Tucson Development Thread


Happy Holidays and Merry Christmas.

Downtown Links project is well underway and should be completed early 2023. They updated us with a walk through of the Deck Plaza going in near the new underpass of the Union Pacific railroad near 6th and Stone. The video can be viewed in the link below.

https://www.downtownlinks.info/revised-deck-plaza-presentation/

QNbPw0I.png
 
Last edited:
Broadway Widening Street Art

Broadway Widening will be finishing up sometime in February 2022. We can expect to see new street art along the side. Here are a couple of illustrations:

JvruFHy.png

3vjNUSU.png
 
I listened in on the Rio Nuevo (RN) meeting.

- Nothing new regarding Arena lot or 75 East Broadway

- RN Revenue is growing significantly as businesses reopen. They are also seeing increased requests for assistance from businesses looking to relocate to downtown Tucson.

- Zemams is looking to expand into the two buildings to the west of their current location. It will have an "International Sports Bar" (Soccer, Cricket and Rugby), an expanded Zemams, and a coffee shop. Zemams asked for $500k in assistance. This plan was approved and received funding from RN

- The Hotel Arizona group (HSL) is asking for support for two projects. The First is the renovation of the old Hotel Arizona into a Hyatt with roughly 290 rooms. The second is the construction of a senior living facility. This will be built in the newly demolished lot just to the east of the hotel (between the hotel and the Flin apartments) and have between 80-100 units and 8-10 stories. The Senior Living facility is being billed as an upscale, urban option for seniors. It will have valet, onsite theater, dining, etc. This is a $40mil project with construction starting Summer of 22. HSL asked RN to allow the hotel and the senior facility to have access to 150 parking spots in the new Parking Lot C (Behind the Music Hall). RN allowed access to the parking spots for 2 years for free, then at a rental fee after that.
Hey guys sorry I’ve been out of town for quite a while just getting back I see a lot has happened since I’ve been gone including updated information regarding the Hotel Arizona property…
For any of you guys who actually saw the RN presentation is there an actual legit time frame ( for the Hyatt) or is it just proposed like it’s been for the past few years? I really hope they can get going with this hotel what a waste of a building!

Also what a lame adjacent new planned 8-10 story building of higher end senior living.
It appears they too have moved away from two stories of class a office space and condos to this.
With such limited space downtown to build on I can’t believe they continue throwing away limited opportunities on such shi**y buildings!!!
 
1 south church

anyone else notice the bottom floors of the tower are lit at night with "blue" construction lighting? seems the gutting and conversion into hotel is coming right along.
 
For any of you guys who actually saw the RN presentation is there an actual legit time frame ( for the Hyatt) or is it just proposed like it’s been for the past few years? I really hope they can get going with this hotel what a waste of a building!

My understanding is that both projects - the hotel renovation and the senior living building - would be done at the same time as one big project
 
Tucson Development Report – 2021 highlights, 2022 outlook

Commercial Office With the long-term effects of Covid-19 expected to suppress office space demand for the foreseeable future, no major office projects broke ground this past year, including the cancellation of the 19-story downtown tower at 75 E. Broadway, which would have added five new floors of office space. However, 2021 saw the completion of The Refinery, a four-story office building at the UA Tech Park at The Bridges, expected to house numerous UA programs.

Retail/Restaurant Brick-and-mortar retailers are still feeling the impact of Covid-19, with little new retail space starting construction in 2021. Some bigger retail spots are being converted to other uses, although numerous large spaces remain available for lease. The downtown has seen many vacated restaurant spaces taken over by new ones, with more planned for 2022, including The Monica, slated to occupy part of the ground floor of the City Park building.

Residential As the housing shortage continues to inflate prices for single-family homes and multi-family rental properties, construction continues to accelerate for both of these sectors. In 2021, numerous multi-family projects were completed in or near downtown, including The Monier (122 units), The Flin (244 units), The Gallery on 5th (96 units), and The Flash (45 units) near Five Points, plus The Benedictine (255 units) in the Midtown area, as well as two student housing towers adjacent to UA – Hub Tucson Park Ave. (478 beds) and The Parker (482 beds). 2022 should see the groundbreaking of The Bautista (256 units) in the Mercado District, plus the conversion of Hotel City Center to 364 apartments.

Hospitality The completion of major renovations and improvements at the Tucson Convention Center in 2021, plus the opening of three new adjacent hotels - the Doubletree (170 keys), a Home2 Suites (123 keys) and a Hampton Inn (76 keys) - bodes well for convention business growth and tourism in the downtown. 2022 will see the opening of The Citizen Hotel, a 10-key boutique hotel downtown, plus the conversion of nine floors of One South Church to a 145-key Marriott Tribute hotel, and the rehab of the former Hotel Arizona as a 290-key Hyatt hotel.

With the continued build-out of The Bridges development and the expansion of the Kino Sports Complex, several adjacent extended-stay hotels are being built. 2021 saw the completion of The WoodSpring Suites (122 keys) at Tucson Marketplace, with the nearby WaterWalk (126 keys) and SpringHill Suites (126 keys) currently under construction.

