Southern Arizona economy is growing steadily: Here’s what is driving it

A pivotal development is the construction of American Battery Factory’s (ABF) 2 million-square-foot lithium iron phosphate (LFP) battery cell gigafactory in Tucson. This facility, set to be the largest of its kind in the United States, represents a $1.2 billion investment and is projected to create up to 1,000 jobs, contributing approximately $3.1 billion in economic impact to Arizona.

“In support of battery manufacturing, we will travel to the Battery Show, which is one of the large battery-related industry events,” says Kevin Burke, deputy director of the Office of Economic Initiatives for Tucson. “We also attended SPIE, International Society for Optics and Photonics.”

Burke adds, “We’re expecting [ABF] to break ground in the next couple of weeks. We’ve had a lot of interest from other battery manufacturers and we’re confident that we will turn some of those into actual projects as well.”


https://azbigmedia.com/business/southern-arizona-economy-is-growing-steadily-heres-what-is-driving-it/




206309.2e51da61e454e304695d85bab95fb4e0.JPEG
 
I had no idea Moxy is a hostel hotel. How will this affect Hotel Congress? It's taking up 100 spots of the 290 spots in the Depot Parking Garage...which is probably the most popular parking garage. It's right across the street from the beautiful Amtrak station and restaurant. Now this seems all wrong to me. Luring the wrong clientele to a downtown area already struggling with youth-related issues. I give it 7 years before this "hotel" will be turned into low income housing. This should be a 10 story beautiful hotel. Geez these Tucson developers (Dabdoub and Settler) are only about money and no thought to how it forms and creates a downtown.
 
Sorry to hear the former owner died...but I'm also really sad how terrible the design got. So it went from a 20-story 250 ft really cool proposal called Speedway Gateway for apts and grocery store for all....

To a 19-story, 209 ft student complex called Tucson Theory that looks like a classroom building on campus. So we lost 41ft and got an uglier design. Classic Tucson.

RFKFa7Q.jpeg

I am totally excited by this project. This is dense transit oriented residential development on the eastern end of the streetcar line that no doubt Tucson's peer cities in the southwest would cut off a 'nad to have.

Speaking for myself, I am never trapped by the never built vaporware of ages past - the intellectual rat poison of concepts and renderings that never made it. This project is going to actually get built. I say f'in awesome.

For whatever reason others may hold a lesser opinion of this project and that's obviously completely fine.

And BTW, anything that serves the student housing needs of a top 20 research institution that is a dynamic economic driver in our town is fine by me. Bring it on.

Thanks for reading.
 
TUCSON: Exploring the Emerging Cycle Network with City Staff (Part One)

In this on-bike interview and ride-along video, I was honored to join Collin Chesston and Ryan Fagan with the City of Tucson for a tour of their emerging bike network and people-oriented traffic-calmed streets. We examine several protected and separated bike lanes, look at multiple pedestrian and bicycle crossings, enjoy a beautiful asphalt art installation, and roll past a bunch of very cool traffic-calming neighborhood traffic circles.




• Video Link
 
New (paywalled) article in the Arizona Daily Star on the 19-story development at Broadway and Campbell that will tower nearly 40 feet higher than other complexes near the University of Arizona campus.

The development is named Tucson Theory and, at 209 feet, will be the tallest building in the university area. And it will be the fifth-tallest building in Tucson.

Tucson Theory will be a 686,000-square-foot structure with a mix of floor plans: 52 studios, 59 one-bedrooms, 70 two-bedrooms, 43 three-bedrooms and 171 four-bedroom models.

The demolition permit for The Palm Shadows apartments has been approved by the City.

https://tucson.com/news/local/subscriber/article_21582027-d59e-42a9-860e-7acaef93e7a9.html

hHfzY2u.png

Any idea which version is the right one? I just saw this posted on another site, and then looked it up on the city permit site and shows this. Is one newer than the other? Wonder where Tucson Star got their image.

Smq0SHI.jpeg
 
In-Depth: Tucson developer faces fraud charges over Menlo Park project funds, ordered to pay damages

The Gadsden Company faces multiple lawsuits, and its co-founders, Adam Weinstein and Gerald Dixon, were indicted on 20 federal counts related to wire fraud and money laundering last month. They allegedly defrauded investor AWS Opportunity Funds, which invested over $3 million into the project.

In July, as part of the lawsuit against Gadsden, a private arbitrator determined that the company defrauded the investor and ordered that AWS Opportunity Funds receive more than $3.37 million plus $1 million in punitive damages. This decision was upheld by a Pima County judge this month.


https://www.kvoa.com/news/in-depth-tucson-developer-faces-fraud-charges-over-menlo-park-project-funds-ordered-to-pay/article_194f6d62-fe96-42c5-86c5-061a0e0dbf78.html




• Video Link
 
There's a small proposed infill project at the former Old Pueblo Trolley repair shed and storage yard at 360 East 8th Street. This would enlarge O'Malley's by creating an partially covered outdoor patio seating area. Here's a Google street view quicky screen capture of the subject property:

74lNWra.png



A couple images of the proposal:

uzBNdIa.png


V4khRbi.png



Here's a link to the Special Districts Application: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/boards-committees-commissions/prs/2025/052225/sd-1124-00119-design-package-4-15-25.pdf


There's discussion about it here beginning shortly after the 4:00 minute mark:

• Video Link
 
A little less mystery on the mysterious Project Blue

Pima County releases more on potential impact but not the name of the company

https://www.kgun9.com/news/community-inspired-journalism/southeast-side-news/a-little-less-mystery-on-the-mysterious-project-blue

Water use gave it away - sounds like a big data center. Maybe for Apple? (the secrecy). Could also be something related to semiconductors - but I would anticipate more than 200 jobs after construction.
 
Says after it's built there will be 184 jobs making around 64k. It's not Apple. Just a data center. So it's gonna use a lot of reclaimed water. Where is this water coming from, the power to get it reclaimed status...and then where does it empty to? Any possibility of ground water contamination? Its proven data centers water is unsuitable for discharge without proper cleaning. That area is right next to Vail aquifers. Are we gonna end up with another DMAFB and TIA PFAS well contamination? Says the city will gbet $152M over 10 years in sales taxes. So $15M a year. Not really that much if we have to spend money to clean the reclaimed water.
 
Says after it's built there will be 184 jobs making around 64k. It's not Apple. Just a data center. So it's gonna use a lot of reclaimed water. Where is this water coming from, the power to get it reclaimed status...and then where does it empty to? Any possibility of ground water contamination? Its proven data centers water is unsuitable for discharge without proper cleaning. That area is right next to Vail aquifers. Are we gonna end up with another DMAFB and TIA PFAS well contamination? Says the city will gbet $152M over 10 years in sales taxes. So $15M a year. Not really that much if we have to spend money to clean the reclaimed water.

its my understanding that large data center projects up here in Phoenix at least recycle the water they use. At a very high rate - 90% or more so. TSMC which is semiconductor manufacturing is at a diff scale - to the point where it has its own water reclamation plant onsite. 184 employees for a datacenter is a lot of people - so this project seems to be of a decent size - I would expect them to recycle the water they're going to use. Water will just be used initially if they use a system similar to this: https://www.datacenterdynamics.com/...se-closed-loop-zero-water-evaporation-design/

I'm unfamiliar with the datacenter market in Tucson - so not sure how many there are down there and how large.
 
It’s going to be a 220k SQ Data center it came out in the paper yesterday along side with potentially a missile development company out of California.
The article did question about the water use, one of our councilman said that he has not been briefed about the details of this project yet however the county commissioner did say in a memo that all of those questions have been addressed per meetings with the contractor and lender for the project last week.

This looks to be like one huge project with several different large sized buildings around that size at full build out? there was three conceptual design options for the county to choose from. It was on a well known Arizona development website “abex” last month it had one of the conceptual’s on there as well as potential uses.

I’m really curious on who it is and I hope that we land all of these potential projects and companies moving to Tucson. I am not the biggest fan of data centers due too the water / energy consumption not to mention the lack of true jobs after construction is completed but it’s something positive for the city.






its my understanding that large data center projects up here in Phoenix at least recycle the water they use. At a very high rate - 90% or more so. TSMC which is semiconductor manufacturing is at a diff scale - to the point where it has its own water reclamation plant onsite. 184 employees for a datacenter is a lot of people - so this project seems to be of a decent size - I would expect them to recycle the water they're going to use. Water will just be used initially if they use a system similar to this: https://www.datacenterdynamics.com/...se-closed-loop-zero-water-evaporation-design/

I'm unfamiliar with the datacenter market in Tucson - so not sure how many there are down there and how large.
 
I’m really curious on who it is and I hope that we land all of these potential projects and companies moving to Tucson. I am not the biggest fan of data centers due too the water / energy consumption not to mention the lack of true jobs after construction is completed but it’s something positive for the city.

Article in Friday's Arizona Daily Star dealing with the water issue contains these short quotes:

The proponent of building at least one data center on Tucson’s far southeast side is negotiating with Tucson Water to have an 18-mile pipeline built to carry reclaimed, treated sewage effluent to the project, two Pima County supervisors say.

A company negotiating with county officials would pay to build this line as a way to ensure the project doesn’t drain Tucson’s drinking water supply, said Supervisor Matt Heinz, whose district ends about a mile west of where the data center would be located.


One data center is currently being discussed, but a specific plan for the site filed by county officials shows the entire 290-acre project site eventually could contain as many as 10 data centers.

https://tucson.com/news/local/environment/article_6ba38bdf-7752-46cf-8586-6acc9d562ce8.html
 