Tucson Development Thread


Explore Business Growth in Tucson, Arizona MSA

How are we doing?

https://mapazdashboard.arizona.edu/economy/business-growth




xmVoMgL.png
 
I take everything Musker says with a grain of salt. But the Hyatt Regency is HSL's old Hotel Arizona which I seriously doubt will ever be completed. I don't believe the Moxy is still designated across from Hotel Congress anymore. I think that officially ended because of parking garage issue. My gut is that option to build something on top of the new Music Hall garage. I keep hearing that over and over.

I would be SHOCKED if Obie comes back with a 20 story building.

What I want to know is what is happening with the Fox Theatre renovation. They announced that 2 years ago (yea its been 2 years) and I've heard zero movement on that.

I am hoping at least 15 stories with the added parking garage based on the transcripts, but we will see in about 2 weeks. I think they might have a presentation at the end of this month considering they were a part of the discussion meeting on 10/8.

I don't have a link or source to back this up, but I thought I read somewhere that the Fox Theatre expansion won't begin until 2025 anyways because they were doing fundraising all of 2024. Here is a link to their brochure campaign which is current as of March 2024.

https://issuu.com/foxtucson/docs/future_is_right_around_the_corner
 
I also noticed they changed the design on the Fox theater expansion pictured on the brochure from designs 2 years ago. Putting them side by side, I wonder which one they will use?

ofISXu0.png
 
I also noticed they changed the design on the Fox theater expansion pictured on the brochure from designs 2 years ago. Putting them side by side, I wonder which one they will use?

ofISXu0.png



Well, I hope it is the one on the left. IMHO it is more open to the street, more inviting, a little less fortress like, and therefore does a better job of improving the streetscape.

The rendering on the right reminds me of one of the antler arches on the main square in downtown Jackson, Wyoming.



d42Wnvi.jpeg
 
New Eastbound Lanes of Interstate 10 Open in Northwest Tucson

Eastbound traffic has shifted to the mainline lanes of I-10, moving away from a frontage road detour that had been in place since early 2023 during highway reconstruction. This work is part of a $171 million project to expand I-10 from three to four lanes in each direction between Ina and Ruthrauff roads.

https://www.kvoa.com/news/new-eastbound-lanes-of-interstate-10-open-in-northwest-tucson/article_1dd79f2a-8b15-11ef-8e72-63737969ff63.html



670e9d567ccc2.image.jpg
 
There is also a memorandum regarding 75 E Broadway:

https://content.civicplus.com/api/assets/d9a72790-dfc8-4879-88d8-6ddcd3aca293

They are still working on designs until the end of the month according to it.

..."working with local developers Peach Properties, as well as
local architectural firm Swaim and Associates"

Tells me all I need to know that this project will be a huge disappointment. What is it with Rio Nuevo, Peach and Swaim? And they never perform!!! There must be some kind of insider deal with Rio ALWAYS having Peach and Swaim be a part of every downtown project.
 
..."working with local developers Peach Properties, as well as
local architectural firm Swaim and Associates"

Tells me all I need to know that this project will be a huge disappointment. What is it with Rio Nuevo, Peach and Swaim? And they never perform!!! There must be some kind of insider deal with Rio ALWAYS having Peach and Swaim be a part of every downtown project.

In all fairness to Swaim, they aren't responsible for financing and following through with the designs they are commissioned to make? As far as I know, they've always followed through with their end of the deal.
 
In all fairness to Swaim, they aren't responsible for financing and following through with the designs they are commissioned to make? As far as I know, they've always followed through with their end of the deal.

My issue is they keep choosing the same architects with the same visions so we get the same looking buildings. They're not very forward thinking IMO. The 75 E Broadway bldg (which was panned by many) from what I understand Obie will still use as a base for the design. Still waiting for Ronstadt Transit Center development financed by Peach and designed by Swaim. Just tired of the same old people that dont strive for anything unique, original that will bring some architectural interest and notice to Tucson.
 
Moving target: New $149 million RTA shortfall threatens future vote, has Tucson Council stewing

The Regional Transportation Authority 20-year list of projects is going to come up $146 million short and leave a pair of jobs unfinished. There's not enough money left to complete the East Grant Road expansion or the modernization of North First Avenue.

https://www.tucsonsentinel.com/opinion/report/102424_rta_shortfall_op/moving-target-new-149-million-rta-shortfall-threatens-future-vote-has-tucson-council-stewing/




FHHmrcl.jpeg
 


Back
Top