UA Three new on-campus projects began construction in 2021: the $85M, three-story Applied Research Building; the $99M, seven-story Grand Challenges Research Building; and a $42M renovation and addition to the Chemistry Building. 2022 should see the completion of the $81M, multi-phase Student Success District and the Chemistry Building renovations.

Infrastructure/Misc. 2021 witnessed the completion of I-10 interchange reconstruction projects at Ruthrauff Rd. and Houghton Rd., with construction on the first projects in the Mosaic Quarter, a $400M+ mixed-use expansion of the Kino Sports Complex, expected to start in 2022. As of year-end 2021, the outlook for two major downtown development proposals - the Tucson Amphitheater on the Arena Site near I-10 and the Ronstadt Center redevelopment - is still unknown, although updates should be expected in the coming year.
 
My understanding is that both projects - the hotel renovation and the senior living building - would be done at the same time as one big project
Hey bud have you hear any updates on what’s going on with old tucson??
It’s been months since I’ve heard any updates on the possibilities????
 
Hey bud have you hear any updates on what’s going on with old tucson??
It’s been months since I’ve heard any updates on the possibilities????

I believe a company out of CO has been chosen for Old Tucson, but the county has been holding off on the final contract to put before a vote with the board of supervisors until sometime early this year. I believe Huckelberry's accident and the fact he's still in rehabilitation might have something to do with the delay. Last rumor I heard was its some railroad company that has experience in tours and western themed museums or experiences. They apparently have some connections to Hollywood. Makes me think its that company that does the Polar Express railroad ride through the Rockies.

But on a side note, Huckelberry still in rehabilitation doesn't seem good to me. I've read that he's using his accumulated sick time and holiday time as he recovers and when that runs out, the BOS will have a talk with him about the options...like possible retirement etc.
 
Last edited:
5 Points intersection is starting to fill out:
  • The Baffert building's construction is going along and I think is supposed to be done this year.
  • The triangle lot between Stone and 6th (the lot with the Ugly but Honest sign) will be Ugly But Honest Pizza. It will have indoor and outdoor seating along with an covered outdoor bar.
  • A three story apartment building with 12 units is just beginning construction behind 5 Points restaurant along 18th.
 
No new significant news to report from the RN meeting yesterday.

TCC will be utilizing portion of the new meeting room for the gem and mineral show.. Lot C garage will be done later than anticipated in April due to Covid and supplies. Eckbo plaza is completed but a portion of it or the walkway to the North leading up to Broadway will be done in April.

Sugar Skulls want to open a sports book which it cleared several hurdles to do so. All they have to do is apply for it. They also indicated a desire to build a separate location to play and for it to be within 6 blocks of the arena proper.

https://www.kold.com/2022/01/26/sugar-skulls-may-get-sports-betting-license/
 
They are beginning to demo the old Maloney's and The Wreck buildings on 4th ave. I had the understanding that the Opus 14 story development that had been planned for the lot had been scrubbed. I wonder if they are clearing the lot to make it more attractive to another development or if Opus has come back to the table.
 
A Film Tax Incentive Bill was introduced in the Senate yesterday. This is really good news for the film community.

It sounds like a solid bill. It appears it offers 15% for productions under $10M. $10-35M = 17.5% and >35M = 20%. And then it appears they can add 2.5% more up to 4x if they meet other requirements that involves AZ workers. So they could garner another 10% if I’m reading this right.

While I don’t think its as good as some surrounding states like NM…I certainly think it puts us in the average range with other western states. While I love the idea of using AZ workers…I’m a bit hesitant AZ isn’t quite up-to-speed on film production since we haven’t been active in nearly 12 years and many professionals have left for CA. So the local qualified staff, production houses and editing (and the fact we still don’t have a real sound stage) has me questioning if its possible to fully make an entire film from pre-to-post in AZ for productions to maximize the full 30% discount.

Regardless, I still feel this is a solid bill and it certainly is a great start to getting films back to AZ. I would urge everyone to speak with your representatives and have them sign on to co-sponsor. It already is bipartisan…which is encouraging! You can see who has signed on in the link below and the fine print of the bill. I’m just thrilled we finally have a bill.

https://legiscan.com/AZ/sponsors/SB1708/2022

https://www.azleg.gov/findmylegislator/
 
Tia

Dose anyone know if frontier airlines also dropped its Las Vegas flight from Tucson?
Can’t believe we lost Burbank with Avelo and Allegiant dropped all of its flights out of TIA and they were highly successful? :shrug::uhh:
 
Dose anyone know if frontier airlines also dropped its Las Vegas flight from Tucson?
Can’t believe we lost Burbank with Avelo and Allegiant dropped all of its flights out of TIA and they were highly successful? :shrug::uhh:

Doesn't appear Frontier does that route. I'm quite upset with Avelo too. That lasted 25 days before they pulled out. They didn't even give Tucson a chance. Frustrating.
 
Dose anyone know if frontier airlines also dropped its Las Vegas flight from Tucson?
Can’t believe we lost Burbank with Avelo and Allegiant dropped all of its flights out of TIA and they were highly successful? :shrug::uhh:

They are not successful if the flights are not profitable. When Frontier flew two daily nonstop flights to Denver they were 90% full but the highest fare they ever charged was $189. Some fares were $29 each way, so the service was not sustainable at that level.
 