Tucson Development Thread


This is going to be one huge building as that lot is MASSIVE.

The render is probably a bit deceiving since the office tower will occupy only the northern third of the block. With total square footage of 170k, each floorplate will be less than 19k s.f.--not exceptionally large for office buildings.

As noted in the article, the middle third of the block will be a parking structure and the southern third reserved for a separate development--probably the residential component.
 
UniSource Energy Building

From TEP's official press release, here are three more renderings of their new headquarters building. It's not the most striking architecture, but has a good mix of glass, stone and shade, and will be a significant addition to the east side of downtown. (And hopefully the ground-floor retail will be easily accessible to pedestrians along Broadway, with visibility to users of the streetcar that will pass right in front of the building.)


UniSourcehqtrs-lookingS.jpg

looking southeast from Broadway

UniSourcehqtrs-lookingNE.jpg

looking northeast along Scott Ave. (the southern third of the block shown vacant)

UniSourcehqtrs-lookingNW.jpg

looking northwest along 6th Ave.

UniSourcehqtrs-lookingSW.jpg

looking southwest from corner of Broadway and 6th Ave.
(renderings: UniSource Energy Corp.)


FOR IMMEDIATE RELEASE
Thursday, March 11, 2010
Media Contact: Joe Salkowski, (520) 884-3625
Financial Analyst Contact: Jo Smith, (520) 884-3650

New Unisource Energy Building Will Bring Employees Together
In Solar-powered, Energy-efficient Addition To Downtown Tucson

Tucson, Ariz. – A new headquarters planned for UniSource Energy Corporation (NYSE: UNS) will allow the company to bring more employees together in a solar-powered, energy-efficient building in the heart of downtown Tucson. UniSource Energy, the parent company of Tucson Electric Power (TEP) and sister utility UniSource Energy Services (UES), is planning to build a nine-story office building on a two-acre lot on East Broadway between Scott and Sixth Avenues. Construction crews will break ground later this year, and the building is scheduled to be complete before the end of 2011.

The building will provide 170,000 square feet of office space for more than 425 TEP employees – a significant increase from the 85 company employees who currently occupy leased space downtown. The additional downtown office space will allow TEP to organize the remainder of its approximately 1100 Tucson employees more efficiently in existing offices at the company's Irvington Road campus. "We'll be able to bring our staff together and make other improvements to our working space that will help us do business more efficiently and effectively," said Paul Bonavia, Chairman, President and CEO of UniSource Energy and TEP.

The new building will include about 8,700 square feet of ground-floor retail space as well as a conference center, meeting rooms and nearly 600 parking spaces in a three-level subterranean parking garage and an integrated above-ground parking structure. A photovoltaic solar array will help power a building that has been designed with energy efficiency in mind. UniSource Energy plans to secure a Leadership in Energy and Environmental Design (LEED) Certification for the new building from the U.S. Green Building Council to ensure that it meets high standards for energy-efficient construction and environmentally sensitive design. "We are committed to energy efficiency and environmental stewardship," Bonavia said, "and the construction of our new headquarters gives us an opportunity to lead by example."

The building's long, rectangular footprint minimizes its exposure to direct sunlight from the east and west, and an integrated shade structure will shield its western face. The building will be clad with high-efficiency glass and will feature energy-saving lights, HVAC units and other mechanical systems. A rainwater harvesting system will help ensure that all landscaping needs are met with recycled water. "It is a privilege to work with a client that is focused on energy efficient design," said Mike Davis, CEO and Director of Design for DAVIS, the principal design firm. "It has allowed our team the opportunity to incorporate unique solutions that will make this the greenest office building in Tucson." Davis is a Tucson native and a graduate of the UA College of Architecture. His firm is being assisted by Tucson-based Swaim Associates, which has been active in the city's development and design community for more than four decades.

The building will be developed by Ryan Companies, a leading national commercial real estate firm with offices in Phoenix and six other cities. As the Developer and General Contractor, Ryan Companies will be utilizing its in-house design/build services in conjunction with subcontractors to build the shell and interiors; local companies will be given preference in the bidding for construction contracts. "This project is a significant development not only for Ryan Companies but also for the City of Tucson," notes Todd Holzer, vice president of Ryan Companies' Southwest operation. "We look forward to building a lasting relationship with both the City of Tucson and UniSource Energy."

