Tucson Development Thread


I think the whole project is kind of irresponsible giving our location. We have water issues. Data centers require vast amounts of water. Even reclaimed will take a few years to be fully online. Then we still have to deal with the reclaimed water once it's flushed. Data centers use the reclaimed water and that water is then discharged. So where is it being discharged and will it be cleaned? And talk about energy. I wish they'd build a solar farm right next to it to create its own off grid solar energy to supplement TEP. I just think this is a lot of money and work for 184 jobs. And you know the city is paying this company to relocate here. I haven't found out the amount yet...but we do this for every company. We paid Caterpillar $52M to relocated. We paid American Battery Factory 4.3M. We paid that big space balloon company World View Enterprises half a million. No one comes to Tucson without financial incentives. I'd love to know what we're paying for these guys. And a side note...why isn't this data center being built closer to where the effluent water is produced so we dont have to dig an 18 mile pipeline? Like there isn't land off I-19 around Drexel, etc?
 
Pima County plans downtown library move with Wells Fargo building purchase

The Pima County Board of Supervisors is set to vote Tuesday on a contract to purchase the Wells Fargo building in downtown Tucson for $6.2 million to serve as the new main library branch.


https://azluminaria.org/2025/05/29/pima-county-library-move-wells-fargo-building/



Mmn2CR2.jpeg
 
Sonoran Corridor Tier 2 Environmental Impact Statement (EIS) and Design Concept Report (DCR)

The Arizona Department of Transportation (ADOT) is preparing a Tier 2 Environmental Impact Statement (EIS) and Design Concept Report (DCR) for the Sonoran Corridor, a proposed freeway in Pima County that would connect Interstate 19 and Interstate 10, south of Tucson International Airport. The Tier 2 study will develop and evaluate a range of 400-foot-wide freeway alignment build alternatives within the 2,000-foot corridor. The study will also evaluate a “no build” alternative and other design features and environmental impacts and mitigation.

https://azdot.gov/planning/transportation-studies/sonoran-corridor-sr-410-study/tier-2-impact-study-design-concept-report




Y01hazJ.jpeg


wbYUnCy.jpeg
 
This is something I've been mildly curious about and I've found maps that show the following: where the proposed Sonoran Corridor SR 410 junction with I-17 is located (near Sahuarita) is also the location of the proposed I-11 Pima County west option junction with I-17. No surprise there.

At this point it appears that SR 410 will be a reality before I-11, but if the I-11 west option is ever built (given the ongoing litigation absolutely not a slam dunk) it will share an 1-17 interchange with SR 410 just south of El Toro Road.



X0fIm3z.png


ThvyERg.png


89SgVMp.png


pPyd3t9.jpeg
 
Yea....but what makes zero sense is the new North/South Corridor (State Route 505) that goes from Apache Junction, passes by the Mesa Gateway Airport, goes through San Tan Valley connects with I-10 just north of Picacho Peak...when (in my opinion) it should connect with the I-11 west connector just south of Picacho Peak (where I-11 will connect with I-10). It seems more logical driving on the 505 that you would have easy access to connect with both I-10 and then onto I-11.

CmQeyfa.png


omVrsDy.jpeg


hyrCNFu.jpeg
 
What do y’all think?

Yesterday the County board of Supervisors voted to purchase the old Wells Fargo building to potentially move the downtown library across the street, with that being prime real estate downtown not to mention even having a proposal for a new cities tallest ( century tower project) back in the day, what will happen with the library and the conveying property if the county does indeed go ahead with plans to move into the old Wells Fargo building across the street?
The news said it would cost $90 million in repair for a library, do you think they would raze it and build something new or is it going to be a re-adaptive project?

I was shocked to find out it was built within the last 35 years. With the city being the owners of the building do u think they would transfer it over to Rio Nuevo and have them put out an RFP?
 
Well, I loved Part I. IMHO the City of Tucson planners featured as tour guides were excellent. I rode 270 miles on a bike in and around our town just last week. And so over time, I get to see and experience all of the bike facilities in a visceral way. The bicycle infrastructure here just keeps getting better and better and compared to many places I've ridden across the west it is already pretty damn great. Onward.



TUCSON: Exploring the Emerging Cycle Network with City Staff (Part Two)

In Part Two of this on-bike interview and ride-along video, I was honored to join Collin Chesston and Ryan Fagan with the City of Tucson for a tour of their emerging bike network and people-oriented traffic-calmed streets. We examine multiple pedestrian and bicycle crossings, enjoy riding down a new bicycle boulevard installation, and explore several new traffic-calming neighborhood traffic circles and chicanes currently under construction. Also, a huge shout-out to Ben Elias, Tucson Project Manager working on Bike Share, for the impromptu and unplanned cameo.



