Tempe Development Thread


Its interesting that neither of these articles on a new ISTB-7 say anything about timelines. This are some amazing renderings and design ideas to tout for publicity but look at the current area. The car wash is in the way and occupied, the shitty old building at the SEC of Mcallister and University will need to be vacated by whatever ASU department is in there, and the loss of parking at the Tyler St parking structure will need to be addressed, half of the land in the renderings isn't even owned but ASU (AZBoR) and don't even get started on utilities that crisscross those lots. And to bring it to a depressing low, ASU has a history or showing off innovative building projects and never building them. Sorry for being a Debbie Downer but there are a lot of hurdles to jump before this becomes reality. I want to see this get built and most of the problems I called out are manageable but I'm not holding my breath.
 
Its interesting that neither of these articles on a new ISTB-7 say anything about timelines. This are some amazing renderings and design ideas to tout for publicity but look at the current area. The car wash is in the way and occupied, the shitty old building at the SEC of Mcallister and University will need to be vacated by whatever ASU department is in there, and the loss of parking at the Tyler St parking structure will need to be addressed, half of the land in the renderings isn't even owned but ASU (AZBoR) and don't even get started on utilities that crisscross those lots. And to bring it to a depressing low, ASU has a history or showing off innovative building projects and never building them. Sorry for being a Debbie Downer but there are a lot of hurdles to jump before this becomes reality. I want to see this get built and most of the problems I called out are manageable but I'm not holding my breath.

In all, it's just a concept by a local firm. Also, don't believe anything is occupying the old Papa Johns/ Americas Taco Shop and if the price was right the car wash can be bought. The shitty old building at the SEC of Mcallister and University is Research Support Services which I'm sure could be temporarily relocated if it ever comes to it.
 
In all, it's just a concept by a local firm. Also, don't believe anything is occupying the old Papa Johns/ Americas Taco Shop and if the price was right the car wash can be bought. The shitty old building at the SEC of Mcallister and University is Research Support Services which I'm sure could be temporarily relocated if it ever comes to it.

The restaurant space is empty. When ATS moved out, I assumed it was in preparation for more intensive development. Whether this specific concept is built or not, something will eventually happen at this strategic corner.
 
I think ASU has control of that entire corner....they have shown it as proposed educational space for some time now on their masterplan(s).

I drove by Watermark last night and they were doing a foundation pour late thru the night! Hopefully we get a crane soon! They are really moving on it.
 
This may have been posted already, but I like some of the ideas listed in the slideshow. A highline walkway sounds pretty cool.

http://www.statepress.com/article/2...team-up-to-provide-new-transportation-options

A monorail through campus? jesus christ please no, They already ruined large chunks of campus with the terrible fucking solar panels that will be torn out in 10 years probably. What a waste

Closing university will cause more harm than good to trafic and city flow.

I can get behind the high line walkway.
 
I can see a tower crane being assembled on The Peir site off the freeway!!!!

Please don't tease us! I can't wait for this one! Now Tempe just needs to land another big corporate or regional HQ like State Farm.

Oh, wonder what happened to the losers at the 100 Mill development?!
 
I can see a tower crane being assembled on The Peir site off the freeway!!!!

iDttdgQh.jpg
 
There's a crane evaluation that was submitted on the 10th for 308' for "ASU Phase 2". Anyone know what ASU phase 2 is?

Overview

Study (ASN): 2017-AWP-10993-OE
Prior Study: 2016-AWP-1002-OE
Status: Work In Progress


Received Date: 10/10/2017
Entered Date: 10/10/2017
Map: View Map

Construction Info Structure Summary

Notice Of: CONSTR
Duration: TEMP (Months: 12 Days: 0)
Work Schedule: 02/01/2018 to 01/31/2019


Structure Type: Crane
Structure Name: ASU Phase 2
FCC Number:


Structure Details Height and Elevation

Latitude (NAD 83): 33° 25' 34.84" N
Longitude (NAD 83): 111° 55' 53.53" W
Datum: NAD 83
City: Tempe
State: AZ
Nearest County: Maricopa


Proposed

Site Elevation:
1207

Structure Height:
308

Total Height (AMSL):
1515

https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=345805420&row=1
 