TORONTO | Highrise Developments Compilation Thread


TRUMP - minor variance

are those open to the public???

yes

Agenda: http://www.toronto.ca/planning/south_agenda.pdf

Item 8: A0125/07TEY

The Variances requested are as follow:

1) decrease the minimum required NON-RESIDENTIAL GFA from 27,000 sq.m to 25,500 sq.m

2) increase maximum permitted number of dwelling units & guest rooms from 336 to 379

3) decrease the parking space size from a minimum 2.6m x 4.7m to 2.6m x 4.6m

There are NO variances sought for a decrease in height.. although a variance would prolly not be needed, a Revised Site Plan would probably be though. I'll check into the SPA.
 
Last edited:
Go TO!!! I might be moving to Toronto. I'm stoked, I'm out of this f*cking conservative dump of a country. I'm cummin north baby. I love how Toronto embraces urbanity and density, not like San Diego. Here we complain about a little 12 floor building 1.5 miles from downtown. They say "oh it's going to ruin the small town charm of the neighborhood, and cause a wind tunnel" christ I'm outta here.
 
Hey Mello... I'm heading home to T.O. tomorrow after "many" months in San Diego.

Let's get a consortium together, raise $100 billion and buy all of downtown San Diego. Every Toronto developer will hop on our train 'cause San Diego is an urban "lost" opportunity. And T.O. developers are already sniffin' around SD.

It'll take a while to build a dream city... but watch out San Francisco. The weather's better in SD. ;-)

P.S. I've budgeted moving the airport, so we can build 1000 footers.
 
^^^ Fark yeah lets do it! Its on G. I love TO we love it! Get it like the "I love LA song" seriously somebody should do a song called "I love TO"

HA HA Now I can smoke weed in front of cops!
 
i am so confused...

lol

Talon submitted an application to the Committee of Adjustments (a committee at the city that deals with minor variances and land partitions "severances". This Committee is composed of city councillors and are advised by the planning and other city departments on what decision to make on applications made by homeowners and developers when they want to revise the zoning restrictions or sever their properties). Talon's application to the C of A only asked to drop the required amount of office space and raise the maximum amount of units that were spelled out in the original zoning by-law for the property. Additionally, they're asking to vary the required size of parking spaces in order to save space / increase the amount of parking.
 
Two interesting reports in the May Council agendas:

939 Lawrence Ave. E., 49 & 75 The Donway West

32 Storeys (99.5m)

http://www.toronto.ca/legdocs/mmis/2007/ny/bgrd/backgroundfile-2993.pdf

939_Lawrence_site.jpg


939_Lawrence_model.jpg



1 Front St. E.
Hummingbird Centre
Preliminary Report: http://www.toronto.ca/legdocs/mmis/2007/te/bgrd/backgroundfile-2905.pdf

57 Storeys (205m)

hummingbird.jpg
 
:tomato: I ain't stoned foo! I'm just a little buzzed off some vodka dats all. But yeah those 32 floor towers are goofy as fuck. Come on TO we expect better from you. You are the mega city, lets step it up mang
 
four seasons will be starting this year it appears...

Breaking News:

Walked into the packed sales centre today and in a conversation to set up an appointment one of the sales staff informed us that "the three most expensive penthouses are already sold".. when I asked her to confirm that indeed somebody had paid $16 million for the most pricey unit she replied, "yes, and I can tell you that the buyers ARE LOCAL and not overseas customers"

wow, looks like a construction announcement could be happening very very soon (a la Ritz Carlton)... amazing news!!

http://www.skyscrapercity.com/showthread.php?t=267216&page=20
 
Vikky at SSC took these photos... of the FS Sales Centre.

DSC01676.jpg


Very nice. Very upscale.

Apparently the penthouses have already sold out.

