several key private-sector projects meant to be the backbone of Downtown redevelopment have been stung badly by the housing market downturn and won't be completed until at least 2009, stifling progress for Rio Nuevo. The recent downturn is likely to push private-sector condominium projects back another two years, as at least four of the private residential projects counted on to revitalize Downtown are being delayed or substantially revamped because of the soft market.

In addition, two of the private projects already under construction are dealing with financial stresses threatening their viability to jump-start Rio Nuevo. What's more, the City Manager's Office no longer expects three parking garages associated with three key residential projects to be built before 2009. As a result, the office recently abandoned plans to spin off its Parkwise department into a separate parking authority. "That's really telling," said Downtown lawyer Roy Martin, a frequent Rio Nuevo critic, adding that the Parkwise decision contradicts the optimistic timetables given by developers, city officials and Downtown boosters.

Rio Nuevo Director Greg Shelko has said there would still be demand for high-priced condominiums Downtown despite the market downturn. Councilwoman Nina Trasoff had said visible progress would be made on several private projects Downtown by mid-2007, none of which has materialized. Trasoff said her comments that there would be four construction cranes Downtown by midyear reflected "naivete" that everything would go according to schedule. But she said she still believes all the proposed projects will be built, adding, "It's just taking longer to happen."

Some progress
To be sure, there has been some progress Downtown, including a strong response by developers and hotel chains for a publicly financed convention-center hotel. The city has also begun construction work on rebuilding and widening the Fourth Avenue underpass at the east end of Downtown.

In addition, one residential development — the redevelopment of the former Martin Luther King Jr. housing project — seems to be on track to begin construction in 2007. But the MLK is different from many other projects because Portland developer Williams and Dame is remodeling an existing building and is developing apartments instead of condominiums.

The theory that private residential development would jump-start other redevelopment Downtown hasn't panned out, said Jaret Barr, assistant to the city manager. "It's clear it's not happening," he said. The builders have been buffeted with sky-high construction costs and a declining home market that lowers the amount they can sell for, he said.

Many builders have to charge as much as $400 a square foot — or $400,000 for a 1,000-square-foot condo — to make a profit, Barr said, adding there isn't much of a market for that price Downtown. Barr said no developer wants to be the first to build. "The struggle for us has been to get the first one to go. Everyone wants to be the first in line to be the second person to develop after the first successful project."

Santa Rita Hotel on hold
At least one of the seven projects examined by the Arizona Daily Star seems to have fallen through:
● The renovation of the Santa Rita Hotel into a 66-room boutique hotel complemented with 150 condos and retail space is on hold, and has missed its goal to begin some demolition this summer. The city doesn't expect its parking garage to be built there before 2009.

Co-developer Michael Teufel of Pathway Development said the project is in a "holding pattern" and that he may soon drop out of the project. Humberto S. Lopez, of HSL Properties, said he will likely buy out Teufel and start developing the project in 2008. He may renovate the hotel before building the condos, he said.

Three other projects are behind schedule or face uncertain futures:
● The Post, a five-story 40-unit condo and retail project being developed by Bourn Partners. Developers first said it would start construction in April and then later said it would start by July. Now developer Don Bourn said he would be "thrilled" to start construction by November, because the company still needs to finish obtaining its construction permits and get financing to build.

● El Mirador, an $85 million hotel, brewery and condominium project being built by Town West. It goes back and forth between dying and moving forward on a near-weekly basis, city officials say. Town West lawyer Bob Gugino said he couldn't give any timelines or specifics for the project that features a boutique hotel, 150 condos and retail space other than to say the company is negotiating with the city. The city is unsure if will need to build a parking garage there before 2009.

● Presidio Terrace, a $30 million project that includes 72 lofts, a cafe and neighborhood store. It missed its deadline to begin construction this summer. Developer Peggy Noonan said she expects to begin construction by March, and needs to obtain financing. The city doesn't expect to build a parking garage there before 2009.

Rialto, Mercado stumbling
And the path has become rocky for two projects already under way:

● The developers of the Rialto Block are "regrouping," said Doug Biggers, after he got a new partner to develop the block surrounding the Rialto Theater. Biggers and new partner Don Martin formed a new company to buy off the $1.56 million debt that Biggers owed his previous partner, Tom Powers, who put that debt up for sale. Biggers and Martin expect to complete their plans for retail, apartments and possibly a hotel there by mid-2009.

