Tempe Development Thread


News article on the ASU website about upcoming capital projects for this year.

https://news.asu.edu/20260213-unive...projects-2026-will-include-2-iconic-buildings

Notable Tempe items:

1) McCain Center beginning construction up by Mill and Curry.
2) ASU will be demolishing the Arcadia dorms (Best/Irish/Hayden halls) and replacing then with a new 800 bed residential hall (so about the same size as the recently built Mill Avenue dorms). Demolition will occur this summer with construction of the new dorm scheduled to be completed in time for the Fall 2028 semester.
3) Upgrades to Wells Fargo arena and Physical Sciences H labs.

Item 2 is particularly cool, I thought this work was still further out. By far the most outdated dorms on the campus. Presumably will be ~7 floors as most ASU dorm buildings built this century have been.
 
Not sure if it's been discussed or not but are they seriously going to leave that Tempe Town Lake development covered in fiber cement board like that? It's fucking disgusting.
 
Had been wondering if we would see something like this ever since the Mill Ave Pita Jungle decided not to renew their lease that ended last year: New Preliminary Site Plan Review (PSPR) for a mixed used multi-family development at the NE corner of University and Mill (address 4 E. University), this is for the building that used to house Pita Jungle and still houses the T-Mobile.

https://epermits.tempe.gov/CitizenA...D3=003I0&agencyCode=TEMPE&IsToShowInspection=

PSPRs are often the first public facing filings for big developments, so they are fairly vague e.g. we dont have any information about height/density. Its early so one could foresee these developers inquiring about purchasing the Jack in the Box for the dev as well but for now its just the Pita Jungle parcel. Obviously this is a location where first floor retail is an absolute necessity. Its good to see a filing like this, because most of the big downtown developments that got approvals in the 2023/2024 time period are under construction or seem to be in the last permitting steps, so its nice to have another potentially big project coming down the pipeline. Hopefully more to come!
 
News article on the ASU website about upcoming capital projects for this year.


2) ASU will be demolishing the Arcadia dorms (Best/Irish/Hayden halls) and replacing then with a new 800 bed residential hall (so about the same size as the recently built Mill Avenue dorms). Demolition will occur this summer with construction of the new dorm scheduled to be completed in time for the Fall 2028 semester.

Construction fence is up around the whole block, between College and Forest and Apache and Lemon, appears demo activities have started.
 
Does anyone know if that hotel project on College Ave is dead? I think they went to the City twice with two proposals with different heights. It was suppose to have a rooftop bar. I think that building has hosted various bars and offices.
 
Joint Committee Recommends PAD Amendment for Phase V Novus Site

https://azbex.com/local-news/joint-committee-recommends-pad-amendment-for-phase-v-novus-site/

The Arizona State University and City of Tempe Joint Review Committee has recommended approval of a planned area development overlay amendment that will enable the next round of development in the Novus Innovation Corridor.

The recommendation was approved in a 7-0 vote at the Committee’s March 4 meeting.

AZBEX has published nearly 50 articles and news items about NIC on our website over the years. Those pieces are available here.

NIC master developer Catellus Development Corporation has requested a zoning map amendment and zoning code text amendment for roughly 5.5 acres at the NWC of Rural Road and Rio Salado Parkway, just east of Phase I of the Marina Heights development.

According to the submitted materials, “The applications will remove the Marina Heights East PAD Overlay from the site and apply use parameters and development standards associated with (ASU Athletic Facilities District Planning Area) Rio Salado and Rural Mixed-Use Subdistrict to the site.”

PD-Novus-5F-PAD-Change-Aerial-768x405.png
 
Looks like demolition permits have been filed for the former Hide Away Motel site at the SW corner of Apache and Oak. This is to make way for a 20 unit townhome development that was approved last year. IMO this parcel is the worst remaining blight on the corridor (along with the former Mius Cuisine next to La Victoria Commons) as this motel has been shuttered for almost a decade now, so this is fantastic news. Great for the site to finally get new life.

https://epermits.tempe.gov/CitizenA...D3=004C6&agencyCode=TEMPE&IsToShowInspection=
 
Had been wondering if we would see something like this ever since the Mill Ave Pita Jungle decided not to renew their lease that ended last year: New Preliminary Site Plan Review (PSPR) for a mixed used multi-family development at the NE corner of University and Mill (address 4 E. University), this is for the building that used to house Pita Jungle and still houses the T-Mobile.

https://epermits.tempe.gov/CitizenA...D3=003I0&agencyCode=TEMPE&IsToShowInspection=

PSPRs are often the first public facing filings for big developments, so they are fairly vague e.g. we dont have any information about height/density. Its early so one could foresee these developers inquiring about purchasing the Jack in the Box for the dev as well but for now its just the Pita Jungle parcel. Obviously this is a location where first floor retail is an absolute necessity. Its good to see a filing like this, because most of the big downtown developments that got approvals in the 2023/2024 time period are under construction or seem to be in the last permitting steps, so its nice to have another potentially big project coming down the pipeline. Hopefully more to come!