DSC01672.jpg


DSC01675.jpg
 
Under Construction

NAME-------------------------YEAR-----HEIGHT------------FLOORS

COLLEGE PARK TOWER I---------2006-----505 FT / 154 M----52 - COMPLETED
HVE 2 (CITYPLACE)------------2005-----503 FT / 140 M----49 - COMPLETED
WEST ONE (CITYPLACE)---------2006-----484 FT / 148 M----55 - UNDER CONSTRUCTION
SP!RE------------------------2006-----476 FT / 145 M----45 - COMPLETED
COLLEGE PARK TOWER II--------2006-----??? FT / ??? M----45 - UNDER CONSTRUCTION
THE MET----------------------2006-----431 FT / ??? M----43 - UNDER CONSTRUCTION ( ALMOST COMPLETE)
N----------------------------2006-----415 FT / 126 M----42
N1 (CITYPLACE)---------------200?-----??? FT / 125 M----42
PINNACLE TOWER A-------------2005-----397 FT / ??? M----40 - COMPLETED
18 YONGE---------------------2006-----??? FT / ??? M----39 - COMPLETED
QUANTUM (MINTO)--------------2007-----387 FT / 118 M----37 - UNDER CONSTRUCTION
EQUINOX EAST TOWER-----------2005-----??? FT / ??? M----37 - COMPLETED
EQUINOX WEST TOWER-----------2005-----??? FT / ??? M----37 - COMPLETED
HVE 3 SOUTH (CITYPLACE)------2005-----??? FT / ??? M----36 - COMPLETED
PLATINUM TOWERS I------------2005-----??? FT / ??? M----36 - COMPLETED
ULTIMA-----------------------2005-----??? FT / ??? M----35 - COMPLETED
INFINITY---------------------2005-----??? FT / ??? M----35 - COMPLETED
360@THE CITY CENTRE----------2005-----??? FT / ??? M----35
MERIDIAN BUILDING SOUTH------2006-----??? FT / ??? M----31
PINNACLE TOWER B-------------2006-----??? FT / ??? M----30 - COMPLETED
MANSIONS OF HUMBERWOOD 2-----2005-----??? FT / ??? M----29
WINDMERE BY THE LAKE---------2005-----??? FT / ??? M----28
ATLANTIS---------------------2005-----302 FT / ??? M----28
JAZZ-------------------------2005-----256 FT / ??? M----28
HVE 3 NORTH (CITYPLACE)------2005-----??? FT / ??? M----26
HVE 4 (CITYPLACE)------------2005-----??? FT / ??? M----26
22---------------------------2006-----243 FT / ??? M----23
ELEMENT----------------------2006-----226 FT / ??? M----25
TIDES@MYSTIC POINTE----------2005-----??? FT / ??? M----24
BATTERY PARK PHASE I---------2005-----??? FT / ??? M----23 - COMPLETED
COSMO PHASE I----------------2005-----??? FT / ??? M----23 - COMPLETED
COSMO PHASE II---------------2005-----??? FT / ??? M----23 - COMPLETED
HUDSON-----------------------2005-----226 FT / ??? M----21 - COMPLETED
THE ROCKERFELLER-------------2005-----??? FT / ??? M----20 - COMPLETED

Approved

APPROVED

NAME-------------------------YEAR-----HEIGHT------------FLOORS

TRUMP INTERNATIONAL HOTEL----2008---1,066 FT / 325 M----70
1 BLOOR EAST-----------------2007-----718 FT / 219 M----60
SIGNATURE TOWER (CITYPLACE)--2007-----714 FT / 218 M----69
RITZ-CARLTON HOTEL-----------2009-----665 FT / 203 M----53 - UNDER CONSTRUCTION
RICHMOND ADELAIDE CENTRE-----2007-----595 FT / 181 M----41
QUANTUM 2 MINTO MIDTOWN-----2007-----525 FT / 160 M----52 - UNDER CONSTRUCTION
THE UPTOWN RESIDENCES--------2006-----518 FT / 158 M----48 - UNDER CONSTRUCTION
FESTIVAL TOWER---------------2006-----514 FT / 157 M----42 - UNDER CONSTRUCTION
MURANO SOUTH TOWER-----------2006-----459 FT / 140 M----41 - UNDER CONSTRUCTION
N2---------------------------200?-----??? FT / ??? M----41
18 YORK ST-------------------2006-----449 FT / 137 M----37
PINNACLE CENTRE BUILDING C---2006-----449 FT / 137 M----46
MURANO NORTH TOWER-----------2006-----371 FT / 113 M----34
WATERPARK PLACE III----------200?-----351 FT / 107 M----??
NEO (CITYPLACE)--------------200?-----??? FT / ??? M----16

