Tempe Development Thread


Signage is up for a Bubbleology tea shop in the far West retail space in the Vertex complex off Terrace east of Rural. I didn't have much hope of those spaces filing any time soon. Pretty good sign I'd say.
 
Pretty cool to do Google Street View back to 2011 and see the amount of residential construction that has clustered around the light rail. Senior housing by the 101, Fore, Gracie's, Nexa all new since then. With Metro 101, Eastline Village subsidized housing and Park Place, there will continue to be construction for a while. And :fingerscrossed::fingerscrossed: if other projects that have been sitting in the pipeline for a while like the market rate Eastline Village buildings, Gilbane project, Daybreak Apartments, ArtHAUS project etc. get built, it could finally start to look like a nice, cohesive little corridor.

Both Park Place and Gilbane have an estimated fall 2020 open for students. Same with Orange/Terrace.
 
How long has that tower crane been in the ‘pit’ at the site of the Pier? I don’t drive by it very often - was hoping when I saw it the other day that it’d show some semblance of progress.

On the other hand - the crane at Mirabella looks nice on the skyline.
 
^^^
They are working in the pit and it seems progress is slow. I drove by there the other day and saw a few workers. At this rate the opening will be summer of 2050.
 
I noticed the Jack in a Box on Mill/University with a fence around it and workers dismantling the place. Are they making room for a new development or just renovating the existing business?
 
I noticed the Jack in a Box on Mill/University with a fence around it and workers dismantling the place. Are they making room for a new development or just renovating the existing business?

Doing the same thing to the Jack on 7th St and Indian School.
 
And another one for Novus.

Aspen Heights - 95' - 262 Units - 27,000 sft Retail

Aspen.JPG


https://www.tempecenterforthearts.com/Home/ShowDocument?id=63943

https://www.tempe.gov/Home/ShowDocument?id=65418
 
I hope they paint the condo complex next door to the Jefferson to something new. The puke green and browns are throwing off the town lake color scheme on the north shore. Probably wont happen due to the HOA there but that would be a nice improvement.
 
I hope they paint the condo complex next door to the Jefferson to something new. The puke green and browns are throwing off the town lake color scheme on the north shore. Probably wont happen due to the HOA there but that would be a nice improvement.

It will be pretty hidden once Jefferson is finished, but I'm sure the next paint job will be a lighter color.

I'm just happy the lake didn't get developed 20 years ago - everything would be beige! All of the new blue/white developments look great!!
 
On Thursday the City Council will hold a first hearing to authorize the Mayor to enter a revised development agreement with Hensel Phelps to develop 100 S. Mill. Looks like it would give Hensel Phelps a GPLET (not sure if their predecessor had one), and the development plan would allow for, in addition to office, hotel OR multifamily.

Hopefully this one still has some legs :tup:

http://documents.tempe.gov/sirepub/mtgviewer.aspx?meetid=1367&doctype=AGENDA
 
Obstruction evaluation submitted for Core Campus on 7th St and Myrtle @ 252'. There were actually 4 submitted all for the same height, but will just post this one.

Overview

Study (ASN): 2018-AWP-12867-OE
Prior Study:
Status: Work In Progress


Received Date: 08/03/2018
Entered Date: 08/03/2018
Map: View Map

Construction Info Structure Summary

Notice Of: CONSTR
Duration: PERM (Months: 0 Days: 0)
Work Schedule:


Structure Type: Building
Structure Name: Core Tempe - NW
FCC Number:


Structure Details Height and Elevation

Latitude (NAD 83): 33° 25' 22.98" N
Longitude (NAD 83): 111° 56' 18.98" W
Datum: NAD 83
City: Tempe
State: AZ
Nearest County: Maricopa


Proposed

Site Elevation:
1168

Structure Height:
252

Total Height (AMSL):
1420
 
I am not sure if these projects were mentioned in previous posts, but I figured an update is needed. Here are two projects that have been approved by Tempe and I believe under construction, proposed along 7th Street between Mill Ave. and Myrtle Ave, across the street from the 7th Street Mixed-Use Development. For some reason my Imgur account won't load the images, so I provided a link to the official staff reports with renderings toward the end of the document. Once all three projects are completed, this section of Downtown will look awesome and dense!

THE WESTIN | 225 FT | 18 FLOORS

https://www.tempe.gov/Home/ShowDocument?id=54545


THE COLLECTIVE | 245 FT | 21 FLOORS

https://www.tempe.gov/Home/ShowDocument?id=62738

Renderings:
https://imgur.com/a/AY5iee2
 
Last edited:


Back
Top