Novus should be topped out this week? One more floor to go. Hyatt should be topped out soon too! Not sure if there's been any leasing activity. Also I am wondering if the new developer for the Aspen Heights project is going to build it as is or if they are going to propose a new development? As for the ASU project, I think there have been some SRP crews on site I assume doing some water relocation work for the canal.
Aspen Heights project will be meeting with the Tempe JRC later this month to discuss a revision to their plans. Not sure if its with Aspen Heights or a new developer that may have purchased their plans from them. If approved, all details will be released when they go to DRC after in September.