● Builders of the 14-acre Mercado at Menlo Park on the West Side recently asked the city to waive impact and permit fees and provide security for the Rio Nuevo site because some of the housing projects there are treading water. "We're almost at zero profit," developer Tom Wuelpern said two weeks ago. "We have to think about whether we can survive this storm." The project calls for 100 single-family homes, 160 condos, retail and offices.

Only one project seems on target to start in 2007:
● Developer Williams and Dame seems on target to begin restoration of the MLK housing project by the end of September, turning it into about 90 apartments and retail space. This project is also behind schedule, as last year Williams and Dame said construction would be finished by October 2007.

A need to scale back
Developers may need to change to meet the market. In their bottom lines, many of the financial plans for residential development Downtown assumed the high prices seen during the real estate boom would continue, said local developer Randi Dorman. "Some plans need to be recalibrated" to reflect changes in the marketplace, Dorman said.

Developers need to cut building heights and develop fewer units at lower costs to make the projects pencil out, she said. "They just have to scale back." Dorman said she would also like to see the city give incentives to the first two to three developments to create the momentum for Downtown. She said incentives could include low-cost financing, waiving of fees or subsidies.

Barr said the development community is likely to move away from new construction because it costs so much more than redeveloping an existing building. That is highlighted by the recent sale of the historic Chase Bank Building at Congress Street and Stone Avenue for $80 a square foot, a price not at all possible for new construction, Barr said.

He said private developers may also embrace building apartments instead of condos because they can't sell 1,000-square-foot condos for $400,000. "Just like we're missing the condos for sale, we're missing the apartments for rent (Downtown)," Barr said. "It may be that the rental comes first." The city is looking for a pioneer to be the first to build, Barr said: "People don't seem eager to force it. Getting that first residential property Downtown and getting a private developer to move forward is going to be an exciting moment because no one has been willing to do that."
 
/\ :previous: that article kinda angers me . i mean ya the housing market decline is really nobodys fault, but the developers or city of tucson should of saw this coming. the market goes up and down all the time. even though noone can really predict when it goes up or down it will happen sometime. And when these projects were planned a few years ago, the housing market was great and all hopes were high. the problem is that the city and/or developers should of forced these projects out the doow and to develop faster before any unforseeable events would happen (ie. housing market decline). if these projects were already on the move this yr. the housing market would have no effect on them during construction. i know funding each project is an issue but this should of been analyzed, planned, and allocated years before the project was official. this housing decline could last 2, 12 or 20 years, whatever, the bottom line is that its going to cause a domino effect and slow everything down. the city needs to do whatever to get its downtown "redevelopment" up, moving and over with so we dont to have to call it a "redevelopment" any more. then when downtown can hold itself up business, industries, and other types of growth will come to it without a helping project like RioNuevo. The city can then worry about bigger better things and move on from our downtown problems. :whip:
 
A new 9-story, 330,000 s.f. city/county courthouse complex planned for downtown is scheduled to open in late 2010:


CountyCityCourthouserender.jpg

An artist's rendering of the new county-city courthouse



Courthouse plans go over budget
County-city complex approved to enter final phase of design

by A.J. FLICK
Tucson Citizen
08.14.2007

Design plans for a new courthouse are proceeding even though the project will surpass the $110 million price tag set by a 2004 bond package. An intergovernmental panel overseeing the combined county and city courthouse on Aug. 6 cleared the way for final design plans to be drawn up. The court complex, to be built on a wedge of land bounded by Stone Avenue, Toole Avenue and Alameda Street, will have 10 levels, including a sublevel where in-custody defendants will arrive and depart, as well as secure parking for judges and select judicial staff.

The engineering and architectural firm DMJM, which will build the 330,000-square-foot complex, presented a schematic design in June that established the project's basic concept with a proposed layout, materials and systems. According to the schematic design, the main floor will be above street level and feature a formal entry. Other characteristics of the design:
• The grand scale of the great room creates the feeling of humbleness.
• A glazed, glassed-in north corridor is intended to symbolize the transparency of justice.
Landscaping will include planting of Chinese pistache, red oak, bottle tree, Southern live oak, Ethiopian acacia and featherbush.