Tucson Mayor Bob Walkup said UniSource Energy's new headquarters building represents a significant step in downtown redevelopment. "This is going to be a great building with a magnificent design that shows off the best of what we hope to accomplish downtown through strong partnerships with private investors," Walkup said. "The timely review and completion of this project will help us show this community that downtown Tucson is open for business." UniSource Energy's primary subsidiaries include Tucson Electric Power, which serves more than 400,000 customers in southern Arizona, and UniSource Energy Services, provider of natural gas and electric service for about 235,000 customers in northern and southern Arizona. For more information, visit www.uns.com.


Here's a youtube video with an aerial perspective: http://www.youtube.com/watch?v=_rJj_dh9IHc&hd=1
 
Last edited:
With his downtown luxury condo project (The Post) unable to secure financing, Don Bourn is considering a boutique hotel on his vacant Congress St. parcel, potentially at a lower price point than the proposed Convention Center Sheraton:


Downtown developer looks to hotel as condo plan stalls
by Rhonda Bodfield
Arizona Daily Star
March 12, 2010

A major downtown property owner who has gone through a number of fits and stops on a project in the heart of downtown is exploring the concept of a midrange hotel along Congress Street. Developer Don Bourn bought most of the block of East Congress between Scott and Stone avenues from the city for $100 in 2004. The city tore down the 19th-century Pusch building, paying the $500,000 demolition costs, to make way for a condominium project. Although it was supposed to be under construction in mid-2007, the site has yet to be rebuilt. Bourn, who said the market crash dried up financing for the project, added that he remains committed to building there and is doing a preliminary feasibility study to see if a five-story, 120-room hotel would be more viable than the condo project. "With the residential market the way it is, we're considering a variety of alternatives, and we've talked to some hotel groups about partnering up," Bourn said.

Bourn confirmed that the Kansas-based True North Hotel Group, which specializes in extended-stay hotels, is among the partners he has been working with. Company representatives could not be reached for comment. Acknowledging that "the hotel market is not doing that great right now either," Bourn said he's weighing other options as well, from waiting out the market to looking at office space and retail uses on the ground floor. But the hotel concept makes sense, he said, because downtown amenities such as restaurants and health clubs would be a draw for visitors. There's a business population downtown that might find it convenient, he said, and the modern-streetcar project makes it more promising. He said he didn't see it as direct competition with the city's $180 million proposed downtown convention hotel, which would be the hub of the Rio Nuevo redevelopment project. "It would be a low-cost alternative to a more expensive hotel, so I see those uses as complementary."

Bourn said he has discussed the concept with City Manager Mike Letcher, who encouraged him to pursue the feasibility study. Letcher was unavailable for comment. Bourn said he expects to have some initial feedback on the project within the next month. "Our thought is to do something nice that's a real asset to the community," he said. "Everyone is eager to have something built on that site, but everyone wants something to be successful there, too, so we need to study our options carefully."

Councilman Steve Kozachik, who has continued to raise questions about the viability and liability of the city's new proposed hotel, said he's had discussions with Bourn and sees such projects as an alternative. He said he'd be willing to discuss setting aside a pot of funding, say $12 million, to provide small loans to downtown developers to help boost their ability to get financing from the banks for their projects. He added: "The city has all these vacant spaces downtown. We need to start some of these things. And the way I see it, if we come up with a 'bridge' loan to generate private-sector development, we're still far below the level of exposure the city is going to take on if it decides to finance this $170 million hotel."
 
Does Tucson really have the demand for a boutique hotel?

It won't have a chance unless the convention center expansion is done and more businesses move downtown, and would be just a less expensive option for business travelers and conventioneers than the proposed Sheraton (rather than a NY/LA-style boutique hotel). Nevertheless, financing will be hard to come by, so the developer is just trying to figure out what can be done with that lot--he got a hell of a deal from the city on that property, so I'm guessing he's feeling some pressure to get something built.
 