• Video Link


27jdZTg.png

Original image from West Sweetwater Drive, Tucson.
 
Yesterday the County board of Supervisors voted to purchase the old Wells Fargo building to potentially move the downtown library across the street, with that being prime real estate downtown not to mention even having a proposal for a new cities tallest ( century tower project) back in the day, what will happen with the library and the conveying property if the county does indeed go ahead with plans to move into the old Wells Fargo building across the street?
The news said it would cost $90 million in repair for a library, do you think they would raze it and build something new or is it going to be a re-adaptive project?

I was shocked to find out it was built within the last 35 years. With the city being the owners of the building do u think they would transfer it over to Rio Nuevo and have them put out an RFP?


Great thoughts and questions. IMHO absolutely an opportunity here to do something big. Interesting quotes on this subject in the Tucson Sentinel story below:


Pima County to move Main Library across street into Wells Fargo building

The city property that has served as the Main Library includes an underground parking garage and Jácome Plaza.

The library moving out provides the city with an opportunity to "rethink our Stone Avenue location and re-envision this community space and all the possibilities it brings," Romero said.

"Taken in total, this property has tremendous potential," said City Manager Tim Thomure. "City staff welcomes the conversation with the mayor and Council and will be ready to engage with our Downtown stakeholders and the larger community on a comprehensive plan for the facility."


https://www.tucsonsentinel.com/local/report/060325_main_library/pima-county-move-main-library-across-street-into-wells-fargo-building/





FJcNcrI.jpeg
 
We got options IMOP

Great article thanks for sharing!
I believe this opens up a tremendous opportunity for something great the only other opportunity like this would be the Ronstadt project.
I had no idea that this library how an underground garage
Tbh I hadn’t been at that downtown location since I was a kiddo.

I wonder what can be built there I know people would push back on anything that would take away from Jacome plaza or the green space or trees & rightfully so, I’m a tree hugger so maybe a couple hundred thousand tress to get towards that million tree mark :yes:




Great thoughts and questions. IMHO absolutely an opportunity here to do something big. Interesting quotes on this subject in the Tucson Sentinel story below:


Pima County to move Main Library across street into Wells Fargo building

The city property that has served as the Main Library includes an underground parking garage and Jácome Plaza.

The library moving out provides the city with an opportunity to "rethink our Stone Avenue location and re-envision this community space and all the possibilities it brings," Romero said.

"Taken in total, this property has tremendous potential," said City Manager Tim Thomure. "City staff welcomes the conversation with the mayor and Council and will be ready to engage with our Downtown stakeholders and the larger community on a comprehensive plan for the facility."


https://www.tucsonsentinel.com/local/report/060325_main_library/pima-county-move-main-library-across-street-into-wells-fargo-building/





FJcNcrI.jpeg
 
Great article thanks for sharing!
I believe this opens up a tremendous opportunity for something great the only other opportunity like this would be the Ronstadt project.
I had no idea that this library how an underground garage
Tbh I hadn’t been at that downtown location since I was a kiddo.

I wonder what can be built there I know people would push back on anything that would take away from Jacome plaza or the green space or trees & rightfully so, I’m a tree hugger so maybe a couple hundred thousand tress to get towards that million tree mark :yes:

It's really quite a large plot of land. Back in 2005 there was a proposal to build a 27-story building on the Jacome Plaza grass called the Century Tower so it'd would have been next to the library. Sadly it fell apart. Of course I would love for Rio Nuevo or the city to put out an RFP that requires a certain height...but have it also include a public outdoor space so the city still gets the same park/festival setting they're used to. Maybe something like this.

lVWe2G6.jpeg
 
Absolutely!

Yes this is beautiful I would luv this or anything close to it.
I wonder if the library building itself would be included in something like that rendering u put up? Or if the city would allow it to be knocked down?
The plaza is so important to downtown with so many festivals and gatherings happening there. Would be neat if they put out that RFP and some really great architectural firm & developer from outside the area came up with something like you proposed!
I’m gonna speak it into existence fingers crossed:cheers:




It's really quite a large plot of land. Back in 2005 there was a proposal to build a 27-story building on the Jacome Plaza grass called the Century Tower so it'd would have been next to the library. Sadly it fell apart. Of course I would love for Rio Nuevo or the city to put out an RFP that requires a certain height...but have it also include a public outdoor space so the city still gets the same park/festival setting they're used to. Maybe something like this.

lVWe2G6.jpeg
 
If you want cool new real estate developments in Tucson then excellent news like this must precede it. Household formation and job formation drives everything.


