If I am not mistaken, those courts have been there since Sonora was built.
The basketball court was there but I recall them constructing the tennis courts last summer. You can see here from this Google satellite view.
If I am not mistaken, those courts have been there since Sonora was built.
I was driving home from work yesterday on the 202 and I noticed that some preliminary site work has started on the State Farm/ Marina Heights Development. I noticed a tractor digging up some earth and the side closest to the lake. I also thought I saw some trailers on-site at lot 59.
The Hub and Marriott aren't much better.The Hub is just so overwhelming; the design is really awful in terms of just how massive it is. The L should've been reversed at least, but ideally it should've been 2 towers. Regardless, it's extremely claustrophobic as is and dumping the most oppressive materials and color palette did it no favors.
Great photos, though! Is Block 12 topped out? Is a crane common for a 6-story building?
The parking lots along Forest, Myrtle, and surrounding Chili's are so depressing, especially knowing 1) what was there and demolished, and 2) what was proposed to take their place. I hope the most recent news surrounding the Chili's property is finally the real deal and that it addresses that entire site and not just the Mill/Uni corner.
The University Square lot really needs something above 10 stories. That's a really important piece (along with the M7 site) in shaping downtown and could make or break giving Tempe a (small) skyline (to complement The Hub, Marriott, etc.); connecting Mill with ASU, College Ave, etc.; bringing density east of Mill; helping solidify the northern part of campus as having more of an urban fabric with commercial/non-University projects mixed into educational buildings and such.
Nice pictures. Hopefully the Marina Heights and Hayden Ferry start construction soon. That dorm between the Hub and the new Marriott is horrendously ugly.
Yes, Block 12 is topped out, well half of it, the other half still has to be poured. But the height we see is the final height. And cranes are common for all cast in place concrete work like this. Those forms are really heavy, so a crane is a must.
As for the Chili's parking lot, something is coming soon. But what was there before the parking lot was a really awful strip mall which had huge mold issues. ASU had used it for storage, but the conditions got so bad that they had to demolish it. I'm not a fan of parking lots, but I think it is better than a one story stucco-clad health hazard. Especially knowing that ASU is wanting to develop the lot, and it is just a matter of time before we see that.
On a related note, final plans were selected for the University (Priest-Ash) and Broadway (Mill-Rural) streetscape projects, scheduled for late 2014 and early 2015.
1) University: http://www.tempe.gov/modules/showdocument.aspx?documentid=17674
This plan is rather underwhelming, though the new/enhanced bike lanes will be a benefit. There's no shade on either the north or south sides of the street, with the only landscaping being within the new center medians. However, even those were reduced from earlier stages of the plan to allow for more left-turn availability.
2) Broadway: http://www.tempe.gov/modules/showdocument.aspx?documentid=18645
The selected concept includes the removal of 1 eastbound lane, addition of bike lanes in both directions, a new 8' privacy wall on the north side, and shaded sidewalks on the south. It does seem a bit strange that there is no sidewalk on the north end, though... no?
The lack of shade in the University plan is disappointing, although I suppose that could be added later. Two aspects of the plan that I like: 1) New signalized intersections at Roosevelt and Farmer. Right now, there's a long segment between Hardy and Ash where it's difficult for a pedestrian or bicyclist to cross University. Also, more frequent signals should have a traffic calming effect. 2) The strip with a differentiated texture separating the bike lane from the rest of the street. My hope is that this will produce a rumbling feel for the drivers of any cars that stray into the bike lane, giving motorists an opportunity to correct before doing any harm.
My biggest concern is that this plan seems to stop at Ash, but the intersection of Ash and University needs attention. It's currently configured so that cars traveling either way on Ash must turn onto University rather than crossing it. That results in the bike lanes being put in the middle of the street between left and right turns lanes. Unfortunately, there a lot of drivers, many on them heading into the Chase garages, who disregard the signs and cross over the bike lanes. A redesign of the intersection may be necessary to make it safer.
As for Broadway, I think there are currently sidewalk along the frontage road on the north side of the street. I doubt this project will remove those. It could be that the sidewalks don't show up on the project drawings simply because they won't be changed and are therefore outside the scope of the project.
While not incredibly exciting, the Panda Express is finally under construction on the corner of Rural and Broadway. Staples will be going in next to the Safeway, they will use the excess space to the west.
Really excited to see Tempe in a month or so when all of the new projects (Manzanita, The Hub, Marriott, The District, Sun Devil Fitness Center, Power Parasols) are completed and all of this street maintenance is done!
The master plan for Arizona State's main research library defines an exceptional research and learning environment for the 21st century, at the heart of the Tempe campus. The plan re-envisions the library as a dynamic intellectual hub for the University's growing population, giving physical form to the vision set forth in the its ambitious institutional strategic plan.
The plan reorients the space from a collection-intensive facility to a patron-focused learning environment, with enhanced research and study spaces, a robust technology and instructional hub, consolidated staff space, and newly prominent and accessible special collections. Strategic decisions about the location of portions of the collection were addressed.
The plan also leverages the library's location at the crossroads of two key pedestrian axes to address a dearth of open space on the campus. A proposed expansion reclaims the sunken courtyard and moat surrounding the library for new, programmable space with a green roof that becomes an extension of the campus' central quad. A new entrance pavilion along one axis will serve as a beacon for the University community.
The phased five-year renovation and expansion will permit uninterrupted library operations.