Isn't The Pier proposed at 24 floors?
Isn't The Pier proposed at 24 floors?
I believe so. So, that should mean completion in about 8 more years at the current construction rate of about 3 floors per year? :haha:
That’s so fast. Incredible that they can build 24 floors in 8 years. I’ve never seen a project move so fast. They should get an award for it.
Wait I thought the height was 27 floors, capped at like 297’ for building height or something. Or am I way off?
That’s so fast. Incredible that they can build 24 floors in 8 years. I’ve never seen a project move so fast. They should get an award for it.
Wait I thought the height was 27 floors, capped at like 297’ for building height or something. Or am I way off?
I'm not sure which project you're referring to?
Peaking through the fence at 100 Mill:
Looks like they have about caught up with the Pier.
What project is this?
Thanks for the pics, CB.
I really hope we start to see some activity on the other parcels within this Novus phase. I know the last few planned developments are the office building next to 777, food hall mixed-use project, high rise residential, asu office building across from 777 tucked up to the parking garage that is in planning & development review.
Does anyone think we will see the next phase (where the asu track and old baseball stadium is) get demo'd and start within the next year?
Thanks for the pics, CB.
I really hope we start to see some activity on the other parcels within this Novus phase. I know the last few planned developments are the office building next to 777, food hall mixed-use project, high rise residential, asu office building across from 777 tucked up to the parking garage that is in planning & development review.
Does anyone think we will see the next phase (where the asu track and old baseball stadium is) get demo'd and start within the next year?
There's been rumors that's where the ASU multi-purpose arena will be going in (Hockey and olympic sports). I could never tell if it would be on the parking lot immediately west of Sun Angel Stadium or on the stadium itself. But now due to the pandemic, not sure if these plans have been put on hold.
Still planning on having it completed by August 2022: https://www.azcentral.com/story/sports/college/asu/2020/10/06/asu-hockey-play-away-only-2020-21-season-against-big-ten-teams/5901278002/
Preliminary work has been done on the site for ASU's 5,000-seat multi-purpose arena for hockey and other sports and events near Sun Angel Track Stadium. Powers expects that facility to be open by August 2022.
There's a lot of stuff going on behind the scenes," he said. "Obviously navigating those waters through a pandemic has been challenge, but we're still confident it's on pace. We expect some exciting news over the course of the next monht or so," perhaps meaning a formal groundbreaking.