Thanks for the video link to the "Big Dig".
Here's a link to the Wiki article for the "Big Dig"
http://en.wikipedia.org/wiki/Big_dig
Over Budget and Schedule
The project was scheduled to be completed in 1998 at an estimated cost of $2.8 billion (in 1982 dollars, $6.0 billion adjusted for inflation as of 2006). The project was not completed until December of 2007, at a cost of over $14.6 billion ($8.08 billion in 1982 dollars) as of 2006. The Boston Globe estimated that the project will ultimately cost $22 billion, including interest, and that it will not be paid off until 2038.
Problems
1) Hundreds of leaks mainly caused by contractors not removing gravel and other debris before pouring concrete.
2) Substandard materials include bad concrete, bad fasteners, bad glue, and corroding lighting fixtures from the leaks.
Coverups
MassDOT administration team decided not to let the news of the systemic failure and repair of the fixtures be released to the public or Governor Deval Patrick's administration.
Congestion rises
A 2008 Boston Globe report asserted that waiting time for the majority of trips actually increased as a result of demand induced by the increased road capacity. Because more drivers were opting to use the new roads, traffic bottlenecks were only pushed outward from the city, not reduced or eliminated.
The Globe also asserted that their analysis provides a fuller picture of the traffic situation than a state-commissioned study done two years ago, in which the Big Dig was credited with helping to save at least $167 million a year by increasing economic productivity and decreasing motor vehicle operating costs. That study did not look at highways outside the Big Dig construction area and did not take into account new congestion elsewhere.