Raytheon wins $1.1B Navy contract to expand missile production in Tucson

Raytheon has won a new $1.1 billion contract from the U.S. Navy to produce advanced missiles, the latest and largest award for the program and a favorable development for Tucson, where most of the weapons will be made.

The contract will boost Raytheon’s yearly production from 1,400 of its AIM-9X Block II missiles currently to 2,500 missiles annually.


https://www.azcentral.com/story/money/business/2025/06/04/raytheon-wins-contract-to-expand-missile-production-in-tucson/84036861007/




NTMRSD4.jpeg
 
Yes this is beautiful I would luv this or anything close to it.
I wonder if the library building itself would be included in something like that rendering u put up? Or if the city would allow it to be knocked down?
The plaza is so important to downtown with so many festivals and gatherings happening there. Would be neat if they put out that RFP and some really great architectural firm & developer from outside the area came up with something like you proposed!
I’m gonna speak it into existence fingers crossed:cheers:

I tried to speak Tucson-Phoenix passenger rail into existence - so far no luck. LOL. Time will tell though. But hey you may be luckier than me.

Yeah, the City has an important downtown tabula rasa here. One can hope the City dreams big.
 
Yea, I dont understand the no-rail between Phx & Tucson. I mean of course I'd love HSR...but just a daily train would suffice at this point. The first goal Tucson really needs to accomplish is remove all road interaction with the RR between downtown and the Pinal County line. Removing any obstructions of cars or crossings would really help with being able for the train to go faster through NW Tucson. They're almost there. Just need interchanges at Cortaro Farms Rd, Tangerine, Sandario/Cochise Canyon Trail. And Granada/Main Street downtown. And then eliminate the small road crossings of 5th St, Joiner Rd & Massingale. Then you have a straight shot from Amtrak downtown out of the city with no interference.
 
Wow, the Arizona Daily Star reports that the executive director of the Regional Transportation Authority has been fired. There's going to be a lot of reporting on this.


Embattled Tucson-area transportation leader terminated

The longtime head of groups that decide how billions of dollars in transportation projects is spent across the Tucson area was fired Thursday.

Farhad Moghimi, the executive director of the Regional Transportation Authority and the Pima Association of Governments, was terminated on a 5-to-4 vote during a joint meeting following a months-long dispute with leaders from Tucson and Pima County over project selection and scheduling, among other issues.


https://tucson.com/news/local/government-politics/article_4e686ffe-8e5b-487d-8357-3da45c0e5e29.html




FarhadMoghimi.jpg
 
Yea, I dont understand the no-rail between Phx & Tucson. I mean of course I'd love HSR...but just a daily train would suffice at this point. The first goal Tucson really needs to accomplish is remove all road interaction with the RR between downtown and the Pinal County line. Removing any obstructions of cars or crossings would really help with being able for the train to go faster through NW Tucson. They're almost there. Just need interchanges at Cortaro Farms Rd, Tangerine, Sandario/Cochise Canyon Trail. And Granada/Main Street downtown. And then eliminate the small road crossings of 5th St, Joiner Rd & Massingale. Then you have a straight shot from Amtrak downtown out of the city with no interference.

At the time of this post ADOT's project website (https://azdot.gov/planning/transportation-programs/state-rail-plan/passenger-rail-study-tucson-phoenix) states the following in pertinent part:

Project Process

Step 1 (Scoping): ADOT is currently working with FRA to develop a scope, schedule and budget to prepare the Service Development Plan for the Phoenix to Tucson Intercity Passenger Rail Corridor. The Step 1 approval is anticipated in spring 2025.

Step 2 (Project Planning): ADOT will prepare a Service Development Plan, in coordination with FRA, and with stakeholder and public engagement. The plan is expected to take approximately two to three years to develop, pending FRA review and approval. Step 2 is anticipated to start in mid-2025.


Well we're into Spring 2025 and so far crickets. Still not done with spring 2025 and we may well move on to Step 2 described above, but I am concerned about the current Federal administration's well demonstrated antipathy towards rail transit. Elections have consequences.

I don't know what's going to happen. I hope common sense prevails. We can't freeway lane our way out of a crowded I-10 at the rate Phoenix and Tucson are growing and the projected rate of trade increase through Nogales.




vNYZP9k.jpeg
 


Back