The initial cost to build the schematic design was $122.6 million, project manager Gregg Williams told the courthouse panel last week. After a "value engineering" workshop that identified which elements should be retained and which could be eliminated, the cost was cut to $119 million, Williams said. Savings came from shaving the height of the building as well as the height of each floor, moving a truck dock, reducing square footage slightly and substituting electrical heat for hydronic, Williams said. Hydronic systems use panels containing hot water to radiate heat through a building. "I felt that the building was functioning a lot better (after the workshop)," Williams said. The main floor will include offices for the Arizona Department of Motor Vehicles and mental health services.

Visitors will have to pass through a screening station to access upper floors, escalators, elevators, two courtrooms and other offices. An information desk will be open on each side of the screening station. Levels two and three will include file rooms for the city and county courts, two high-volume courtrooms and offices. A walkway will connect the court building with pavilions that will house offices. Each of the higher floors will have six courtrooms each and various offices. The pavilions will not go higher than the third floor.

One of the most important features to court administrators was liberal space for pay stations and other services. Williams said the schematic design incorporates queuing systems and seating for about 100 people at each service station. Next to the court building will be a parking garage that will cost more than $22 million. It will have 16,000 square feet for retail operations and parking for about 780 cars. Pima County facilities manager Mike Tunistra said by eliminating sprinklers and other features, parking garage costs could be cut to $21 million or less. The city is expected to run the garage through its revenue-generating ParkWise program.

During the design development phase, DMJM will plan the complex in more detail, including incorporating solar shading and deciding whether skylights can be installed in the great room on the main floor. The final look of the building will take shape as the planners figure out where and what size to make windows and other architectural features. That phase should take several months.

Talks are continuing on how to fully fund the new courthouse complex, which is expected to open in late 2010.

Additional information
Concepts of what a courthouse should be were incorporated into early planning of the new combined city/county complex. Planners determined the courthouse should:
• Symbolize the stability and authority of the judiciary
• Reflect the dignity of its purpose
• Show that the act of entering is an act of transition from one environment to another
• Portray high aesthetic value, grace and proportion
• Demonstrate the principles of fairness and citizen responsibility
• Have a calm and welcoming atmosphere in which people can gather in search of justice
• Provide an entry sequence that is secure, welcoming and clear
Source: DMJM schematic design

A pre-construction excavation has already set the combined city/county courthouse project back a few months.
The construction site was a city cemetery in the 1800s.
An archaeological survey indicated about 1,100 grave sites; 990 have been identified so far. Almost 500 full human remains and 75 partial remains have been found.
Some of the graves extend under Stone Avenue, which may have to be partially closed at some point, the intergovernmental committee overseeing the courthouse project was told last week.
The excavation was expected to be finished in early November, but because many utility lines also were buried under the construction site, digging is projected to conclude in February.
 
Regents OK city-UA pact for museum, science center
ARIZONA DAILY STAR
08.24.2007

The deal between the city and the UA for a $130 million science center and state museum complex Downtown can now move forward after the Arizona Board of Regents approved the formal intergovernmental agreement Thursday. The unanimous vote follows the City Council's approval of the plan in May.

The agreement calls for a 125,000-square-foot combined science center and state museum to be built on five acres adjacent to the Rio Nuevo cultural plaza immediately west of the Santa Cruz River. The $130 million center will be funded entirely by the Rio Nuevo District Tax Increment Financing. The design phase of the project is now expected to start in September, with construction to begin next summer and a completion date set for summer of 2011.

The science center will feature a digital planetarium, an observatory, an IMAX theater, a mineral museum, a butterfly vivarium and a gallery for exhibits. The new state museum location will feature exhibits on Southwestern peoples and native art and jewelry. The complex is expected to be a cornerstone of Downtown revival efforts.
 
Portland developer Williams & Dame has two irons in the fire in downtown Tucson: they will begin renovating the MLK apartments in September as Phase I of the Depot Plaza project, and have been selected as one of two developers to submit a RFP by November 5 for the 14.3-acre city site next to the new Mercado District:


Mid-Sept. start for MLK apts. work
by TEYA VITU
Tucson Citizen
08.28.2007

Final federal approvals for the sale of the former Martin Luther King Jr. Apartments, 1 N. Fifth Ave., have pushed back the start of renovation to the middle of September.

