Nice. I had long-since given up hope on this. A restaurant or similar was in the original Hayden Ferry plans from the 90s/early-00s. Got to love an extended cycle that is able to dredge up old plans like this.

I was wishing for more of a slender hotel to fit that corner but anything is better than what is there currently!

Some interesting notes from the recent AZBEX forum about higher education projects, most notably from Catellus (I wish I knew the parcel labeling):


Projects Coming Up

Baumes began by showing attendees what’s currently being done within the Novus Innovation Corridor, as well as highlighting a few new projects that are in the works, including:

700 Novus Place – Class A mid-rise building with approximately 154KSF of office space and approximately 11.5KSF of retail space. According to Baumes, Catellus is working with SmithGroup on the design and the project has gone through the first round of city approvals. Construction is expected to begin in the first quarter of 2021 with occupancy in the third quarter of 2023. Catellus is not yet confirmed as the vertical developer for this parcel. The University will select the development deal that is the most beneficial to them, which may or may not be Catellus.

Parcel 3A – Mixed-Use Block – a mixed-use development integrated with residential and hotel uses. Discussions are currently underway with hotel and residential developers. There is currently no timeline for construction.

Parcel 4F – Creative Office Campus 1 – three Class A office buildings with a minimum of 150KSF each. Escrow is expected to close in the second quarter of 2020, with construction starting in the third quarter and finishing in the fourth quarter of 2021.
 
Novus Innovation Corridor Map

I was wishing for more of a slender hotel to fit that corner but anything is better than what is there currently!

Some interesting notes from the recent AZBEX forum about higher education projects, most notably from Catellus (I wish I knew the parcel labeling):


Projects Coming Up

Baumes began by showing attendees what’s currently being done within the Novus Innovation Corridor, as well as highlighting a few new projects that are in the works, including:

700 Novus Place – Class A mid-rise building with approximately 154KSF of office space and approximately 11.5KSF of retail space. According to Baumes, Catellus is working with SmithGroup on the design and the project has gone through the first round of city approvals. Construction is expected to begin in the first quarter of 2021 with occupancy in the third quarter of 2023. Catellus is not yet confirmed as the vertical developer for this parcel. The University will select the development deal that is the most beneficial to them, which may or may not be Catellus.

Parcel 3A – Mixed-Use Block – a mixed-use development integrated with residential and hotel uses. Discussions are currently underway with hotel and residential developers. There is currently no timeline for construction.

Parcel 4F – Creative Office Campus 1 – three Class A office buildings with a minimum of 150KSF each. Escrow is expected to close in the second quarter of 2020, with construction starting in the third quarter and finishing in the fourth quarter of 2021.

https://www.novusasu.com
Scroll down to “Land Use Plan” and that has the parcel map.
 
I was wishing for more of a slender hotel to fit that corner but anything is better than what is there currently!

Some interesting notes from the recent AZBEX forum about higher education projects, most notably from Catellus (I wish I knew the parcel labeling):


Projects Coming Up

Baumes began by showing attendees what’s currently being done within the Novus Innovation Corridor, as well as highlighting a few new projects that are in the works, including:

700 Novus Place – Class A mid-rise building with approximately 154KSF of office space and approximately 11.5KSF of retail space. According to Baumes, Catellus is working with SmithGroup on the design and the project has gone through the first round of city approvals. Construction is expected to begin in the first quarter of 2021 with occupancy in the third quarter of 2023. Catellus is not yet confirmed as the vertical developer for this parcel. The University will select the development deal that is the most beneficial to them, which may or may not be Catellus.

Parcel 3A – Mixed-Use Block – a mixed-use development integrated with residential and hotel uses. Discussions are currently underway with hotel and residential developers. There is currently no timeline for construction.

Parcel 4F – Creative Office Campus 1 – three Class A office buildings with a minimum of 150KSF each. Escrow is expected to close in the second quarter of 2020, with construction starting in the third quarter and finishing in the fourth quarter of 2021.

Interesting that they are already planning parcel 4F way over by the power plant. If they meet their timeline I imagine those office buildings would be a little island over there for some time while the rest of Novus catches up.
 
