TORONTO | Highrise Developments Compilation Thread


The Well | 174.03m | 46s | RioCan | Hariri Pontarini l u/c

9f016ef8-04ca-46b2-a8b2-06dec250bc32-jpeg.434119

ProjectEnd
img_4543-1-jpg.434327

Urban-Affair

Looking down on the east-west portion of the glass canopy (called the “Pedestrian Spine” by architects HPA). The green-roofed mid-rises along Wellington Street are on the right.

20221021_172015-jpg.434405

generalcanada

e7265705-417a-4058-86c4-f88ffa30f247_1_201_a-jpeg.433800

Red Mars

A brief but stunning drone video travelling under the glass canopy.

https://i.imgur.com/XliLF6e.mp4

daptive


Pinnacle One Yonge | 312.5m | 95s | Pinnacle | Hariri Pontarini l u/c

Phase 1 getting the last of its white fritted glass “swoosh” back (entire tower had to be reclad with new balcony glass).

dsc09998-jpg.434384

Northern Light
dsc00004-jpg.434386

Northern Light

Phase 2 (SkyTower) crane in the centre, Phase 1 behind.

1yonge_2-jpg.434935

jackattack

Phase 2 podium u/c.

dsc00008-jpg.434390

Northern Light
9e8ddb29-1d3f-4b51-bf84-59cb4ad82b6d-jpeg.432668

mburrrrr
 
Last edited:
r9Idxeh.jpg

https://www.picuki.com/profile/daniel_martens20


CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre l Phase 2 u/c

Great Phase 1 set from jackattack at UT.

6be987a4-9cea-41bf-86b5-5ea45206e394-jpg.434913

jackattack
6f70d3d2-c854-4561-b9bd-562587dfa8f2-jpg.434911

jackattack
b1c05d80-521f-4f31-b3f9-0e6b78f1af77-jpg.434908

jackattack

Nice up-lighting on the curvy planters/benches along the park/deck over the rail corridor.

82192752-f6ba-4093-8364-c6f94433c5a9-jpg.434910

jackattack
acdd0a1e-3e4a-4e6a-bcde-3c0cdafceaad-jpg.434909

jackattack

Phase 2 core.
img_6179-jpeg.434053

Johnny Au


Eight Cumberland | 170m | 51s | Great Gulf | a—A l u/c

Cool shot through morning fog. Upper right is Yonge and Eglinton (a long way up the hill).

20221025_090519-jpg.434881

BloorMan


T3 Bayside | 42m | 10s | Hines | 3XN l u/c

The first of 2 mass timber building by 3XN on the waterfront.

dsc09965-jpg.434362

Northern Light
dsc09980-jpg.434367

Northern Light

A little light magic on the south face.

4e401042-7c8d-4a6b-8364-7f9ef78aaaf2-jpeg.431862

TheSix


York University/Seneca College: Markham Centre Campus | 56.08m | 13s | York University | Diamond Schmitt l u/c

Great cladding keeping its render promises.

d14e021f-e69c-455f-b31b-a81be4e4786b-jpeg.434722

StealthyArrow
bb8c5220-1eef-45c6-8046-7c4a15709744-jpeg.434723

StealthyArrow
f316de6d-c8d6-458b-9785-5ea16faca032-jpeg.434725

StealthyArrow
16064-90658.jpeg

UT


Plaza Midtown | 107.89m | 34s | Plaza | BDP Quadrangle l u/c

On a misty morning.

img_1900-jpg.434815

Lamor
24888-81586.jpg

UT


The Hampton | 123.13m | 38s | Collage Works | BDP Quadrangle l u/c

Pixel snowflake balcony glass being installed.

20221017103033__mg_6339-jpg.433334

Lamor
1d6eb810-3762-4711-8f73-078391b82cac-jpeg.430087

imerk


Scala | 61.57m | 18s | Tridel | Wallman Architects l complete(?)

Roof-top amenities include a downhill ski hill.

20221025_171654-jpg.434817

Undead
20220901_102658-jpg.424656

shammyjammy
2QJAsTJnny.jpeg

AlbertC


Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects l u/c

20221010_1324212-jpg.431906

tripwire


504 Wellington Street West | 49.5m | 13s | Lifetime | Wallman Architects l pre-construction

Small infill condo just west of The Well and KINGToronto.

24649-149904.jpeg

UT

The mid-rises of The Well are on the bottom left and KING Toronto is right of centre.

