Tucson Development Thread


Tangerine Road Corridor Project

Construction on phase 2A at the western end of Tangerine Road broke ground in late summer. The project near the I-10 interchange will expand to four lanes, add bike and pedestrian amenities, and improved drainage. Learn more about this and other projects.

https://www.tangerineroad.info




WJU2hjT.png
 
Where we are with Tucson-Phoenix passenger rail:

Step 1 (Scoping): ADOT is currently working with FRA to develop a scope, schedule and budget to prepare the Service Development Plan for the Phoenix to Tucson Intercity Passenger Rail Corridor. The Step 1 approval is anticipated in spring 2025.

https://azdot.gov/planning/transportation-programs/state-rail-plan/passenger-rail-study-tucson-phoenix

Phoenix-Tucson-Intercity-Passenger-Rail-Corridor-project-scope-infographic.jpg


map-Phoenix-Tucson-Intercity-Passenger-Rail-Corridor-Study.jpg

No brainer to me. Connect the airports...and somehow, someway get a light rail from TIA to connect with the downtown train station. No Rapid Bus system. A proper light rail. You have to connect major transportation hubs.
 
No brainer to me. Connect the airports...and somehow, someway get a light rail from TIA to connect with the downtown train station. No Rapid Bus system. A proper light rail. You have to connect major transportation hubs.

We all should know more about where we are with this by the end of 2025. I am worried though about the anticipated antipathy towards passenger rail with the incoming administration in Washington. I don't know how much of the funding for steps 1, 2, and 3 are permanently baked in and irrevocably committed to this project.

I completely agree that this is a no brainer. I would also like to see this service eventually extended south to Sahuarita, Green Valley, and Nogales. Cheap dreams I guess.
 
We all should know more about where we are with this by the end of 2025. I am worried though about the anticipated antipathy towards passenger rail with the incoming administration in Washington. I don't know how much of the funding for steps 1, 2, and 3 are permanently baked in and irrevocably committed to this project.

I completely agree that this is a no brainer. I would also like to see this service eventually extended south to Sahuarita, Green Valley, and Nogales. Cheap dreams I guess.

Agreed, but at this point I just want Tucson connected to other major cities. Your other post showed the #1 city TIA flies to is Phx. That should say enough that we need HSR from Tucson to Phx. But I wouldn't be the least bit surprised if there is a TIA lobby group that will prevent that from happening since that would lower TIA revenue.
 
Agreed, but at this point I just want Tucson connected to other major cities. Your other post showed the #1 city TIA flies to is Phx. That should say enough that we need HSR from Tucson to Phx. But I wouldn't be the least bit surprised if there is a TIA lobby group that will prevent that from happening since that would lower TIA revenue.

In Texas, it was none other than Southwest Airlines that fought against HSR:

https://www.chron.com/culture/article/southwest-texas-rail-line-19934058.php



ri7s2wV.png
 
Agreed, but at this point I just want Tucson connected to other major cities. Your other post showed the #1 city TIA flies to is Phx. That should say enough that we need HSR from Tucson to Phx. But I wouldn't be the least bit surprised if there is a TIA lobby group that will prevent that from happening since that would lower TIA revenue.

I have mixed feelings on this, I’m for high speed rail but it is a huge concern for TIA forsure, TIA loses over a million plus passengers per year to Sky Harbor and would lose even more with this new rail line. I prefer my local airport and hate Sky Harbor at the same I dread the drive up to PHX nowadays on the 10
 
Tangerine Road Corridor Project

Construction on phase 2A at the western end of Tangerine Road broke ground in late summer. The project near the I-10 interchange will expand to four lanes, add bike and pedestrian amenities, and improved drainage. Learn more about this and other projects.

https://www.tangerineroad.info




WJU2hjT.png

I dont understand wasting the money on Section 2A over the freeway. Marana isn't planning ahead and are going to find themselves in another Cortaro Farms Rd mess. They need an interchange up and over the RR tracks. Poor planning.
 
Seems rather myopic to be opposed to the train even for TIA: regional rail to airport connections are very rare in the US, and building three at once would poise Arizona to be a transportation powerhouse. Making it easier for people to get to the airport is a good thing, especially for Pinal and East Valley residents that would have just as well flown out of PHX or AZA.
 
Seems rather myopic to be opposed to the train even for TIA: regional rail to airport connections are very rare in the US, and building three at once would poise Arizona to be a transportation powerhouse. Making it easier for people to get to the airport is a good thing, especially for Pinal and East Valley residents that would have just as well flown out of PHX or AZA.

Exactly. That some airlines will lose some marginal revenue should not prevent more efficient alternatives for moving people between Phoenix and Tucson. Protecting corporations over the good of the people is NOT what politicians are supposed to do...even in Arizona.
 
Earlier this year I posted a September article from the Albuquerque Journal on Albuquerque seeking to emulate Tucson's downtown revitalization successes: https://finance.yahoo.com/news/albuquerque-deserve-tucson-business-leader-030200739.html?fr=yhssrp_catchall

On this subject, also an interesting read is part one of a four part series published by the Downtown Albuquerque News back in April that is now out from behind that publication's paywall: https://us3.campaign-archive.com/?u=306fc3b21030d6f0128cc4af9&id=47c7418502





tw469vX.jpeg
 
Downtown Tucson utility boxes get am artsy makeover

https://tucson.com/news/local/downtown-tucson-utility-boxes-get-am-artsy-makeover/article_9638e9e8-a5f9-11ef-8dcc-53298171a359.html

Ten utility boxes in downtown Tucson recently received vinyl wraps featuring artwork from local artists. The grant-funded public-art project, "That's a Wrap," had five artists create two designs apiece. Porter McDonald designed the utility box at 98 E. Congress St., which pays tribute to the former Wig-O-Rama store. The project was made possible through the Public Art Panel, Rio Nuevo, the city of Tucson and the Arts Foundation for Tucson and Southern Arizona.


More: https://www.signalsaz.com/articles/utility-box-art-in-downtown-tucson/




jKdHWTP.jpeg
 
Longer and IMHO a little more polished presentation than the vid posted previously.


RTA Next Open House Presentation

RTA Next presentation from the Oro Valley open house. Learn about a draft $2.46 billion draft plan to fund regional transportation improvements across the greater Tucson region over the next 20 years. The RTA is seeking public review and input on the draft plan before asking voters to consider the plan at a future election.




• Video Link
 
Last edited:
I think you might be right. Looks like they've been resubmitting zoning requirements. Neighborhoods have been notified and a newish rendering has been submitted. Appears it's still going to reach 20 stories and 19 stories but the rendering doesn't match exactly what the former renderings were. Also the Speedway Campbell Gateway website isn't active anymore. So maybe someone with more sleuthing ability can figure it out. Would be amazing if completed as proposed nearly 6 years ago.

I cant figure out how to attach pics so here is an Imgur link.

https://imgur.com/a/dPRy5vp


The Wayback Machine's last capture of an active website was August 24, 2023:

https://web.archive.org/web/20230824231733/https://www.speedwaycampbellgateway.com/




CMgaiVu.jpeg
 


Back
Top