Tucson Development Report – 2021 highlights, 2022 outlook
Commercial Office With the long-term effects of Covid-19 expected to suppress office space demand for the foreseeable future, no major office projects broke ground this past year, including the cancellation of the 19-story downtown tower at 75 E. Broadway, which would have added five new floors of office space. However, 2021 saw the completion of The Refinery, a four-story office building at the UA Tech Park at The Bridges, expected to house numerous UA programs.
Retail/Restaurant Brick-and-mortar retailers are still feeling the impact of Covid-19, with little new retail space starting construction in 2021. Some bigger retail spots are being converted to other uses, although numerous large spaces remain available for lease. The downtown has seen many vacated restaurant spaces taken over by new ones, with more planned for 2022, including The Monica, slated to occupy part of the ground floor of the City Park building.
Residential As the housing shortage continues to inflate prices for single-family homes and multi-family rental properties, construction continues to accelerate for both of these sectors. In 2021, numerous multi-family projects were completed in or near downtown, including The Monier (122 units), The Flin (244 units), The Gallery on 5th (96 units), and The Flash (45 units) near Five Points, plus The Benedictine (255 units) in the Midtown area, as well as two student housing towers adjacent to UA – Hub Tucson Park Ave. (478 beds) and The Parker (482 beds). 2022 should see the groundbreaking of The Bautista (256 units) in the Mercado District, plus the conversion of Hotel City Center to 364 apartments.
Hospitality The completion of major renovations and improvements at the Tucson Convention Center in 2021, plus the opening of three new adjacent hotels - the Doubletree (170 keys), a Home2 Suites (123 keys) and a Hampton Inn (76 keys) - bodes well for convention business growth and tourism in the downtown. 2022 will see the opening of The Citizen Hotel, a 10-key boutique hotel downtown, plus the conversion of nine floors of One South Church to a 145-key Marriott Tribute hotel, and the rehab of the former Hotel Arizona as a 290-key Hyatt hotel.
With the continued build-out of The Bridges development and the expansion of the Kino Sports Complex, several adjacent extended-stay hotels are being built. 2021 saw the completion of The WoodSpring Suites (122 keys) at Tucson Marketplace, with the nearby WaterWalk (126 keys) and SpringHill Suites (126 keys) currently under construction.
UA Three new on-campus projects began construction in 2021: the $85M, three-story Applied Research Building; the $99M, seven-story Grand Challenges Research Building; and a $42M renovation and addition to the Chemistry Building. 2022 should see the completion of the $81M, multi-phase Student Success District and the Chemistry Building renovations.
Infrastructure/Misc. 2021 witnessed the completion of I-10 interchange reconstruction projects at Ruthrauff Rd. and Houghton Rd., with construction on the first projects in the Mosaic Quarter, a $400M+ mixed-use expansion of the Kino Sports Complex, expected to start in 2022. As of year-end 2021, the outlook for two major downtown development proposals - the Tucson Amphitheater on the Arena Site near I-10 and the Ronstadt Center redevelopment - is still unknown, although updates should be expected in the coming year.