Jared said:I'm adding ROCP3 right now.
If I understand this properly, phases 1 and 2 both have a single tower each, phase 3 has 2 towers, 196m and 75m on top of a common podium?
bhbhbh said:hey everybody, right now there are a bunch of semi-tall office towers going up. do you think this is the begining of a new boom like in the 80's?
goodlookin' said:"phases 1 and 2 both have a single tower each, phase 3 has 2 towers, 196m and 75m on top of a common podium?"
Seriously doubt this newest proposal will be sold as a single phase (and most likely will be redesigned)
goodlookin' said:"phases 1 and 2 both have a single tower each, phase 3 has 2 towers, 196m and 75m on top of a common podium?"
Seriously doubt this newest proposal will be sold as a single phase (and most likely will be redesigned)
caltrane74 said:200 meters fits this area. going to say 210-220 might be going a bit crazy at this interesection.
Queen's Park contributes to subway station make-overs
Charitable group to renovate three downtown stops
James Cowan, National Post
Published: Friday, June 09, 2006
The Ontario government yesterday committed $2-million toward refurbishing Toronto subway stations, beginning with a plan to brighten the platform at Museum station with fake totem poles, Greek columns and Egyptian sarcophagi.
The Toronto Community Foundation, a charitable organization, wants to renovate three downtown stations to make them reflect nearby cultural attractions.
Along with creating an air of antiquity at Museum station, the group wants to splash murals on the walls of St. Patrick station, which serves the Art Gallery of Ontario, and revitalize Osgoode station to reflect its proximity to the new Four Seasons Centre for the Performing Arts.
Anne Swarbrick, the foundation's president and CEO, said the make-overs will serve to link "the above-ground attractions and the below-ground platforms."
Refurbishing Museum station will take between $4-million and $5-million; the total cost for the three stations is estimated at $14-million.
The TTC has agreed to pay one-quarter of the costs, while funds are also being solicited from the private sector.
"We have been engaging private interests in public spaces in this city," Ms. Swarbrick said.
The foundation still needs to raise $250,000 to complete the Museum station renovation. However, as fundraising efforts continue, the TTC intends to begin work on Museum this year and complete the first platform makeover by November, 2007.
Howard Moscoe, the TTC's chairman, noted the Museum station desperately needs a facelift. "More than 430 million people each year ride the TTC. Most of them pass through this location, look around and see early Canadian washroom architecture," he said.
Mr. Moscoe said he hoped the beautification project would extend to other stations, noting he has already received requests for a "Casa Loma" station.
"This will be the beginning of the rebirth of our subway stations, because it is too good of an idea to keep down," Mr. Moscoe said.
William Thorsell, CEO of the Royal Ontario Museum, praised the foundation for taking an interest in deteriorating public spaces.
"We live in a city that needs to be angrier about the quality of public space," Mr. Thorsell said. "I think this project shows we are stepping out of the miasma."
TORONTO
Building Height Floors Year Status Usage
1 Trump International Hotel 1,064 70 2009 Proposed Hotel/Residential
2 One Bloor East 718 60 2010 Proposed Residential
3 Bay-Adelaide West Tower 715 50 2009 Construction Soon Office
4 Signature @ Cityplace 714 69 2010 Proposed Residential
5 Shangri-la Hotel and Tower 702 65 2009 Proposed Hotel/Residential
6 Ritz Carlton Hotel & Residences 684 53 2009 Construction Soon Hotel/Residential
7 Sapphire Tower 664 73 2009 Proposed Hotel/Residential
8 College Park Tower III 645 60 2009 Proposed Office/Residential
9 Four Seasons Hotel Tower I 633 46 2009 Proposed Hotel/Residential
10 City Centre Tower 619 51 2009 Proposed Residential
11 RBC Centre 610 43 2009 Construction Soon Office
12 Richmond Adelaide Centre II 595 41 2009 Construction Soon Office
13 Bay-Adelaide East Tower 590 43 2010 Proposed Office/Residential
14 1 King West 578 51 2005 Built Residential
15 MLSE South Tower 558 53 2008 Construction Soon Residential
16 151 Front Street West 549 36 2009 Proposed Office
17 40 Wellesley Street East 533 44 2009 Proposed Hotel/Residential
18 Bay-Adelaide North Tower 531 49 2010 Proposed Hotel/Residential
19 MLSE North Tower 529 49 2008 Construction Soon Residential
20 Quantum 2 North Tower 525 52 2008 Under Construction Residential
21 Two City Hall 522 50 2009 Proposed Residential
22 The Uptown Residences 518 48 2008 Proposed Residential
23 Festival Tower 514 42 2009 Proposed Residential
24 College Park Tower I 505 52 2006 Under Construction Residential
25 Harbour View Estates Phase 2 503 49 2005 Built Residential
26 West ONE 484 49 2007 Under Construction Residential
27 Spire 476 45 2007 Under Construction Residential
28 Montage 471 47 2007 Under Construction Residential
29 Block 26E Cityplace 466 44 2009 Proposed Residential
30 Murano Tower I 459 41 2008 Under Construction Residential
31 Pantages Tower 458 46 2003 Built Hotel/Residential
32 College Park Tower II ??? 45 2007 Under Construction Residential
33 Casa Condominiums 453 45 2008 Proposed Residential
34 18 York St. 449 37 2009 Proposed Office
35 Pinnacle Centre Tower D 449 45 2008 Proposed Residential
36 X Condominium 448 41 2008 Proposed Residential
37 The Met 431 43 2007 Under Construction Residential
38 Block 26W Cityplace 427 40 2009 Proposed Residential
39 Empire Tower 427 28 2005 Built Residential
40 Verve 422 39 2008 Proposed Residential
41 Pinnacle Centre Building A ??? 40 2006 Built Residential
42 Crystal Blue 413 34 2009 Proposed Residential
43 N 410 42 2007 Under Construction Residential
44 M5V Life 407 34 2008 Proposed Residential
45 18 Yonge ??? 39 2006 Under Construction Residential
46 Block 29 Cityplace 404 38 2009 Proposed Residential