Portland, Ore., developer Williams & Dame Development Inc. had anticipated starting work on the 1970 complex in late August, but two sets of approvals were needed from the U.S. Housing and Urban Development Department before the apartments could be sold to Williams & Dame, said Jack Siry, deputy director of the city Community Services Department.

The $375,000 sale of the public housing buildings is expected to close in mid-September, Siry said. Matt Brown, project manager at Williams & Dame, said in an earlier interview that he wants to start work the day after the sale closes.

Williams & Dame plans to create a 96-unit market-rate rental apartment complex called One North Fifth. The city will build a neighboring 68-unit public housing tower to replace the MLK units. Those buildings, plus a third market-rate apartment structure to be built by Williams & Dame, make up what will be called Depot Plaza, along Congress Street, Fifth Avenue and Toole Avenue.

The city won HUD approval Aug. 6 to sell the complex to the Portland group, but a second approval was needed to amend the revitalization plan, Siry said. That came Thursday and set the sale process in motion.



2 asked for visions of Congress acres
by TEYA VITU
Tucson Citizen
08.28.2007

Two developers were invited Monday to prepare a formal proposal to develop the 14.3 acres of West Congress Street touted as the largest plot of undeveloped land left downtown.

Tucson-based The Gadsden Co. and Portland, Ore.-based Williams & Dame Development Inc. already have firm downtown commitments. The city placed them on the short list to proceed with the request-for-proposal process for the acreage between Congress and the Tucson Origins project, which will rebuild the Mission San Agustín and erect a number of museums including a University of Arizona Science Center.

Local builder TJ Bednar Homes was eliminated from the process, Rio Nuevo director Greg Shelko said. "They didn't demonstrate a depth of experience commensurate with a project of the scope we envision," he said.

Williams & Dame played a major role in revitalizing a downtrodden warehouse district in Portland as the Pearl District. Its preliminary vision calls for three- to six-story buildings with ground-level retail and residential upstairs, parks and open space and a mercado. The entire project would be oriented to the streetcar line that will be built from University Medical Center and end at this site, project manager Matt Brown said. Williams & Dame already has the development agreement to build Depot Plaza at Congress and Fifth Avenue, which includes renovating the former Martin Luther King Jr. Apartments.

The Gadsden Co. is led by Jerry Dixon, whose son, Justin Dixon, is managing partner at Rio Development, master developer of the 99-home Mercado District of Menlo Park under construction on the neighboring property. Gadsden proposes 400 homes, with 35 percent of them priced for people earning 80 percent to 120 percent of the median wage in Tucson, which is about $30,000. Gadsden also envisions a public market, a 125-room boutique hotel and other businesses that would create 810 jobs, said Adam Weinstein, a Gadsden partner.

Deadline for the detailed proposal is Nov. 5.
 
Last edited:
Downtown hotel, condo, pub project moves ahead

Hey everyone! I'm new on here, but have been following the post for nearly 2 years. This is where I come to get info on new developments in the economic engine that drives Tucson. Here's my first post!:) Looks like this one is moving forward, hope it actually makes it to construction!!:tup:

Downtown hotel, condo, pub project moves ahead
TEYA VITU
Tucson Citizen

Town West Design Development plans to apply for zoning changes next week to pave the way toward building El Mirador hotel, condo and brew pub complex at the north end of downtown.

In a month to six weeks, a development agreement should be finalized between Town West and the city, which owns the land where El Mirador is proposed, Rio Nuevo director Greg Shelko said.
That will spell out a timeline for when preliminary drawings are due and by when construction should start and finish.

The sense is that construction would start in 18 months, Shelko said.
"The agreement is being negotiated right now and is subject to change," Shelko said.

Negotiations include figuring in the volatility of the nationwide real estate market.

Town West architect Raul Reyes two weeks ago said the project is moving forward with the expectation of market upticks before construction starts.
Town West won't own the 3.6-acre properties bounded by Franklin Street, Stone Avenue, Ninth Avenue, Sixth Street and the railroad tracks plus additional land west of Ninth until just prior to the start of construction.
But the developer can apply for a zoning change because the city is facilitating the process, Shelko said.

