Tucson Development Thread


This Is Tucson published a nice feature today on all of Tucson's murals. This feature includes everything from the smaller murals to the iconic building sized murals.

A very long list of Tucson murals and where to find them

What's your favorite mural?

https://thisistucson.com/tucsonlife/mural-gallery-tucson-map/article_9f5d841a-39ab-11e7-8840-8bd7d101486e.html


One of my guilty pleasures when traveling around town is discovering previously unseen murals that, IMHO, contribute much to the urban fabric of Tucson. A couple days ago I ate at Zio Peppe for Italian-Sonoran fusion and got a good look at the mural there. Certainly not the largest mural, but what I appreciated about it was the gastronomy theme and the details featuring local stalwarts Whiskey Del Bac and Barrio Bread. Well done Ashley White.

PWj21KE.jpeg


jyo42lK.jpeg




Also very excited about Joe Pagac's forthcoming saguaro mural on the 11-story Transamerica building in downtown:

https://thisistucson.com/tucsonlife/tucson-historic-neighborhood-el-presidio-restaurants/article_446df384-79c5-11ef-9253-ff56e74de7a8.html



xozi9Yt.jpeg


4o2jIn9.jpeg
 
Last edited:
More details on Mosaic Quarter's programming strategy:

Groundbreaking development: Mosaic Quarter set to transform Tucson sports scene with 2027 opening

The Mosaic Quarter multi-sporting and recreational facility, paired alongside Kino Sports Complex, is set to become a hub for sporting and recreation that competes with Maricopa County.

https://www.tucsonsentinel.com/local/report/121324_mosaic_corner/groundbreaking-development-mosaic-quarter-set-transform-tucson-sports-scene-with-2027-opening/




qfA3t8R.jpeg
 
Good news (knock on wood), Speedway/Campbell project submitted their Development Package last week. Plans were not available for review, but it is a 19-story mixed use, multi-family structure with 395 units.
 
Good news (knock on wood), Speedway/Campbell project submitted their Development Package last week. Plans were not available for review, but it is a 19-story mixed use, multi-family structure with 395 units.

Flippin' awesome - thanks! Where the process is:

https://pro.tucsonaz.gov/plitemreviewdetails/TD-DEV-1224-00329/9d01214f-ced8-4ee8-84a1-276aa5a730fc/


Also noticed on another page that the applicant is listed as Erich Rectenwald. Erich is the Development Manager in Mortensen's Phoenix office:

https://www.mortenson.com/team/erich-rectenwald
 
Bautista

I took some Bautista photos. There were some previous posts about it already and not much has changed but these are some different views.

fRVKdfU.png

nl4KQNN.png

n0v9D1H.png
 
Plan Tucson 2025 Preliminary Draft Available for Review, Feedback

Plan Tucson 2025 is a comprehensive 10-year strategy for guiding Tucson’s growth and development. It addresses key areas such as environmental planning, cultural heritage, land use, transportation, parks, safety, economic development, water resources, and housing.

https://www.tucsonaz.gov/Departments/Planning-Development-Services/PDSD-News/Plan-Tucson-2025-Preliminary-Draft-Available-for-Review-Community-Engagement-Opportunities




H5WEQIk.png
 
I dont understand this. This study was already done and published in 2016. So I guess they have to go back, waste more money and do it all again?

https://azdot.gov/planning/transpor...tier-1-passenger-rail-study-tucson-to-phoenix

Excellent question. Transpo projects seem to get studied to death and nothing ever gets built. From what I've read this new study is additive and not duplicative. Here's how ADOT explains what the new Passenger Rail Corridor Study does versus prior (2016) EIS:

https://azdot.gov/planning/transportation-programs/state-rail-plan/passenger-rail-study-tucson-phoenix

The Arizona Department of Transportation (ADOT) is conducting the Phoenix to Tucson Intercity Passenger Rail Corridor Study through a Corridor Identification and Development Program (CIDP) grant from the Federal Railroad Administration (FRA).

The study will prepare a Service Development Plan (Plan) for proposed passenger rail service along a 158-mile corridor between the greater Phoenix and Tucson regions. The route was selected through a FRA Tier 1 Environmental Impact Statement (EIS) and Record of Decision completed for the corridor in 2016. To view past documents and the results of the Tier 1 EIS, click here.

This study will build upon the previous EIS by conducting a detailed analysis of engineering, environmental factors and operations. It will also include stakeholder engagement and public outreach to determine the necessary service requirements and financial planning considerations for advancing intercity passenger rail between Arizona's two largest metropolitan areas of Phoenix and Tucson.


Hope this helps!




ZXeN2eJ.jpeg
 
“You don’t see skyscrapers in small towns,” Nicolson said.

:haha::haha::haha:

I'm sorry, but I find this extremely absurd. Three stories is not even anywhere near close to a skyscraper. Hell, there are single family homes that are 3 floors.

In Tucson, 3 stories is considered a hi-rise. No joke. :rolleyes:
 


Back
Top