It is a big eyesore to have a vacant lot on congress st where there are so many new projects being built/planned. Why not just put an extended stay hotel instead of a boutique hotel. I still think that the gadsen co would want to put a boutique hotel near the mercado district. Just get a well known hotel name there that will put a decent 4-5 story hotel that way we don't need an eyesore vacant lot.
 
It won't have a chance unless the convention center expansion is done and more businesses move downtown, and would be just a less expensive option for business travelers and conventioneers than the proposed Sheraton (rather than a NY/LA-style boutique hotel). Nevertheless, financing will be hard to come by, so the developer is just trying to figure out what can be done with that lot--he got a hell of a deal from the city on that property, so I'm guessing he's feeling some pressure to get something built.

...and he should be feeling some pressure. That lot has been sitting vacant for quite a while now.
 
It is a big eyesore to have a vacant lot on congress st where there are so many new projects being built/planned. Why not just put an extended stay hotel instead of a boutique hotel. I still think that the gadsen co would want to put a boutique hotel near the mercado district. Just get a well known hotel name there that will put a decent 4-5 story hotel that way we don't need an eyesore vacant lot.

If it were me, I would put something like this on the site of The Post.

30PROJ01.jpg


I would then move the hotel to that lot behind Wig-O-Rama and propose this design for it. I would also intergrate Wig-O-Rama into the new building. And replace the wig shop for a restaraunt or something.

millloftslx5.jpg


I have so many ideas for Tucson.
 
Last edited:
It is a big eyesore to have a vacant lot on congress st where there are so many new projects being built/planned. Why not just put an extended stay hotel instead of a boutique hotel. I still think that the gadsen co would want to put a boutique hotel near the mercado district. Just get a well known hotel name there that will put a decent 4-5 story hotel that way we don't need an eyesore vacant lot.

True North Hotel Group (one of the developers that Don Bourn is supposedly talking to) has built Hampton Inns in Phoenix and Yuma, as well as similarly-priced properties such as Residence Inns, SpringHill Suites, etc., so he is certainly not looking at a pricey boutique hotel for the Congress St. parcel.

Gadsden Co. had originally announced a 125-room boutique hotel for their planned Convento District west of I-10 to be run by Quinta Real, the upscale chain from Mexico. However, it remains to be seen whether that is really feasible, as there are not that many business travelers in downtown, and their development may not be as high-end as initially planned. (Right now, it looks like the first Convento District project will be affordable housing for seniors.)


http://www.truenorthhotels.com/portfolio/index.php

http://www.quintareal.com/
 
If it were me, I would put something like this on the site of The Post.

30PROJ01.jpg


I would then move the hotel to that lot behind Wig-O-Rama and propose this design for it. I would also intergrate Wig-O-Rama into the new building. And replace the wig shop for a restaraunt or something.


Your idea for the Congress St. lot is not so dissimilar from Bourn's own render for The Post condo project, which would have had street-level retail/restaurants:

ThePost-rendering.jpg

(render: Bourn Partners)



About Wig-O-Rama--it's a shame they didn't take advantage of the facade restoration funds they were awarded by the city, as that corner is one of the most visible in the downtown area and definitely in need of some work. (That money was eventually given to the W. A. Julian (Zen Rock) building and the Beowulf Alley Theatre, both of which plan to do their restorations this summer.)
 
Last edited:
The local diocese says it will cede ownership of the crumbling Marist College over to the city if Congressman Grijalva secures $2M in federal funds for the historic building. However, the city is unsure if it has an additional $3-4M needed for upgrades to make the structure useable:


MaristCollegebldg2008.jpg

(photo: Arizona Daily Star)


Old building downtown may fall into city's hands
by Rhonda Bodfield
Arizona Daily Star
March 13, 2010

The Tucson City Council has agreed to take over ownership of a historic downtown building devastated by water damage in the hopes that Congressman Raúl Grijalva can get a federal appropriation to save it. Grijalva has sought $2 million for the 95-year-old Marist College building, a former Catholic school in the St. Augustine Cathedral block. Directly across from the Tucson Convention Center and under the care of the Catholic Diocese of Tucson, it's on the National Register of Historic Places and is considered the tallest example of unfired adobe brick architecture in the state. It is also falling apart. Empty for eight years, three corners of the building crumbled in a 2005 storm. It has since been braced and covered with tarps to protect it from rain. And increasingly, the vacant building has been the target of vandals. "I think it's important," Grijalva said. "I think it will add to this whole downtown revitalization effort. The whole idea is to preserve what's left of our old architecture." With Congress unable to give money to the diocese, the diocese agreed to cede ownership if the appropriation comes through.