Reyes wants to change the industrial (I-1) zoning east of Ninth Avenue and the commercial (C-3) zoning west of Ninth Avenue to high-density mixed-use (OCR-2) zoning, except for where the pub would go. He sees industrial (I-2) for that plot.

El Mirador would have three joined towers rising seven, 11 and 15 stories between Ninth and Stone, and a separate building west of Ninth that steps up from two to three to five stories. The project proposes about 220 hotel rooms, 150 condos and a brewpub operated by Nimbus Brewing Co.
In the year that Town West and the city have been talking, the city Environmental Services Department has evaluated the site that served as the main railroad freight, forwarding and shipping terminal from 1901 to 1983.
Two soil samples using a 2-inch diameter sleeve to reach a depth of 6 inches determined the site has arsenic, lead and benzo(a)pyrene levels that require remediation because they exceed the maximum established by the Arizona Department of Environmental Quality.

"We think this is very much superficial," said Lynne Birkinbine, environmental manager in the Environmental Services Department. "It's not a surprise. It's not a big deal. We expect to find anything like this in a railroad area."
The testing found 15 milligrams per kilogram of arsenic, which exceeds to 10 mg/kg maximum set by ADEQ; 1,000 mg/kg of lead against ADEQ's 400 mg/kg maximum; and .300 mg/kg of benzo(a)pyrene against ADEQ's .069 mg/kg maximum.

The environmental cleanup will occur at the same time as Town West begins construction
 
Lopez looking to refurbish now-closed Santa Rita Hotel

Published: 09.05.2007
Tucson Citizen
Lopez looking to refurbish now-closed Santa Rita Hotel

Tucson Business Edge

Local apartment magnate Humberto S. Lopez suddenly is getting an appetite to plow millions of dollars in downtown.
Lopez is in the early stages of bringing life back to the shuttered Santa Rita Hotel, 88 E. Broadway.

He also will will be one of five teams submitting proposals Friday to build a headquarters hotel for the Tucson Convention Center. Lopez's proposal will be the only one working with an existing property, the Hotel Arizona, 181 W. Broadway.

But the Santa Rita Hotel has captured his fancy only recently.
Lopez closed the Santa Rita in August 2005 with the intention of selling the 1904 landmark at Broadway and Scott Avenue.
Developer Mike Teufel and El Charro Café CEO Ray Flores Jr. talked enthusiastically about adding a 99-unit condo tower and creating a combined boutique hotel and condominium complex.

Then the mortgage and real estate blues hit.
"We'd love to develop the property," said Teufel, president at Pathway Development. "We've elected not to because of the market."
Though Teufel still has a contract to buy the Santa Rita, he said the property most likely will be relinquished to Lopez in the coming months.

Lopez isn't waiting, however. He already has an architect and has revived his development company and in a year hopes to have all the approvals to start work inside the Santa Rita.
Lopez, who has owned the Santa Rita Hotel for 30 years, isn't letting the mortgage industry meltdown stand in his way.
"I own the property," he said. "I can't just let it sit there forever. I'm very serious. I gave up (on downtown) for a lot of years until I saw something was going to happen."

He is proposing a 167-room boutique hotel with the intention of investing $50,000 per room. Lopez figures just renovating the building will cost $10 million before the room upgrades.

For the parking garage, Lopez wants to collaborate with the city, citing Rio Nuevo dollars can be used to provide such infrastructure for private projects.
Lopez said he will keep Teufel's plans for a new condo tower, which he may build when the market improves.
 
With four RFP's in hand, Tucson plans to select one of the development teams by late November to build the new downtown convention center hotel. (Hopefully, the final product will end up more attractive than what Phoenix is getting...) :


ConventionHotel-Hiltonproposal.jpg

Hensel Phelps, Hotel Arizona and Hilton
• 709 rooms in two towers, a new 28-story tower and the existing Hotel Arizona
• $166 million
• On land adjacent to the Hotel Arizona





ConventionHotel-proposedHyatt.jpg

Faulkner USA, Southwest Value Partners, General Growth with Hyatt
• 700 rooms
• $188 million
• Located next to the Leo Rich Theater on TCC grounds.