24649-149908.jpeg

UT


iUj0BfL.jpg

https://www.picuki.com/profile/joaquinthroughthe6


Bathurst Quay Revitalization | ?m | ?s | City of Toronto | Kearns Mancini l u/c

17e54c9e-2cfc-4d15-add5-35e9655afd9a-jpeg.435212

mburrrrr

Restoration of the south silos on the left nearing completion.

1d3fe3ee-a3a1-45a8-a453-f8da00cd5d9a-jpeg.435208

mburrrrr

Performance and event spaces.

52005ce1-7e8f-489d-bf53-7189da2d4653-jpeg.435207

mburrrrr
b6ec44b4-a973-438b-8c54-ae3252c2574c-jpeg.435237

Bowen
49701-149290.jpeg

UT
97c32f70-ca99-44e3-a704-2b5ce8b290f9-jpeg.435211

mburrrrr
49701-149281.jpeg

UT

Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A l u/c

sugarwharf_1-jpg.435103

jackattack
sugarwharf_3-jpg.435105

jackattack
sugarwharf_9-jpg.435114

jackattack
 
Last edited:
The One | 338.3m | 94s | Mizrahi Developments | Foster + Partners l u/c

Another big pour underway yesterday, this one for the first mechanical level I believe.

ad77ba16-a48e-482e-bf01-a437e82c0558-jpeg.435536

Benito

Note the super-columns are taller for this mech level.

5be9d9dc-feb0-4dcd-bf81-54f6f8790cd4-jpeg.435538

Benito
utimg_9997-jpg.435758

jer1961

Alien concrete pouring gizmo.

b789a517-9372-4ba4-929a-17cc4f251ed0-jpeg.435682

thaivic

utimg_9871-jpg.435761

jer1961

The completed octagonal floor of the first mechanical level (inset from the usual floor-plates).

74baa588-18f4-455d-ae82-6bd1c7586d26-jpeg.435797

Benito

Moody skies.

c873fce1-d133-4235-a52e-f00c4780ec9d-jpeg.435677

thaivic


CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre l Phase 2 u/c


img_6226-jpeg.435765

Johnny Au

Yonge Street was closed yesterday for demolition to make way for the new elevated pedestrian walkway to be built east over Yonge Street from the Phase 2 tower now u/c.

c387d7e4-aeb8-49e6-a0fa-eac7a091d957-jpeg.435620

UT

An army of heavy equipment descends on the (south of Front) Yonge Street tunnel under the rail corridor, to demo a portion to make way for a new elevated walkway east from Phase 2.

e80ef7ad-bac0-464f-9e60-2c0cccea53c4-jpeg.435454

mburrrrrr

7 am it begins.

ce188b98-0c6b-4f9e-8396-0dcea828c824-jpeg.435446

mburrrrr
114fe791-a710-431a-afa3-0f00417281e9-jpeg.435607

mburrrrr

5 pm - earthquake alert?

cc1105b5-49ea-4ab3-8417-caa63ec42a2f-jpeg.435705

mburrrrr
a663231d-78ee-4e6f-9d8d-14925841ca64-jpeg.435711

mburrrrr
b43aab4c-94fd-4edf-ac8c-0cf2b7bc8021-jpeg.435144

rbm


Canary Landing | 89.61m | 26s | Dream | COBE Architects l u/c

Magical yellows of sunlight bouncing off of the angled white pre-cast panels.

canarylanding_8-jpg.434927

jackattack
canarylanding_5-png.434924

jackattack

Hand-laid brick underway for the podium.

ef6579df-68c6-45d0-bfe1-dd3820780c6a-jpeg.435735

everydayhim


The Whitfield | 130m | 39s | Menkes | Giannone Petricone l excavation

On the right is the block-buster ‘Time & Space’ (from developer Pemberton who seems determined to match every great project underway, with a stinker of their own).

45ddc259-0d25-4aaf-b0fc-3e15fc66d09d-jpeg.435531

bilked
36331-139856.jpeg

UT


The Twelve Hundred | 29.32m | 8s | Fieldgate | IBI Group l excavation

Mid-rise condo and retail on Dundas West near Ossington.

7a9d2b7c-b7ba-4f67-bf00-00d844d9ebbf_1_201_a-jpeg.434826

Red Mars
27609-133674.jpeg

UT


XO Condos | 53.64m | 14s | Lifetime | Core Architects l u/c

On the right with the Humber Bay skyline and Mississauga looming behind.

20220920_134020-jpg.428038

tstormers

Through the transit spider web covering the intersection.

