Overview
Study (ASN): 2020-AWP-7818-OE
Prior Study:
Status: Work In Progress
Received Date: 07/16/2020
Entered Date: 07/16/2020
Map: View Map
Construction Info Structure Summary
Notice Of: CONSTR
Duration: TEMP (Months: 18 Days: 0)
Work Schedule: 07/01/2021 to 12/31/2022
Structure Type: Crane
Structure Name: Tempe Depot - North Crane
FCC Number:
Structure Details Height and Elevation
Latitude (NAD 83): 33° 25' 41.02" N
Longitude (NAD 83): 111° 56' 34.49" W
Datum: NAD 83
City: Tempe
State: AZ
Nearest County: Maricopa
Proposed
Site Elevation:
1166
Structure Height:
316
Total Height (AMSL):
1482
Overview
Study (ASN): 2020-AWP-7812-OE
Prior Study:
Status: Work In Progress
Received Date: 07/16/2020
Entered Date: 07/16/2020
Map: View Map
Construction Info Structure Summary
Notice Of: CONSTR
Duration: PERM (Months: 0 Days: 0)
Work Schedule:
Structure Type: Building
Structure Name: Tempe Depot - NW
FCC Number:
Structure Details Height and Elevation
Latitude (NAD 83): 33° 25' 42.58" N
Longitude (NAD 83): 111° 56' 36.44" W
Datum: NAD 83
City: Tempe
State: AZ
Nearest County: Maricopa
Proposed
Site Elevation:
1166
Structure Height:
244
Total Height (AMSL):
1410
Was this approved already by the DRC? I'm confused. The renderings I saw were atrocious.
Can somebody post the renderings of Tempe Depot?
Was this approved already by the DRC? I'm confused. The renderings I saw were atrocious.
Was this approved already by the DRC? I'm confused. The renderings I saw were atrocious.
Can somebody post the renderings of Tempe Depot?
Can somebody post the renderings of Tempe Depot?
This project is honestly horrendous. They need to kill at least 2 levels of parking and get rid of the horrible red facade. I will be shocked if Tempe allows this to get pushed through.
Why do they feel so much parking is needed? I mean it would be getting built right over the light rail tracks.
Finally some traction on this lot!! :worship:
EDIT: The development tracker on Tempe website now requires you to log-in with ArGIS....![]()
This project is honestly horrendous. They need to kill at least 2 levels of parking and get rid of the horrible red facade. I will be shocked if Tempe allows this to get pushed through.
Why do they feel so much parking is needed? I mean it would be getting built right over the light rail tracks.