TORONTO | Highrise Developments Compilation Thread


Fresh Toronto proposals:

501 YONGE ST

OPA / Rezoning 11 187996 STE 27 OZ Ward 27
- Tor & E.York May 5, 2011 Application Submitted May 5, 2011 Residential Apartments Henstock, Sarah
416-392-7196

An application to amend City of Toronto Zoning By-law No. 438-86 and Zoning By-law 1156-2010 to permit a mixed use development with two 58-storey towers containing 960 residential condominium units on a shared 7-storey podium. The podium would contain retail uses at grade and five storeys of above grade parking with 302 parking spaces for residents and 58 parking spaces for visitors. Above grade parking is required because the TTC subway tunnel runs the length of the property. The height of the towers would be 192 metres. Driveway access and servicing would be from Maitland Place. The lobbies for the residential condominiums would be on Alexander Street and Maitland Street.

42 CHARLES ST E

OPA / Rezoning 11 194814 STE 27 OZ Ward 27
- Tor & E.York May 13, 2011 --- --- --- ---

Rezoning application for new residentil condo building 56 stories Plus mechanical penthouse - 570 residential units - 5 levels below grade parking - 215 parking spaces - 203 bicycle parking spaces.

85 HARBOUR ST

Site Plan Approval 11 194925 STE 28 SA Ward 28
- Tor & E.York May 13, 2011 --- --- --- ---

Site Plan Approval for Waterpark Phase III site - linked to previous approvals and existing development at 10-20 Bay St. - proposing office tower, 30 storeys, 128.55m at highest point - approximately 83,515 sq.m- would join into the Phase I and II buildings to the east

40 SCOTT ST

OPA / Rezoning 11 190645 STE 28 OZ Ward 28
- Tor & E.York May 9, 2011 --- --- --- Henstock, Sarah
416-392-7196

The purpose of the rezoning application is to permit a 58-storey residential building comprised of a 5-storey podium and 53-storey tower. The proposed building is 195 metres tall including the mechanical penthouse and contains 513 units. The gross floor area of the building is 48,605 square metres which includes 734 square metres of ground floor retail uses. The proposal includes 365 car parking spaces in 5 levels of underground parking. The applicant is proposing to demolish the existing 7-storey structure and preserve and reuse its stone cladding for the new podium. The applicant has advised it is their intent to develop this project as a condominium.

15 MERCER ST

OPA / Rezoning 11 190616 STE 20 OZ Ward 20
- Tor & E.York May 9, 2011 --- --- --- --- --- --- --- --- --- --- ---
Rezoning applicaiton to permit the redevelopment of the ladns for the purposes of a new mixed use building 49 stories in height complete with 567 rediential dwelling units and 1220 square meters of retail ground floor space. Included in the proposal is the retention of the street facing facades of the heritage buildings on the lands
 
My interpretation of the future Yonge/College area skyline.

5719368119_9ffa56954f_b.jpg
 
http://www.buzzbuzzhome.com/Forum/default.aspx?g=posts&t=503

Heads up by yyzer on UrbanToronto

Rumor, rumor, read all about it!!

Cityzen & Castlepoint have hired the world renown Architectural firm "Norman Foster" based in London England for the Cherry Street project which architectural design team includes two local stars Bruce Kuwabara and Peter Clewes.

Foster+Partners: http://www.fosterandpart...m/Practice/Default.aspx
Bruce Kuwabara: http://www.kpmbarchitect...&fid1=35&fid2=1
Peter Clewes: http://www.architectsall...m/partners/peter-clewes
Site Info: http://blog.mycondomylif...-site-acquisitions.html

Wow! If this is true, this will be epic for Toronto's waterfront and the Cherry Street and Queen Quay area.
 
Last edited:
http://blog.mycondomylife.com/cityz...5/waterfront-project-gets-lead-architect.html

Foster + Partners Chosen as Lead Architect for Toronto Waterfront Project

We at Cityzen Developments are very excited today to be able to announce that following a comprehensive international search, renowned firm Foster + Partners has been selected to serve as lead architect on our new Toronto waterfront project.

"This is a further signal of our efforts to lead by design,” says our principal Sam Crignano “Foster + Partners are among the very elite of architects in the world today."

Castlepoint Realty’s Alfredo Romano sees bringing Foster + Partners here as a "huge win for the City of Toronto and the Waterfront. It’s a game changer."

A joint venture of award winning architects Peter Clewes of Architects Alliance, Bruce Kuwabara of KPMB of Toronto, and Landscape Architect Claude Cormier of Montreal complete the Design Team.

Led by Foster + Partners, the design team and 3C Lakeshore Inc. (a joint venture between Cityzen Development Group, Castlepoint Realty Partners of Toronto and Continental Ventures Realty of New York) are meeting this week in London to start the process of designing a vibrant neighborhood on Toronto’s waterfront.

Subsequent design sessions are scheduled for both Toronto and New York and newly minted plans will be unveiled later this year.

"The Waterfront represents a special opportunity for Toronto’s growth. We are elated to have Foster + Partners lead in designing this exciting new neighborhood and our first venture in Canada," states Jane Gol of New York's Continental Ventures Realty.
At over 13 acres, the 3C site is the largest contiguous tract of land on Toronto’s East Bayfront. Zoned for 2.5 million square feet of residential, retail, hotel, entertainment and cultural uses; it is also the single largest development project in downtown Toronto.

Very exciting times ahead! Follow us on Facebook and Twitter to be kept in the loop on all the latest developments!
 
Another office project to start soon in Toronto:

Queen-Richmond Centre, 17 storeys

qrcc.jpg


This Project will get going very soon.

Demolition will start soon, the Existing Facades will be retained and braced while the interior slabs will be demo'd down. The Massive X jacks is being detailed by Walters of Hamilton and the Structural Glass that surrounds the 5 storey atrium is being detailed by Novum Structures.
 