azsunsurfer
New member
Also they will be previewing the other Apache and McClintock scheme
I saw it up as well, thought maybe I missed that there was three before... but I guess there is another crane up! Excited, will do the lake walk today to check on the progress and post photos.
Did anyone get renderings for the new Apache McClintock development (NW Corner not SW) or the Verve project presented at the last DRC Study Session? Minutes/ video was not posted...
This article from a few months back had renderings of Apache/McClintock:
![]()
https://azbex.com/planning-development/167-unit-mixed-use-planned-at-apache-and-mcclintock/
No....as I said that's the SW corner...I am talking about the NW Corner....that was supposedly presented in the study session last week... Trying to find renderings of that project.
Construction recently completed on the highly anticipated, $42 million, six-level, 429,000-square-foot Mill Avenue Parking Structure for Arizona State University (ASU) in Tempe, Ariz. The structure is located at 951 S. Mill Ave. in Tempe, east of Mill Avenue between 9th and 10th Street.
“For several years we have been diligently working on transforming what we call the Block 22/27 portion of the University from a low density and under-utilized piece of our campus,” said Alexander Kohnen, vice president of facilities development and management for Arizona State University. “This parking garage will allow members of the University community and visitors alike to take advantage of the new facilities we have created on the Block.”
To enhance the exterior look, the parking structure’s north and south faces feature a vertical metal screen composed of thin blades set at various angles for a distinctive look that is not typical of a parking facility. Its design allows for increased vehicle traffic flow through the garage’s different levels. During high traffic events, the entrance has a reversible gate arm that allows increased flow upon entry and can be reversed to increase flow after an event for more efficient exiting.
Construction on the related $88 million Mill Avenue Academic and Office Space (Wrap) structure surrounding the garage began in January and is expected to complete in August 2024. The five-story, design-build structure, which is connected to the parking garage, will feature 126,000 square feet of multiple academic, administrative, and retail spaces. The third floor of the wrap has been designed with an extensive sound isolation system to control external and internal sounds for instrumental practice rooms, group rehearsal and ensemble rooms and recording studio rooms. The wrap also has designated spaces for Esports, research labs, computer labs, filming/photography spaces, office spaces and flex-use areas.
The
I have to wonder if there's an American suburb that has rebuilt itself as much as Tempe over the years. /QUOTE]
Its got to be one of the more influential and heavily dense suburbs out there. But If it wasn't so small in population its already practically twin city situation in terms of economic importance. The size difference is just so heavily in the Phoenix direction.