Tempe Development Thread


View of the Mirabella construction cranes from the north end of downtown Tempe:

2s0mu4w.jpg
 
View of the Mirabella construction cranes from the north end of downtown Tempe:

Nice picture. We'll soon see a third crane in that picture--I saw going past there yesterday that the base is in place for the crane for the Hilton Canopy hotel that's part of the Union development.
 
Nice picture. We'll soon see a third crane in that picture--I saw going past there yesterday that the base is in place for the crane for the Hilton Canopy hotel that's part of the Union development.

This must be what the tower crane evaluation that was completed yesterday was for:

Overview

Study (ASN): 2018-AWP-11728-OE
Prior Study:
Status: Determined

Letters: Determination

7460-2 Forms: 07/11/2018
Supplemental Form 7460-2: Please login to add a Supplemental Form 7460-2.


Received Date: 07/02/2018
Entered Date: 07/02/2018
Completion Date: 09/04/2018
Expiration Date: 03/04/2020
Map: View Map


Sponsor Information Sponsor's Representative Information

Sponsor: Justin Gillies
Attention Of: Justin Gillies
Address: 2620 S. 55th St
Address2:
City: Tempe
State: AZ
Postal Code: 85282
Country: US
Phone: 602-509-2507
Fax:


Representative: Sundt Construction
Attention Of: Justin Gillies
Address: 2620 S. 55th St
Address2:
City: Tempe
State: AZ
Postal Code: 85142
Country: US
Phone: 602-509-2507
Fax:


Construction Info Structure Summary

Notice Of: CONSTR
Duration: TEMP (Months: 8 Days: 0)
Work Schedule: 08/18/2018 to 04/22/2019
Date Built:


Structure Type: Crane
Structure Name: SK415
FCC Number:



Structure Details Height and Elevation

Latitude (NAD 83): 33° 25' 20.60" N
Longitude (NAD 83): 111° 56' 15.00" W
Horizontal Datum: NAD 83
Survey Accuracy: 4D
Marking/Lighting: Red lights and flags
Other Description:
Current Marking/Lighting: None
Current Marking/Lighting Other Description:
Name:
City: Tempe
State: AZ
Nearest County: Maricopa
Nearest Airport: PHX
Distance to Structure: 23014.21 feet
On Airport: No
Direction to Structure: 100.86�
Description of Location: Northeast corner of University & Myrtle Avenue, South of Tempe Town lake
Description of Proposal: 235 foot tower crane standing above grade
 
Tempe still hopping. ISTB-7 is fenced and moving dirt as mentioned earlier. And they are also moving dirt across the street for the Novus projects as well. Gonna be a busy intersection. There's also a zoning sign up for a bunch of townhomes at University/Smith where a trailer park recently closed.
 
Last edited:
Tempe still hopping. ISTB-7 is fenced and moving dirt as mentioned earlier. And they are also moving dirt across the street for the Novus projects as well. Gonna be a busy intersection. There's also a zoning sign up for a bunch of townhomes in University/Smith where s trailer park recently closed.

Drove down there the other day. Great to see those empty lots fill up! A little sad to see some of the openness go away, but great progress for the area.

Seriously though...what is going on with The Pier? That tower crane costs a fortune to keep there for the amount of progress they are making.
 
Drove down there the other day. Great to see those empty lots fill up! A little sad to see some of the openness go away, but great progress for the area.

Seriously though...what is going on with The Pier? That tower crane costs a fortune to keep there for the amount of progress they are making.

I'm as curious as you are. Tempe records have listed them as "in review" for a building permit for a year plus. They are making some glacial progress on what appear to be elevator cores, but barely appear to be using the crane at all. :shrug:
 
Drove down there the other day. Great to see those empty lots fill up! A little sad to see some of the openness go away, but great progress for the area.

Seriously though...what is going on with The Pier? That tower crane costs a fortune to keep there for the amount of progress they are making.

The developer bought the crane. He's pretty much using the site as free storage.
 
Last edited:
Wow has it been that long since Skyview was proposed? Stick a fork in that one- it's done! Also this would be like the 2nd or 3rd proposal that failed for that corner. Maybe a 4/ 5 story "box" goes up in its place?
 
Seems like the City of Tempe would have a problem with this. Surely, there has to be some kind of regulation or zoning code against storing construction equipment on a lot that is not zoned for it? :shrug:

They are making progress on it. I went over there last week and they have a lot of foundation rebar in place ready for concrete.
 
That is a monster-sized photo.

Hey man not into censorship or anything but can we not use offensive language here? I read this forum at work and the last thing I need to is to get flagged for reading about skyscrapers because the IT group catches a totally unnecessary term like this. Don't wanna be a d*** but this forum gives me much-needed respite from work and blue language is everywhere...do we need when talking about 'scrapers??? Combusean???
 
Last edited by a moderator:


Back
Top