Interesting that they are already planning parcel 4F way over by the power plant. If they meet their timeline I imagine those office buildings would be a little island over there for some time while the rest of Novus catches up.

Interesting too to read "close of escrow" meaning they are going to sell the land to another developer. I thought ASU would hold as much as the Regent's land as possible but I guess not?
 
Interesting too to read "close of escrow" meaning they are going to sell the land to another developer. I thought ASU would hold as much as the Regent's land as possible but I guess not?

True, I thought the whole purpose of Novus was to enter leases at rates that would allow ASU, given its lack of property tax, to have a long-term, stable revenue stream.
 
Maybe I should have my friend Mark Brnovich take a look into it just to make sure nothing nefarious is going on...may call up Goldwater too.
 
Maybe I should have my friend Mark Brnovich take a look into it just to make sure nothing nefarious is going on...may call up Goldwater too.

Haha. Brnovich probably feeling gunshy after getting a $1m attorney fee judgment against him in the Omni litigation.

Also, Eastline Village unanimously passed the DRC last night, which I was happy to see. Only public comment was a car-free individual in favor of the project.
 
5A and a little bleed over into 7D may also occur w/ the new proposed location of the ASU multi-purpose arena. Interesting to see what happens there as well...
 
I'm not 100% sure how the arrangement works but I do know that in lieu of property taxes ASU receives rent that's more or less the same. I suspect there's an upfront payment as part of their negotiations as well.
 
Construction begins on office building north of Tempe Town Lake

Behind a paywall but did we know this was breaking ground already? Nice!

https://www.bizjournals.com/phoenix/news/2020/02/12/construction-begins-on-office-building-north-of.html
Construction began Wednesday on the 999 Playa building on the north side of Tempe Town Lake, a project that will bring 94,000 square feet of office space for rent to the Valley’s hottest office submarket.

The $45 million office project will be the final piece of the Playa Del Norte subdivision. Derek Flottum, Irgens’ development director in Phoenix, said tenant improvements in the building will begin by the end of the year, and the building will open in May 2021. Irgens plans to move its regional headquarters into a small office space on the ground floor of the building, which also features three levels of Class A office space above three levels of parking.
 

Here's the rest:

Construction began Wednesday on the 999 Playa building on the north side of Tempe Town Lake, a project that will bring 94,000 square feet of office space for rent to the Valley’s hottest office submarket.

The $45 million office project will be the final piece of the Playa Del Norte subdivision. Derek Flottum, Irgens’ development director in Phoenix, said tenant improvements in the building will begin by the end of the year, and the building will open in May 2021. Irgens plans to move its regional headquarters into a small office space on the ground floor of the building, which also features three levels of Class A office space above three levels of parking.

“Tempe has the lowest office vacancy rate in the Valley and the ability to attract Fortune 500 companies looking to establish a presence in a business-friendly state like Arizona,” Flottum said. “We want to meet that demand with a best-in-class product.”

Andrew Cheney of Lee & Associates, who is the leasing broker for the building along with Craig Coppola and Gregg Kafka, said leasing activity so far for the building has been “ahead of schedule,” and said proposals are being issued for space in the building.

“There is incredibly high demand and not a lot of product [in Tempe],” Cheney said. “This building has a unique advantage being on the north side of the lake, with easy access to [Loop] 202 and by extension, the entire county.”

Irgens has owned the property since 2008. With the tight office market in Tempe, the company determined it was the right time to develop the building.

“When Irgens committed to buying this site in 2007, the world was different,” Ingrens CEO Mark Irgens said at the groundbreaking. “After many development plans and schemes for the site, we are finally here, and there has been a remarkable transformation in the city of Tempe.”

Scottsdale-based A.R. Mays Construction is the general contractor for the building, and Phoenix-based Worksbureau is the project architect.

According to Colliers International research, Tempe had a 5.9% Class A office vacancy rate at the end of 2019, and average Class A rent in Tempe was $39.51, making it the most expensive Valley submarket, and above the Valley’s average Class A rent of $30.08.
 
The building was discussed on the forum but it’s good to finally see it break ground. Thanks for sharing the article! :)
 
More 4-story apartments proposed for Apache, 'Blue at Eastline Village,' across the street from the proposed car-free development.