I've seen the preliminary site plans for this project and the boundaries do include the Jack in the Box parcel as well as the Pita Jungle/T-Mobile building. While it's still too early in the process to verify with certainty the proposed building height and density, this project will have similar look and feel of recent high-rise developments in the area. Anticipate around 20-stories.

If this corner, 20 E University, and the NWC of Myrtle/University all construct their respective towers within the next few years, this block could easily become one of the densest in the entire state.
 
I've seen the preliminary site plans for this project and the boundaries do include the Jack in the Box parcel as well as the Pita Jungle/T-Mobile building. While it's still too early in the process to verify with certainty the proposed building height and density, this project will have similar look and feel of recent high-rise developments in the area. Anticipate around 20-stories.

If this corner, 20 E University, and the NWC of Myrtle/University all construct their respective towers within the next few years, this block could easily become one of the densest in the entire state.

The Myrtle/University tower is Skye Tempe correct? Do you know what the delay there has been about? They were approved back in 2023 & it feels like nothing has been happening with the plot.
 
The Myrtle/University tower is Skye Tempe correct? Do you know what the delay there has been about? They were approved back in 2023 & it feels like nothing has been happening with the plot.

Skye Tempe is very much still active, they applied for their building permit in January which is being processed and they also applied for a couple of easements (water line etc) so they seem to be on the final steps before construction. They took a bit longer than some of the other projects approved at the same time but 2.5 years isnt that unusual. They did have to do a particularly thorough archeological study because it was a rare site where literally no study had been done before (many areas have had at least cursory studies) but I think most of the hold up has been securing financing, par for the course for large multifamily projects.
 
I've seen the preliminary site plans for this project and the boundaries do include the Jack in the Box parcel as well as the Pita Jungle/T-Mobile building. While it's still too early in the process to verify with certainty the proposed building height and density, this project will have similar look and feel of recent high-rise developments in the area. Anticipate around 20-stories.

If this corner, 20 E University, and the NWC of Myrtle/University all construct their respective towers within the next few years, this block could easily become one of the densest in the entire state.

The height limit on Mill itself is 100', I'm not sure how deep into the block it is, but it would definitely have to take into account these constraints and is probably the reason that part of Downtown Tempe has struggled to redevelop as it's hard to make buildings pencil (they have highrise expenses but not enough leasable sqft). There was at least another proposal for that hard corner which hit the 100' limit but never went anywhere.
 
The height limit on Mill itself is 100', I'm not sure how deep into the block it is, but it would definitely have to take into account these constraints and is probably the reason that part of Downtown Tempe has struggled to redevelop as it's hard to make buildings pencil (they have highrise expenses but not enough leasable sqft). There was at least another proposal for that hard corner which hit the 100' limit but never went anywhere.

I think like the Hilo project you can go taller on Mill but have to have setbacks at either 2 or 3 stories to try and preserve the human scale feel of Mill…

Does anyone know what’s going on with Culdesac? They are suppose to have started on their next phase by now but it doesn’t seem like any movement is happening. I am wondering if they are going to be able to move forward with their Mesa site too…
 
The height limit on Mill itself is 100', I'm not sure how deep into the block it is, but it would definitely have to take into account these constraints and is probably the reason that part of Downtown Tempe has struggled to redevelop as it's hard to make buildings pencil (they have highrise expenses but not enough leasable sqft). There was at least another proposal for that hard corner which hit the 100' limit but never went anywhere.

This block of Mill has lot depths ~125' deep, not nearly as deep as the recent high-rise developments on 7th St east of Forest, which certainly factors into the developability of these parcels into something greater than a few stories. Height-wise, City Center zoned districts have a surprisingly low max building height of 50' which is upped to 150' on certain segments on Mill, based on the 2006 Community Design Principles-- though the latter figure is non-regulatory so the Code generally prevails. I think where this applicant may succeed where others have failed, is in requesting a PAD rezone to support increased height at this location and redeveloping multiple parcels thereby stretching the building along the Mill frontage.
 
I was driving down priest today and noticed that the lot east of the Dutch Bros HQ along priest and the river is fenced off with a construction trailer. Does anyone know what’s going up on that lot??
 
955 E University

There has been some earthwork activity at 955 E University.

My guess is that this is archeological excavations due to the proximity to the O'odham village that was uncovered during the 8th Street multi-use path project.

https://www.tempe.gov/government/community-development/planning/historic-preservation/eighth-street-archaeology-report

Could potentially be some utility relocations as well, seems like there has been some delay to completing demo due to the cell tower present on the site.

Hope to see this project get started soon. Almost a shame that there aren't some retail uses oriented to the 8th Street ROW now that there such nice pedestrian space with the completion of the streetscape project.