ASU moves ahead with priciest building ever
Arizona State University is moving forward to build the most expensive single building in the institution’s history despite the sluggish economy and uncertainty over the state budget.
The $185 million science-and-technology building is planned on the site of a parking lot south of the Biodesign Institute on the Tempe campus.
Rich Stanley, university planner, said officials are finalizing a contract and price with the builder. But he acknowledged they are keeping a close watch on state finances and the university’s overall funding situation before they decide to break ground.
“We have every intention of moving forward,” he said.
All three state universities have seen steep cuts in their state funding this year, and students have seen sharp tuition increases. But university officials are looking at the building as a way to generate more revenue. The building will create more research space with the goal being to bring in additional research grants.
The university plans to finance the structure by using research grant money, a portion of which can used toward general university overhead.
Research funding “is not threatened by the recession,” Stanley said.
The seven-story, building will house earth and space sciences, climate science and renewable and alternative-energy research. The facility, called Interdisciplinary Science and Technology Building IV, fits into ASU President Michael Crow’s vision of ramping up research in energy, engineering and sciences.
Stanley said that once ground is broken, it should take about two years to complete the 293,000-square-foot building. He described the project as very complicated because of the 88,185 square feet of lab space requires more plumbing and special air-filtration systems.