Background materials provided to the council indicate it could potentially provide a forum for downtown community events or house nonprofits or Access Tucson and Channel 12. It also could house a new Tucson Visitors Center, and serve as a venue for the $820,000 short video intended to highlight Tucson's cultural birthplace. City officials expect to know by May if the money will come through. The city's historic preservation officer, Jonathan Mabry, said the funding would be enough to restore the building. "I think if we get the federal appropriation, then the prognosis is good for the patient," Mabry said, noting it's not in danger of imminent collapse because of the stabilization. "But every year that passes, the potential for more damage exists. It needs to have a permanent solution soon."

Although the diocese maintains the plumbing, council members were advised it would cost another $3 million to $4 million to update the interior space. If the city takes possession, it could be in the situation of having a building that it doesn't have a use for or the money to fix up, cautioned Deputy City Manager Richard Miranda. "There is an issue of buyer beware." Housing and Community Development Director Albert Elías said the timing of the transfer could be such that it doesn't occur until the federal government appropriates the money. "If we don't get more money and no other partners come forward, we could just stop and secure the perimeter and we'd still be in a better place than we are today," he said.

Taxpayer activist John Kromko said while he questions whether there are better uses for the money, he has a bigger concern. "We just want to be sure that once the project is completed, the city doesn't sell the building to an insider for $1." But Councilwoman Regina Romero said it's her hope to prevent the building from falling further into disrepair and becoming even more "of an eyesore, an embarrassment and probably even a liability. If we have the opportunity to explore a solution, why not?"
 
2 more Tucson men appointed to Rio Nuevo board
March 13, 2010

A commercial real estate broker and a county supervisor's aide are the final appointees to the new board that will oversee the Rio Nuevo downtown Tucson redevelopment district. Arizona House Speaker Kirk Adams appointed Tucson broker Mark Irvin to the board Friday along with Scott Egan, who's on the staff of Republican Pima County Supervisor Ray Carroll. The board was established by the state Legislature because of concerns with Tucson's handling of the project.

The board now has nine new members with eight being Tucson residents. The first meeting of the new board will be March 16 when it has a study session regarding the status of the proposed convention center hotel.


Information from: Arizona Daily Star, http://www.azstarnet.com
 
With its Tuesday meeting occupied with voting questions, the new Rio Nuevo board will meet again next week, hopefully addressing the convention center expansion and hotel:


New Rio Nuevo board stuck on voting issue
by Teya Vitu
Downtown Tucsonan
March 16, 2010

The newly appointed Rio Nuevo board members met for the first time March 16 amid confusion on whether the new board members had any voting rights. Rio Nuevo legal council Bill Hicks said the board’s archaic weighted voting process was not addressed in the November legislation that gave the governor, State Senate president and House speaker the right to appoint board members. The Rio Nuevo board now consists of four prior board members – Anne-Marie Russell, Jeff DiGregorio, Victor Soltero and Dan Eckstrom – and nine newly appointed members. Hicks said the board could assume the old voting system was voided by the new legislation but he recommended the prior four-person board formally rescind the weighted votes, which gave the two board members appointed by Tucson five votes each and the two appointed by South Tucson one point each.

DiGregorio and Soltero were the only prior board members present March 16, and the new board members did not overrule Hicks’ suggestion so the voting matter will be straightened out at the next board meeting scheduled for 3 p.m. March 24 at the Tucson Convention Center. In coming weeks, the new board will tackle numerous housekeeping issues as well as deciding on whether to commit to a $200 million convention center hotel and how to finance it. The new board must consider if it wants to hire its own executive director and staff or maintain the intergovernmental agreement with Tucson, where Deputy City Manager Richard Miranda serves as Rio Nuevo’s executive director and city Finance Director Kelly Gottschalk services as Rio Nuevo’s treasurer. That will determine how independent the Rio Nuevo board wants to be from the city, which has run Rio Nuevo since the beginning.

