The first route that makes the most sense is Rio Salado Parkway out to Tempe Mkt Place then up Mill continuing on to Apache to where it picks up the Light Rail. The second route should be from Apache and Rural to Southern where the Tempe Library, Community Center etc is then down Southern to Mill then Mill to where it hooks toward Apache. That way the maximum amount of Students, Professors and people who work in the low rises on Rio and Mill would utilize it.
Who knows what will get built, but 9 high-rise office pads is nothing to shake a stick at. This may be the deathknell for Downtown Phoenix.
Southbank Lot 1 was approved with stipulations by the DRC; they recommended that Lot 6 be denied.
http://www.tempe.gov/Home/ShowDocument?id=33733
The main rationale seems to be that Lot 1, since it's positioned along Rio Salado can serve as a transition into higher buildings along the lake; however, Lot 6 - adjacent to the lake - should be higher and have more interaction with the multi-use path, etc. They actually specifically outlined a minimum of 200' in their recommended conditions for approval.
So, you're saying that the proposed route (with an extension to TMP) makes the most sense? I just don't see how the rationale behind that. TMP is a suburban shopping center, and the land between it and the currently proposed terminus of the streetcar at Packard Drive is completely devoid of any residential uses - and connecting dense residential neighborhoods to mass transit is one of the main criteria for federal funding. TMP is well-served by the city's bus system; an expensive streetcar line just isn't necessary at this point. Once Southbank and the Stadium District is complete, then maybe - but by then, a BRT line should be running down Rural Rd which would render this useless.
The rest of the existing line doesn't accomplish anything. There are LRT stops at Mill/3rd, University/Rural, and Apache/Dorsey; an extensive bus system that serves the major streets throughout all of downtown and its immediate neighborhoods; and, the area is already very pedestrian-oriented, and filled with occupants who are willing able to walk moderate distances to reach their destinations/reach another mode of transit. Additionally, by selecting a mixed-traffic alignment for the entire segment, the streetcar's service levels and efficiency will be unpredictable and make walking or biking even more preferable. The proposed route's ridership will essentially cannibalize existing mass transit services if anything. It doesn't connect LRT to any new attractions, centers of commerce, entertainment venues, etc. within Tempe, nor does it connect any residential or commercial centers to each other that are not already serviced by other modes.
TempeSilverFox - thanks for the photos of Hanover; that would've been a great project south of The Yard along Farmer, or as a redevelopment project along University west of Mill, etc. I'm not quite sure why the DRC keeps denying Southbank projects for their lack of height and mixed-use qualities, yet let this low-rise, single-use apartment be built next to the tallest towers in the city, and adjacent to the only E-W connection between Farmer and College (5th St). Creating an active streetscape along 5th should be a priority, and since this site is surrounded by poorly-designed, outdated buildings, it was even more important to establish some kind of retail presence if the goal is for that to expand west of Mill. And, while I understand the new development shouldn't have had to cater their designs around the vision Centerpoint had for 6th Street, the view down 6th St is extremely claustrophobic as the 0-setback Hanover rectangle abuts the open plaza of W6 with the towers' retail off-set on an angle in the distance. Hanover should mirorred the angled design and positioned its main entrance at that intersection, which along with increased setbacks would have made the west end of 6th St more sensible.
Overall, with 400+ units, I'm glad they are packing in non-student, fairly wealthy residents into the center of downtown.
When those offices for State Farm open with 6 thousand employees hungry for lunch and the additional low rise at HF the low rise at Mill and Rio and more to come when ASU'S new district buildings come on line the route to TMP will be very valid indeed for electric rail . Try to overcome the myopia and project out to the future a little.
When those offices for State Farm open with 6 thousand employees hungry for lunch and the additional low rise at HF the low rise at Mill and Rio and more to come when ASU'S new district buildings come on line the route to TMP will be very valid indeed for electric rail . Try to overcome the myopia and project out to the future a little.
We are all pretty worried about that!
I actually move in November to the main building (assuming I'm still in the same position) Ill take pictures!
Update, Actually a lot of work going on at the Grand At Papago lots of dirt moving.
Liberty Trust is almost built out
The Retail at 54th street is already framed out in cinderblock, a Starbucks is announced as tenant.
54th and what?
http://www.bizjournals.com/phoenix/...l-wants-to-bring-hotel-conference-center.html
I get USA Place is dead. I'm not understanding the point of this article. They say no new RFP is being created. Does that mean they are still looking for people to respond to the original? Does it mean perhaps talks are still ongoing with Omni? Or does it mean this is so far out in the future now that no RFP will take place for the foreseeable future? Sounds like the latter to me... in which case, I see no point to this article.
You're basically saying ASU still wants a hotel & convention center but isn't going to issue a RFP anytime soon?! :shrug:
When those offices for State Farm open with 6 thousand employees hungry for lunch and the additional low rise at HF the low rise at Mill and Rio and more to come when ASU'S new district buildings come on line the route to TMP will be very valid indeed for electric rail . Try to overcome the myopia and project out to the future a little.
Will also have 100 Mill, Flour Mill Hotel & Concert Venue, HFL 3, SALT and Marriott AC right there. That is going to generate ALOT of traffic. I think this is a good thing and support the street car.
Luckily, as I mentioned, Tempe has multiple mass transit options, so the workers in this 1 office building can take the 72 bus route from Mill Ave/3rd to Rural/Rio Salado, reducing their travel to just .20 miles. A person willing to take the streetcar to Marina Heights is just as willing to take LRT + either a short bus ride or short walk.
...
As far as looking to the long-term and potential ASU buildings toward McClintock, again - bus service already exists. And, BRT is planned for Rural/Scottsdale Rd. $200 million is a lot of money to spend on serving the needs of people who already have several options available to them/to offices and commercial buildings that are already centrally located and easily accessible. That's $200 million that could have easily been spent on more effective modes, more efficient modes, connecting more riders to the greater transportation network and/or to commercial areas not currently served. For the record, ~10 miles for BRT could have been built for the same cost... that's a line from Warner to just short of McKellips. But, yes, it's far smarter to give ASU students along Apache a quicker trip down to Mill Ave.
6 million "lunch hungry office workers" ...? Are you for real? This is a $200 million mass transit line, not a lunch-time trolley. We are talking about Downtown Tempe and a project with $1 million square feet of its own retail. If these workers can't walk to Mill, pack a lunch, or find something to their taste just outside their lobby (maybe even WITHIN their lobby), then a $200 million streetcar isn't going to fix their problems. And, I'm being myopic?
Similarly, I do take the light rail all the time and would take a street car regularly. I've taken the bus however once in my life. And I probably won't again.
...and that's a set of consumer preferences I hear a lot (for understandable reasons). It's something that always needs to be kept in mind when arguing that money should be spent on BRT rather than rail projects. I support improving regular bus service because those who use that mode deserve a better experience, but I have little illusion that buses, no matter how enhanced with BRT amenities, will ever attract discretionary passengers and catalyze development in the way that rail can.
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]I would agree with your assumption. AFAIK, ASU is required to go to RFP for its projects, and I can't imagine it being legal for them to simply extend the submission deadline and accept new bids without formally releasing new request. As far as working with Omni, I'm not positive, but I believe the contract with ASU was exclusive to the development team. USA Place/Concord Eastridge + co. were responsible for securing the partnership with Omni. If Omni is still interested in the Tempe market, they would still need a developer to manage the land acquisition, construction, etc. for the structure... a developer that would need to be selected by ASU from a new RFP if Mill Ave/University were to be the site. It would otherwise be like PF Changs building a standalone restaurant on Patriots Square Park is RED had bailed out of CityScape just because they had committed to being a tenant at one point.
6 million "lunch hungry office workers" ...? Are you for real? This is a $200 million mass transit line, not a lunch-time trolley. We are talking about Downtown Tempe and a project with $1 million square feet of its own retail. If these workers can't walk to Mill, pack a lunch, or find something to their taste just outside their lobby (maybe even WITHIN their lobby), then a $200 million streetcar isn't going to fix their problems. And, I'm being myopic?
Assuming you realize that transit should serve more purposes than shuttling hungry office workers to Subway, here is why the line makes no sense. There is a light rail stop at 3rd St./Mill Avenue; the furthest new building out of the 7 projects mentioned that are planned to open within the next few years is State Farm's eastern-most office tower. A walk to that office from the light rail is .75 miles, and about 15 minutes. The accepted standard for the distance users are willing to travel is .50 miles. Luckily, as I mentioned, Tempe has multiple mass transit options, so the workers in this 1 office building can take the 72 bus route from Mill Ave/3rd to Rural/Rio Salado, reducing their travel to just .20 miles. A person willing to take the streetcar to Marina Heights is just as willing to take LRT + either a short bus ride or short walk.
I agree that these projects are going "to generate A LOT of traffic." That's why money should be invested into new transportation lines that will actually reduce that traffic and supplement what already exists. How many people who will be working at these new offices do you actually think will be living within .50 miles of a proposed stop? The most likely places are in one of the apartments along Apache from Rural - McClintock, at Playa del Norte, in Downtown Tempe, or in the neighborhood immediately west of Mill. ALL of those areas are served by light rail, bus, or Orbit - many of them are served by both. Tempe is also one of the most bike-friendly cities in the region.
The reality is that a very small number of people working in these new offices are going to use mass transit instead of their car given the enormous, free parking garages each is building and the necessity of owning a car to go pretty much anywhere else in the metro area. If a car-less lifestyle were attainable, and/or parking made less convenient, perhaps that number would grow. Regardless, a streetcar operating in mixed traffic in the same area as other modes of transportation will not do either of those things.
As far as looking to the long-term and potential ASU buildings toward McClintock, again - bus service already exists. And, BRT is planned for Rural/Scottsdale Rd. $200 million is a lot of money to spend on serving the needs of people who already have several options available to them/to offices and commercial buildings that are already centrally located and easily accessible. That's $200 million that could have easily been spent on more effective modes, more efficient modes, connecting more riders to the greater transportation network and/or to commercial areas not currently served. For the record, ~10 miles for BRT could have been built for the same cost... that's a line from Warner to just short of McKellips. But, yes, it's far smarter to give ASU students along Apache a quicker trip down to Mill Ave.
Hi all! I went for an evening stroll and wanted to share photos of some of the projects at or near Tempe Town Lake!
I apologize in advance for the large size of all the photos. I don't have the patience to figure out how to make them smaller lol, and I know it's a bit dark, but it was the only time of day it felt ok to be out and about. Here they are