PROPOSED

NAME-------------------------YEAR-----HEIGHT------------FLOORS

SAPPHIRE TOWER---------------2008---1,122 FT / 342 M----90 - NOT APPROVED
SHANGRI-LA HOTEL-------------2008-----690 FT / 210 M----65 - APPROVED IN SALES
FOUR SEASONS HOTEL-----------2009-----672 FT / ??? M----55 - APPROVED - IN SALES
SIMCOE TOWER II--------------2009-----??? FT / ??? M----50
BAY ADELAIDE WEST TOWER------2008-----779 FT / ??? M----62 - UNDER CONSTRUCTON ( 218m - revised)
BAY ADELAIDE EAST TOWER------2008-----??? FT / ??? M----53
CITYCENTRE TOWER-------------2008-----619 FT / 189 M----51
20 YORK ST-------------------200?-----549 FT / 167 M----36
MLSE SOUTH TOWER-------------2008-----558 FT / ??? M----53 - UNDER CONSTRUCTION (186m)
ONE CITY HALL PHASE II-------2009-----??? FT / ??? M----50
MLSE NORTH TOWER-------------2008-----529 FT / ??? M----49 - UNDER CONSTRUCTON (174m)
590 JARVIS-------------------2007-----487 FT / 148 M----45
PARKWAY FOREST A1------------2008-----479 FT / 146 M----48
RITZ-CARLTON-----------------2008-----??? FT / ??? M----48 UNDER CONSTRUCTON
33 CHARLES ST EAST-----------2006-----453 FT / 138 M----43
ROM CONDO TOWER--------------2008-----??? FT / ??? M----40 - NOT APPROVED
PARKWAY FOREST A2------------2008-----420 FT / 128 M----42
PARKWAY FOREST B-------------2008-----420 FT / 128 M----42
PARKWAY FOREST C-------------2008-----420 FT / 128 M----42
PARKWAY FOREST A3------------2008-----390 FT / 119 M----39
PARKWAY FOREST D1------------2008-----390 FT / 119 M----39
PARKWAY FOREST D2------------2008-----390 FT / 119 M----39
1 BEDFORD RD SOUTH TOWER-----200?-----363 FT / 111 M----32
TIP TOP PHASE 2--------------200?-----351 FT / 107 M----37
 
Last edited:
nice list. ( Thanks for your hard work)


I scooped out the part that is important to us.. ( And I will convert hieghts to Canadain if I can)

Under Construction
1) RBC Centre [Simcoe Place] - 600 ft. 42 floors
2) Quantum II [Minto Midtown] - 525 ft. 52 floors
3) West ONE [CityPlace] - 476 ft. 49 floors
4) Murano South Tower [The Murano] - 461 ft. - 43 floors
5) College Park Tower II [RoCP] - 458 ft. 46 floors
6) Montage [CityPlace] - 449 ft. 47 floors
7) Telus Tower - 446 ft. (not including spire) 30 floors
8) The MET Phase I [The Met Condos] - 431 ft. 43 floors
9) Verve - 422 ft. 39 floors
10) N1 [CityPlace] - 415 ft. 42 floors

