It looks like a tieback system, but I'm not sure if it's merely a temporary retaining wall.
For one thing, the wall is made from concrete that took multiple pours to reach its final height. Pouring a concrete wall isn't cheap, and it certainly isn't a common option for temporary shoring, if it's an option at all. Also, what are you going to do after the temporary concrete wall is finished being used as temporary shoring? Knock it down? The demolition costs for that are going to astronomical for temporary shoring.
The one thing that initially confused me about this is the anchorage for the tieback system. For most tieback systems, the tendons that tie the wall to its anchors are anchored underground. But then again, most common tieback wall designs are meant to hold back earth for under-bridge crossings. Therefore, they have the luxury of having enough room to be anchored underground. With the tendons and anchorage hidden away from the surface, the result is somewhat aesthetically pleasing.
As you can see from your first picture, the amount of room doesn't appear to be a luxury here: there's a building directly next to the development. Therefore, the geotechnical engineers likely had to modify the tieback design based on the available space to anchor the tendons. Hence, the reason why the anchorage appear above ground (though the exposed tendon ends look kind of gnarly).
So if it's the case that this is actually a permanent tieback wall system, then it can last as long as the design lifespan dictates. I would say at the very least decades, then.