In the past year, the old Rio Nuevo board has assumed more direct control, and that was reinforced by the Legislature taking away appointing powers from Tucson and South Tucson. But city staff members still operate the Rio Nuevo Multipurpose Facilities District, handling things like record keeping, insurance, procurement, project management and finances. The new board brings together real estate and finance professionals; a Downtown restaurateur; a former Indianapolis city council member involved in building a new football stadium and expanding the convention center; a voice from the Pima County Board of Supervisors; and a former president of Hughes Missile Group, the predecessor of Raytheon Missile Systems.

Gov. Jan Brewer got five appointees and state Senate President Bob Burns and House Kirk Adams each got to appoint two board members.

Brewer appointed:
• Jodi Bain, a commercial real estate attorney, founder and principal of Bain Investments, and vice president and general counsel at Town West Realty.

• Edwin Biggers, former president of Hughes Missile Group and president of Pepperdine University’s Board of Regents.

• Carlotta Flores, owner and executive chef at El Charro Café.

• David Jones, president and chief executive of the Arizona Contractors Association and a former city councilman in Indianapolis, who was involved in expanding that city’s convention enter and building a stadium for the Indianapolis Colts..

• Alan Willenbrock, vice president and financial adviser at Morgan Stanley Smith Barney.

Burns appointed:
• Craig Finfrock, owner and broker of Commercial Retail Advisors

• Alberto Moore, owner of the real estate firm Alberto Moore Associates and involved in international business including American university programs in China

Adams appointed:
• Mark Irvin, managing member of Mark Irvin Commercial Real Estate

• Scott Egan, executive assistant to Pima County Supervisor Ray Carroll.

The four board members appointed by Tucson and South Tucson are allowed to complete their terms through June 2011.
 
MLKApts3-10.jpg

webcam shot on March 17
(webcam: transview.org)


Framing complete, MLK ready for final push
by Teya Vitu
Downtown Tucsonan
March 17, 2010

A topping-out party March 22 will celebrate the completion of framing of the six-story, 68-unit Martin Luther King Jr. Apartments at Fifth Avenue and Congress Street. The new $23 million public housing project is for low-income seniors and the disabled who meet federal eligibility for public housing. The structure has taken shape under the 125-foot crane that has been in place at the east end of Downtown since January 2009. Insulation and drywall started enclosing the structure in March and will continue in April. The ambition is to finish construction in September and have residents move in by the end of the year, said Ann Vargas, project manager for the city’s Housing and Community Development Department. “Within the next sixth months, there will be a transformation of the landscape that realizes the revitalization efforts for Downtown,” Vargas said.

By Aug. 1, the $13.5 million, 285-space, three-level garage beneath MLK should be open to the public, and Vargas also expects completion of the Depot Plaza between MLK and Fifth Avenue. It will be an urban pedestrian setting with commemorative art of King. The new MLK Apartments is the largest structure built Downtown since the Evo A. DeConcini Federal Building & Courthouse opened in 2000. The city will start taking reservations in April from people who want to live at the MLK. Residents of the old MLK Apartments, today’s private-sector One North Fifth Apartments, will have first dibs, and Vargas said about 30 former MLK residents are interested. The MLK is funded by most of a $9.8 million HOPE VI grant from the U.S. Housing and Urban Development Department; $8 million in federal low-income tax credits; $1.27 million in Pima County bonds; $750,000 from the federal Home Loan Bank affordable housing program; about $2 million in city HOME Investment Partnership funds and other federal funds that pass through the city.
 
Once all contractor bids are received, Garfield Traub can provide the Rio Nuevo board with a guaranteed maximum price for the proposed convention center Sheraton:


Bid packages go out on downtown hotel project
Inside Tucson Business
March 19, 2010

As part of the on-going process to determine costs involved with building a 525-room hotel at the Tucson Convention Center, construction managers Turner-Sundt last week released 200 pre-bid work packages totalling $190 million. About 150 contractors from within the Tucson region have pursued work on the project and received the packages. The work includes construction of the hotel, a parking garage, and demolition of the convention center’s west entrance. Kurt Wadlington, senior project director at Sundt Construction, said the hotel will be a $145 million to $160 million project, depending on how the bids come in.