20221028_153046-jpg.435702

kotsy


XO2 Condos | 71.7m | 19s | Lifetime | Turner Fleischer l excavation

20221028_152944-jpg.435703

kotsy
46920-139973.jpeg

UT


A couple of things in Scarberia, North York and the ‘burbs:


255 Morningside Avenue l ?m l 25s l First Capital l Diamond Schmitt l pre-construction

Mix of colours helps this one a bit. 456 residential units and retail (eventually a park when the block is built out).

1666876476345-png.435279

UT


2941 Eglinton Ave E l ?m l 44s l Achille Developments KirKor l pre-construction

Kind of busy with so many ‘volumes”. Also located in Scarborough (near a GO Station) with 555 residential units in a mixed-use tower.

1666873126499-png.435265

Northern Light


720 Sheppard East | 73m | 20s | Sky Property Group | Kirkor Architects l pre-construction

Mixed-use about halfway between Bayview Avenue and Leslie in North York. Lots of retail planned (though units are smallish) which may help explain the block-long podium ;-).

1666775969092-png.434939

Northern Light
1666775866111-png.434938

Northern Light


9218 Yonge (Richmond Hill) | ?m | 42s | Taheri | Icon l pre-construction

796 residential units and retail.

1-45-jpg.435576

UT
 
Last edited:
Cranes everywhere west of the core.

utcranesphoto1-jpg.436420

bhwilkins
utcranesphoto2-jpg.436421

bhwilkins
utcranesphoto3-jpg.436422

bhwilkins


CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre l Phase 2 u/c

d27f047c-eedc-4fda-aaf1-e1fca4a0cebc-jpeg.436590

gregv
e6ba789a-7adb-44ac-b984-3eb89936cc05-jpeg.436591

gregv
43d03c00-664b-4521-b372-d2102d14b7bf-jpeg.436596

gregv

Behind is the completed demolition of a portion of the rail corridor tunnel to make way for the future elevated walkway across Yonge Street to the east.

e0e8bb0a-d2ca-45e9-885f-dd57b7f934f0-jpeg.436601

gregv


Pinnacle One Yonge | 312.5m | 95s | Pinnacle | Hariri Pontarini l u/c

Couple of new SkyTower renderings from Pinnacle.

screenshot_20221102-121730_instagram-jpg.436604

ushahid
screenshot_20221102-122428_instagram-jpg.436607

ushahid
20221028_155846-jpg.435715

Ikov.rc


Scout Condos | 38.65m | 12s | Graywood | CMV l u/c

I like this one, particularly since it employs humaniod bricklayers instead of pre-cast.

20221102_085239-jpg.436576

AlbertC
20221102_085120-jpg.436575

AlbertC
20221102_091210-jpg.436578

AlbertC


56 Fieldway | 136.55m | 42s | Ellis Don Developments | BDP Quadrangle l pre-construction


Big jump in a revised submission for 42, 34, 25 and 12-storey mixed-use buildings (1324 condo units) located east of Kipling and south of Bloor Street West (in a largely industrial neighbourhood between 2 transit hubs). Ellis Don has been one of Canada’s leading construction companies for decades and I believe this is one of their first as a developer (wonder who will construct it lol? ;-).


46158-150126.jpeg

UT
46158-150125.jpeg

UT


266 Royal York | 127m | 37s | Royal Mimico | IBI Group l pre-construction

824 condo units and retail in 2 towers on Royal York Road midway between the Gardiner Expressway and Lake Shore Blvd.

46658-150223.jpeg

UT
46658-150224.jpeg

UT


2 Temple | 53.1m | 14s | Curated Properties | RAW Design l pre-construction

Mix of rental and condo just west of Dufferin near Liberty Village.

44144-150222.jpeg

UT


170 Roehampton | 153.5m | 46s | Capital Developments | Sweeny &Co l pre-construction

630 condo and rental units. New renderings below.

170-rohamton-jpg.436832

AlbertC

Love to see more and more proposals with (faux?) wrought-iron railings/balcony guards.

roe3-jpg.436833

AlbertC
roe2-jpg.436834

AlbertC
 
Last edited:
Some breaking news... SkyTower proposed to be taller and Phase 3 is now also a super-tall:

Pinnacle One Yonge | 346.35m | 105s | Pinnacle | Hariri Pontarini l u/c

A new application proposes to increase the heights of both SkyTower (from 95 storeys to 105 storeys) and the Future Phase 3 (from 80 storeys to 92 storeys) which would now become another super-tall:


1. SkyTower u/c: height to the top of the architectural parapet (per CTBUH) is 346.35 metres (taller than The One) 

2. Phase 3 (pre-construction): height to the top of the architectural parapet (per CTBUH) is 306 metres.

Phase 3 @ 306 metres is on the left.