ConventionHotel-proposedMarriott.jpg

Allan Norville and Chris Ansley with Marriott
• 450 rooms, with a 300-room future phase
• $101 million for 450 rooms
• $111 million for 300 rooms
• On land owned by Norville and public land west of the TCC and Interstate 10





ConventionHotel-proposedSheraton.jpg

Garfield Traub with Sheraton
• 707 rooms
• $203 million
• Located on city land next to the main entrance of Tucson Convention Center on Granada Avenue




Four plans detailed for Downtown hotel
Projects include major national chains and would add as many as 700 rooms

By Rob O'Dell
ARIZONA DAILY STAR
09.08.2007

Tucson received four detailed plans for a top-of-the-line convention center hotel — one short of the five expected because two developers combined their efforts into one proposal.

Southwest Value Partners, a real estate investment firm founded by Phoenix Suns majority owner Robert Sarver, and General Growth Properties Inc., which owns Park Place mall, joined Texas-based Faulkner USA in pitching a 700-room, $188 million Hyatt hotel on the Tucson Convention Center grounds. Previously, Sarver and General Growth had proposed a hotel on land owned by another submitter — Downtown landowner Allan Norville. But they had to find another location because they couldn't strike a deal with Norville for his property west of the TCC. Jaret Barr, the city's project manager for the hotel, said the city stipulated developers had to control the land they were proposing to build on, forcing Sarver and General Growth to join up with Faulkner.

City officials hope to choose one of the plans before Thanksgiving. All of the developers said they would use the city's access to low-interest, tax-exempt financing to build the hotel, meaning it would be owned by a public entity and operated by the hotel chain. City officials expect the hotel to be so profitable it will help pay off debt on the proposed new $130 million, 12,300-seat arena planned nearby, in addition to paying for itself.

Three of the four respondents proposed more than 700 rooms, which is what the city asked for. Only Norville and Chris Ansley, the developer of the JW Marriott Starr Pass Resort & Spa, did not propose 700 rooms. They proposed a $101 million, 450-room Marriott hotel that included a future expansion of 300 rooms for $111 million. Their proposal would develop all the publicly owned land between the Tucson Convention Center and Interstate 10, along with a portion of the land Norville owns in the same area. The plan includes offices, restaurants, parking, retail and a gem museum.

Barr said the city's request didn't specifically rule out a smaller hotel, but he was sure the first question to be asked of Norville and Ansley is why the hotel is only 450 rooms. "That's going to be a question they'll have to address," Barr said.

Barr said all developers submitted justifications for their cost estimates and their estimated revenue per room, but Barr said that is proprietary information because of the competitive process. The city is excited about the response because all but one of the proposers suggested a 700-room hotel, which some hotel experts had said was too much for the Downtown area, Barr said. In addition, Barr said, all four of the main convention center hotel operators — Marriott, Hyatt, Hilton and Sheraton — are part of the competition.

The other proposals include an expansion and redevelopment of the Hotel Arizona by Phelps Development LLC and Hilton Hotels. This was the same plan Hotel Arizona owner Humberto S. Lopez and developer Roger Karber presented to the City Council in April. The plans call for a new 28-story tower to expand the hotel to 709 rooms and adding a spa, retail stores, restaurants and convention/ballroom space at a total cost of $166 million.

Texas-based Garfield Traub proposed a 707-room $203 million Sheraton hotel on city land near the main TCC entrance on Granada Avenue. There would be a 14,000-square-foot ballroom to complement the TCC convention space along with a full service restaurant, bar and lounge. It would also include retail space and, potentially, condominiums.

The only developer to propose substantially changing the existing footprint of the area was Faulkner, Sarver and General Growth, who want to wedge their hotel between the Leo Rich Theater and the TCC. The group also wants to move the proposed $130 million arena from the current planned location near I-10 to what is now a parking west of the TCC.

Carl Winston, director of San Diego State University's hospitality and tourism-management program, warned that residents shouldn't decide which proposals they like based on artist renderings supplied by the developers because they are sure to change due to costs and input from city planners. The focus should be on the hotels' financing, developer experience in building convention hotels and how committed the hotel chain is to the plan, he said. "The pictures are always not true anyway," Winston said. "I wouldn't get too hung up on the pictures."

Find more recent articles about Tucson's Downtown redevelopment efforts at azstarnet.com/sn/rionuevo.
 
Last edited:


Back
Top