August 22, 2019: "$87M Construction Loan Closed on Westin Tempe"
https://www.connect.media/87m-construction-loan-closed-westin-tempe/
This should further speed up the construction.
That's some real confidence to finance all the demo, excavation and base work with equity/cash W/O a secured loan. Ready for this to rise!:cheers: