sundevilgrad
New member
the sign is ON the building tho
Probably for no other reasone than it makes a good stand for the time being...
the sign is ON the building tho
Nov. 1? Thanks a lot, that gives us a lot of time to completely revamp the design. I agree with both parties quoted in the article. I think the developer has a good point, and that he can "leave this building alone," as requested by the commission. I think a project bringing this density to the end of Mill will extend the activity of Mill at the pedestrian level, something the north end of Mill really lacks right now, with the mill itself fenced off as well as the parking lot for US Airways.To the post above I do like the Monti's design its to bad they now have to redesign the project
http://www.azcentral.com/arizonarepublic/local/articles/1020evmontis1020.html
"I would request that you go back to the drawing board and see what you can come up with and leave this building alone," said commission member Ann Patterson.
The commission told developers to come back to the Nov. 1 meeting with revised plans.
Pre-wetting a site may be a dust-control requirement, or it's possible they're selling the dirt from the parking garage and the buyer made arrangements to have the moisture increased, or maybe they're wetting the surface parking areas because of recommendations made in the geotechnical report (which deals with issues of soil plasticity, expansion/collapse potential, and a variety of other extremely boring engineering/dirt terms). So really I have no idea why they would be pre-wetting the site, but I'm sure it's nothing too out of the ordinary.I was over by the Mosaic lot today, and I can't tell what they're doing. There's a huge pile of dirt/gravel in one corner of the lot and they had some type of makeshift sprinkler system set up water the lot... I thought they might be trying to soften up the ground before they began actual digging, but why would you do that if you had a big earth-mover?
Pretty sure they would have advertised, were that the case. Plus it's almost too cool for such behavior, at least outside. Not to say I wouldn't enjoy such an event...![]()
Bandersnatch Brew Pub is scheduled to come tumbling down starting Thursday.
The gritty, downtown Tempe watering hole operated at the intersection of Fifth Street and Forest Avenue, a quick halftime walk from Sun Devil Stadium, for about three decades. It is slated to be replaced with a sleek new 11-story Marriott Residence Inn and parking garage.
A demolition crew will begin Thursday by removing the signs, ironwork art and handmade stained glass from inside the bar. Those pieces, along with the unique wooden front entry doors and a wood sculpture inside, are going to be squirreled away so they can be used to decorate the new Marriott's hotel bar, according to Darcy Gray, of Layton Construction.
The building itself will come down starting Friday. Clearing the site should take a four-person work-crew up to two weeks, Layton said.
Construction is expected to begin on the Marriott in mid-January, and it would open about 15 months after that.
There is also some activity on ASU block 12 inbetween forest and college ave. Anyone know what's happening there?