1667645156081-png.437198

Northern Light
 
Last edited:
181-195 Dundas St West l ?m l 41s l ICC Group l Scott Shields l pre-construction

Mixed-use with office, residential and retail at grade. Somewhat suprisingly for this location, at least 16 floors of office space are being proposed.

No eye candy renderings yet but this one has already filed a re-zoning and site-plan approval application(s).


1667661238366-png.437213

Northern Light


Cowdray Court | 130.25m | 41s | Gemterra | Teeple Architects l pre-construction

41, 35, 26 and 23 (mixed-use) storeys and public space, on Kennedy Road north of Hwy 401. No Teeple eye candy yet, just a drawing.

35388-147918.jpeg

UT


Couple of nice mid-rises:

838 Broadview | 31.67m | 8s | The Broadview Group | KUA l Approved

Mixed-use mid-rise on The Danforth.

john-lea-scaled-jpg.437070

AlbertC


4151 Kingston Road | 40.75m | 12s | Sunray Group | Chamberlain l pre-construction

Some historical-esque details echoing in this mid-rise. Kinda works. Kingston Road is “king” of the mid-rises with more than 4 dozen projects u/c, approved and proposed.

pln-ca-plans-sep-26-2022-3-jpg.437051

UT
 
CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre l Phase 2 u/c

2226b7b7-73f5-4859-848c-902a07cc4052-jpeg.437166

Ryan_T
utimg_1884-jpg.437152

jer1961
utimg_1891-jpg.437153

jer1961

Microsoft’s new offices in Phase 1, filled with Canadiana and geography design references plus art installations from Canadian artists… and some cutting-edge tech of course ;-). Originally planned to host 500 new employees, the final tally is 2,500 folks will call this home.

SLP_3930-1024x681.jpg

Canadian Business
22004-28-1-1024x768.jpg

Canadian Business
22004-16-1-1024x768.jpg

Canadian Business
22004-09-1-1024x768.jpg

Canadian Business


The Well | 174.03m | 46s | RioCan | Hariri Pontarini l u/c

Inside.

img_3479-jpeg.437206

unicornsample
img_3481-jpeg.437207

unicornsample

Outside (Wellington Street).

763873a2-9815-484f-b702-a2ac7205b037_1_201_a-jpeg.437182

Red Mars
504a7b3c-15bc-430d-b84c-049ad5c617ca_1_201_a-jpeg.437186

Red Mars
17c740f1-27cf-42ca-89de-a8aa2341ccce_1_201_a-jpeg.437189

Red Mars
9392340a-86eb-4de2-8ff8-e4fa246c9d78-jpeg.437082

ProjectEnd
 
The One | 338.3m | 94s | Mizrahi Developments | Foster + Partners l u/c

Even if Sam gets his approval for the 338.3 metre height here... Pinnacle just checked with a proposed new height for SkyTower (u/c) @ 346.35 metres and 105 storeys.

It's your move Sam (check-mate?).


d7111c4a-266b-4171-a7cc-299fd6781313-jpeg.437244

Benito

Holy rebar Batman.

dfc2e001-835a-477a-9086-fd822a3bd303-jpeg.437248

Benito
77b9eca6-ca7f-4751-84c3-c0cb75752797-jpeg.437249

Benito
cfc3654a-6a36-42ec-a353-04e7f78d2335-jpeg.437251

Benito
utimg_1917-jpg.437154

jer1961
 
Maverick | 154.53m | 49s | Empire | IBI Group l u/c

d8265d11-9725-4b85-89fa-96ff56428d75-jpg.437269

jackattack
32071-138297.jpg

UT


Ontario Court of Justice Toronto | 95.7m | 17s | Infrastructure Ontar | Renzo Piano l u/c

Spire being installed. “Walk the plank” elements are on the right. This is a courthouse after-all (and courts are certainly back-logged) but this same-day punishment for offenders seems a bit extreme.... though highly efficient from a time management pov.

56641944-3dbf-4608-a1ef-c6f3090bbb73_1_201_a-jpeg.437351

Red Mars
f961915a-cd6e-4afb-973e-6d66fd74d5fe_1_201_a-jpeg.437357

Red Mars
17b9643e-ac3c-4329-bdfa-2b7240a4e136_1_201_a-jpeg.437348

Red Mars
ec489430-7175-4906-b320-c2fbac584c13_1_201_a-jpeg.431371

Red Mars
68da8a5a-5850-4069-b57a-be5c915c61ae_1_201_a-jpeg.437405

Red Mars
7013e4ed-386f-413c-9a76-f140d2fb228b_1_201_a-jpeg.437415

Red Mars
5a85ab23-416d-4b36-9c1a-b8d017e6b775_1_201_a-jpeg.437413

Red Mars

Sitting quietly behind City Hall.