Building Sites Undergoing Demolition/Site Prep/Excavation
1) Bay-Adelaide Centre West Tower [Bay-Adelaide Centre] - 715 ft. 50 floors
2) Ritz Carlton Hotel [Simcoe Place] - 684 ft. 53 floors
3) Maple Leaf Square Tower I [Maple Leaf Square] - 610 ft. 54 floors
4) Maple Leaf Square Tower II [Maple Leaf Square] - 571 ft. 50 floors
5) *Absolute World South [Absolute Condominiums] - 548 ft. 56 floors
6) Festival Tower - 541 ft. 42 floors
7) The Uptown Residences - 518 ft. 48 floors
8) Pinnacle - Northwest Tower [Pinnacle Centre] - 516 ft. 50 floors
9) *Absolute World North [Absolute Condominiums] - 495 ft. 50 floors
10) Casa - 453 ft. 45 floors
11) X Condominiums - 448 ft. 44 floors
12) Pinnacle - Southwest Tower [Pinnacle Centre] - 443 ft. 45 floors
13) Luna Vista [CityPlace] - 413 ft. 38 floors

Sales
1) Trump International - 919 ft. 57 floors
2) Four Seasons Hotel [Four Seasons] - Approx 686 ft. 50 floors
3) Sapphire Tower - 643 ft. 62 floors

Pre-Sales
1) 1 Bloor East - 732 ft. - 76 floors
2) Shangri-La - 704 ft. 65 floors
3) The L Tower [Hummingbird Centre] - 673 ft. 57 floors
4) Burano [The Murano] - 518 ft. 48 floors
5) Clear Spirit Living - Tower I [Clear Spirit Living] - 509 ft. 48 floors
6) Clear Spirit Living - Tower II [Clear Spirit Living] - 433 ft. 40 floors
7) MetroGate Tower I [MetroGate] - HEIGHT NEEDED - 42 floors
8) MetroGate Tower II [MetroGate] - HEIGHT NEEDED - 42 floors

Approved Proposals
1) Signature Tower [CityPlace] - 714 ft. 69 floors
2) Bay-Adelaide Centre East Tower [Bay-Adelaide Centre] - 590 ft. 43 floors

Proposals Not Yet Approved
1) Hullmark Centre - 538 ft. 45 floors
2) 40 Wellesley - 533 ft. 44 floors
3) Two City Hall [One City Hall Condominiums] - 522 ft. 50 floors
4) *Parkside Village - Tower I [Parkside Village] - 505 ft. 50 floors
5) *Parkside Village - Tower II [Parkside Village] - 456 ft. 45 floors
6) *Parkside Village - Tower III [Parkside Village] - 456 ft. 45 floors
7) 50 St. Joseph Street Building C [St. Mike's Parking Lot] - 443 ft. 45 floors
8) 1501 Yonge Street - Tower I - 417 ft. 39 floors
9) *Parkside Village - Tower IV [Parkside Village] - HEIGHT NEEDED - 40 floors
10) *Parkside Village - Tower V [Parkside Village] - HEIGHT NEEDED - 40 floors

Rejected Proposals
1) Aura [RoCP] - 787 ft. 75 floors

Proposed Office Towers
1) Richmond-Adelaide Centre [Richmond-Adelaide Centre] - 595 ft. 41 floors
2) 20 York Street/151 Front Street/7 Station Street - 576 ft. 36 floors
3) 18 York - HEIGHT NEEDED - 26 floors

Visions
1) "Toronto Landmark" by Bazis International - 3 Towers

Sub-Totals
Built - 41
Buildings Under Construction - 10
Building Sites Undergoing Demolition/Site Prep/Excavation - 13
Residential, Hotel, or Mixed Use Towers In Sales - 3
Residential, Hotel, or Mixed Use Towers in Pre-Sales - 8
Approved Residential, Hotel, or Mixed Use Towers - 2
Proposals Not Yet Approved - 10
Rejected Proposals - 1
Proposed Office Towers - 3
Visions - 3

Grand Total: 94

-------------------- We can use this marker for our files for the next 6 months to a year.
 