Turner-Sundt is accepting bids for work including structural steel, concrete, masonry, thermal and moisture protection, doors and windows, plumbing, HVAC, electrical, and landscaping. In mid-May, Turner-Sundt hopes to provide final bids to developer Garfield Traub, which in turn, will present them to the Rio Nuevo District Board to decide whether to move forward with the project, though the City of Tucson would have to weigh in because it would be responsible for backing bonds to pay for it. A state audit of Rio Nuevo’s operations and the sale of bonds to finance construction are pending.

Contractors with bid questions can contact Sundt at (520) 750-4702.
 
Last edited:
HaciendadelSolroad.jpg

The new entrance will replace "the tiny, winding road so many people got
lost on," resort officials say.
(photo: Hacienda del Sol)


Ranch has needed it 'since 1929'
New road to Hacienda del Sol
Arizona Daily Star
March 20, 2010

Hacienda del Sol Guest Ranch Resort will hold a public celebration April 6 for the grand opening of a new road and entrance it has built. The new direct road from Hacienda dol Sol Road replaces "the tiny, winding road so many people got lost on," the resort says in a news release. "The Hacienda has needed this entrance since 1929 when it was a finishing school for girls," Rick Fink, co-owner of Hacienda del Sol, said in the release. Tom Firth, also a co-owner, added, "Our objective was to create an upscale entrance for our guests that complements the resort's ambience and the quality of our neighborhood. We knew how important it was to invest the time and money to do this right. Hacienda del Sol is here to stay."

BY THE NUMBERS: The eight-month, $500,000 project includes:

136,000 square feet of paving.

150 new indigenous trees.

1,300-foot stretch of road with 30,000 square feet of multicolored brick pavers (100,000 brick pavers).

330,000 pounds of boulders.

100+ parking spaces.


IF YOU GO

What: Grand opening of road and entrance to Hacienda del Sol Guest Ranch Resort. The inner courtyard will have live jazz, complimentary champagne and wine, cake and Executive Chef Ramiro Scavo's signature carving station. Tours will be offered of the recently renovated guest rooms, banquet and event areas and Hacienda's private gardens.

When: April 6, a Tuesday, 4:30-6:30 p.m. with a 5 p.m. ribbon-cutting ceremony.

Where
: The resort at 5501 N. Hacienda del Sol Road.

To attend: Reservations are required for the event; call 299-1501.
 
Tucson growth rate continues to slow

As expected, Tucson's rate of growth has continued to decline according to recent U.S. Census Bureau estimates, as the metro area (Pima County) gained only 10,368 new residents during the year ended July 1, 2009. With a total estimated population of 1,020,200 as of that date, Tucson is ranked as the nation's 52nd-largest metropolitan area. Even with the recent slowdown, however, Tucson has grown nearly 21% during this decade--faster than either Albuquerque (18%) or El Paso (11%), two similar-sized Southwestern cities.


For more info.:
http://www.census.gov/popest/metro/metro.html

http://en.wikipedia.org/wiki/Table_of_United_States_Metropolitan_Statistical_Areas

 
Last edited:
Rio Nuevo Board

Rumor has it that the Rio Nuevo Board will have to recogfigure membership since the members MUST reside in the City limits, who will they choose and how will that affect the Rio Nuevo District?
 
Rumor has it that the Rio Nuevo Board will have to recogfigure membership since the members MUST reside in the City limits, who will they choose and how will that affect the Rio Nuevo District?

Apparently, two of Gov. Brewer's five board appointees are ineligible, since three of the five have to be residents of Tucson or South Tucson, so she will be appointing two new ones shortly. However, the actual Rio Nuevo TIF District boundaries will remain the same (see the boundary map in the metro Tucson project list). For now, the board will continue to meet weekly to get up to speed in order to make some crucial decisions about the proposed convention center expansion and Sheraton hotel.


http://www.azstarnet.com/news/local...cle_5893c54b-448d-51fa-a7fe-561d3ec45376.html
 