03b6db53-5548-4146-955e-aa20ab7d53b9-jpeg.432656

ADRM
31211-93737.jpeg

UT


KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group l u/c

img_4544-jpg.434326

Urban-Affair
35969983-43e2-4cf5-b170-37a6a5a0b6e3_1_201_a-jpeg.437324

Red Mars
9543-57787.jpeg

UT

One of the glass block ‘mountains’ growing on the right.

8e3e0ff5-e552-4aaf-9f71-4198d2eac7de_1_201_a-jpeg.437326

Red Mars
9543-81831.jpg

UT


Concord Canada House | 231.97m | 74s | Concord Adex | IBI Group l u/c

Will grudgingly admit this is one of the better builds by Concord from a materials pov (faint praise though).

20220930_132044-jpg.436532

tstormers
20220930_132100-jpg.436533

tstormers

Tallest of the two (on the left) has about 52 floors left to go.

d220e1f0-f3cc-4651-99c3-3f156b160140-jpeg.436025

ProjectEnd


2525 Bathurst Street | 49.38m | 13s | IBI Group l u/c

Located near Forest Hill North.

22f221a9-dde9-4898-8415-0fbe7136dc07-jpeg.437271

skypatterns

Orange brick used is much more dynamic than the almost de-saturated brick in the rendering.

20992-75526.jpg

UT
 
Last edited:
I'm a bit perplexed, to say the least. I keep hearing and reading that Toronto's condo market has finally crashed after 20+ years, and that sales are down 79% from this month last year, yet we're still seeing new proposals and height-increase requests. Is this a case of a delayed reaction? Can someone explain the paradox?
 
Great image from Stephen Velacaso showing approved and proposed height (increases) for SkyTower* and The One... with the CN Tower to scale in between:

52481314267_e9e4eedade_k.jpg

steveve

*No longer just a super-tall according to the CTBUH criteria... but now is Super-Duper-Tall ;-).
 
Toronto has a 100+ floor proposal? Wow. What's the chances it gets approved?

Both are already under construction, they both want approval to build taller than the current plans

Sky Tower currently on the 2nd Floor
0e2f956f-14dc-426b-95d9-7c3af7b20b24-jpeg.436856


The One currently ont he 17th floor
utimg_1917-jpg.437154
 
They're under construction, but not formally approved to build at that height. For One Bloor, what are the chances of the height increase proposal being approved? Hasn't it been pending for months?
 
Last edited:
For One Bloor, what are the chances of the height increase proposal being approved? Hasn't it been pending for months?
I have been wondering the same. I don't understand why an extra 30 metres would be contentious, but it probably related to shadows cast over precious Jesse Ketchup schoolyard.
 
I have been wondering the same. I don't understand why an extra 30 metres would be contentious, but it probably related to shadows cast over precious Jesse Ketchup schoolyard.

How long does it take to make a decision. Does it really take a year or more to make a ruling on the shadow cast by this building? The big planning work happened when the building was originally approved. This incremental change should not be back to the drawing boards.
 
How long does it take to make a decision. Does it really take a year or more to make a ruling on the shadow cast by this building? The big planning work happened when the building was originally approved. This incremental change should not be back to the drawing boards.

welcome to Toronto, it takes about 2 years to go through the planning process for most new developments in the city
 
I have been wondering the same. I don't understand why an extra 30 metres would be contentious, but it probably related to shadows cast over precious Jesse Ketchup schoolyard.

The previous City Councillor was adamantly opposed to more height here. The request was put through the regular planning channel (not minor variance); and Council hasn't had a regular meeting since July, because it was an election year.

I imagine the report on this will be at one of the first couple of meetings of the new Community Council, then Council thereafter. (haven't spoken w/planning staff, just a guess)

It will have to come with additional community benefits. But the proponent new that, and I don't imagine that's a material issue.

I lean that its likely this will go through now, but its not a given. The two principle arguments against it are both to do w/precedent, to my understanding.

One is about the absolute height, and the knock-on effect on other applications proposed or incoming.

The other is 'a deal is a deal'. The height was worked out after extensive negotiation w/the Planning Dept. and the local Councillor. There is some wariness about suggesting you can get approved at height 'x' and come back and vary it during construction.
 
Last edited:


Back
Top